NYSDOT contract D265807 bid tabulation
2025 Paving Contract (West) Route 5A, 12B & 26. Let by New York State DOT on July 30, 2026, Chenango, Madison, Oneida, Region 02. 4 bids received; low bid $2,580,581 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 30 JUL 2026
- Pay items
- 73
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $2,580,581 | Low |
| 2 | Heidelberg Materials Northeast LLC | $2,755,059 | +7.0% |
| 3 | Barrett Paving Materials Inc | $2,899,330 | +12% |
| 4 | Dolomite Products Co Inc | $3,033,222 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. Heidelberg Materials Northeast LLC | 3. Barrett Paving Materials Inc | 4. Dolomite Products Co Inc |
|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 178 | $74.00 | $79.00 | $99.00 | $70.00 |
| 2 | Select Granular Fill (203.07) | CY | 12 | $104.00 | $275.00 | $181.00 | $260.00 |
| 3 | (203.24010017) | 36 | $75.50 | $90.00 | $76.80 | $170.00 | |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 44 | $80.00 | $73.00 | $48.00 | $350.00 |
| 5 | Subbase Course, Type 2 (304.12) | CY | 95 | $137.00 | $265.00 | $237.00 | $175.00 |
| 6 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 326 | $105.00 | $105.00 | $105.00 | $105.00 |
| 7 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 204 | $105.00 | $105.00 | $105.00 | $105.00 |
| 8 | (404.0982) | TON | 3,000 | $132.00 | $130.00 | $120.00 | $110.00 |
| 9 | (404.2589) | TON | 49 | $212.00 | $205.00 | $160.00 | $190.00 |
| 10 | (404.3789) | TON | 72 | $191.00 | $200.00 | $157.00 | $165.00 |
| 11 | (406.1282) | TON | 3,700 | $154.00 | $123.00 | $117.00 | $140.00 |
| 12 | Straight Tack Coat (407.0103) | GAL | 4,300 | $5.15 | $2.50 | $3.12 | $8.00 |
| 13 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 56,000 | $0.45 | $0.48 | $0.50 | $0.90 |
| 14 | (490.17011018) | 66,400 | $3.20 | $2.75 | $4.20 | $3.50 | |
| 15 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 12 | $997.50 | $900.00 | $700.00 | $1,200.00 |
| 16 | (520.51000006) | 19 | $119.00 | $108.00 | $51.20 | $22.00 | |
| 17 | Shields and Shoring (552.17) | SF | 400 | $12.80 | $2.50 | $3.00 | $7.00 |
| 18 | (603.6010) | LF | 10 | $339.70 | $409.00 | $700.00 | $600.00 |
| 19 | Concrete Collars (603.77) | EACH | 2 | $1,870.00 | $3,300.00 | $1,160.00 | $3,700.00 |
| 20 | (603.97000002) | 2 | $1,119.00 | $565.00 | $411.00 | $500.00 | |
| 21 | (604.070201) | EACH | 27 | $1,188.00 | $1,485.00 | $1,600.00 | $4,100.00 |
| 22 | (604.070202) | EACH | 14 | $1,188.00 | $4,970.00 | $4,200.00 | $6,200.00 |
| 23 | (604.300711) | LF | 6 | $1,431.00 | $1,150.00 | $1,300.00 | $1,300.00 |
| 24 | (608.01060415) | 1,500 | $58.25 | $61.00 | $52.00 | $50.00 | |
| 25 | (608.01070415) | 1,472 | $96.00 | $100.00 | $116.00 | $130.00 | |
| 26 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 3 | $438.50 | $900.00 | $345.00 | $650.00 |
| 27 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 84 | $165.00 | $315.00 | $126.00 | $175.00 |
| 28 | (609.0401) | LF | 70 | $96.00 | $254.00 | $240.00 | $140.00 |
| 29 | (609.04010510) | 98 | $101.00 | $263.00 | $173.00 | $140.00 | |
| 30 | (609.28200010) | 66 | $212.50 | $178.00 | $327.00 | $150.00 | |
| 31 | Topsoil - Lawns (610.1403) | CY | 22 | $301.75 | $263.00 | $270.00 | $260.00 |
| 32 | Sodding (610.18) | SY | 250 | $27.75 | $20.00 | $25.00 | $23.85 |
| 33 | (617.01030024) | 6 | $540.00 | $200.00 | $200.00 | $175.00 | |
| 34 | (617.10000024) | 6 | $540.00 | $250.00 | $128.00 | $175.00 | |
| 35 | (617.11000024) | LS | 1 | $2,915.00 | $800.00 | $950.00 | $1,400.00 |
| 36 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $213,000 | $441,000 | $538,625 | $454,600 |
| 37 | (619.0901) | LF | 33,000 | $0.35 | $0.30 | $0.30 | $0.51 |
| 38 | (619.110513) | EACH | 3 | $2,167.00 | $6,000.00 | $5,600.00 | $3,000.00 |
| 39 | (619.110613) | WEEK | 12 | $505.00 | $700.00 | $708.00 | $800.00 |
| 40 | (621.51950006) | 956 | $2.50 | $7.40 | $7.00 | $6.00 | |
| 41 | Survey Operations (625.01) | LS | 1 | $26,000 | $30,000 | $31,000 | $65,000 |
| 42 | (627.50140008) | 430 | $7.65 | $15.00 | $5.00 | $9.00 | |
| 43 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 100 | $94.45 | $165.00 | $267.00 | $250.00 |
| 44 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 450 | $97.75 | $118.00 | $77.00 | $150.00 |
| 45 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 8 | $2,500.00 | $3,700.00 | $3,900.00 | $3,500.00 |
| 46 | Office Technology and Supplies (637.34) | DOL | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 793 | $51.75 | $44.50 | $44.50 | $44.50 |
| 48 | Type A Sign Posts (645.81) | EACH | 49 | $290.00 | $250.00 | $250.00 | $250.00 |
| 49 | (645.81090003) | 18 | $79.50 | $68.50 | $68.50 | $68.50 | |
| 50 | Reference Marker Panel (646.21) | EACH | 36 | $52.25 | $45.00 | $45.00 | $45.00 |
| 51 | Steel Post, 1.1 lb/ft (646.31) | EACH | 36 | $93.00 | $80.00 | $80.00 | $80.00 |
| 52 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $238.00 | $205.00 | $205.00 | $205.00 |
| 53 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 90 | $46.40 | $40.00 | $40.00 | $40.00 |
| 54 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 12 | $58.00 | $50.00 | $50.00 | $50.00 |
| 55 | (647.83001002) | 36 | $7.75 | $6.50 | $6.50 | $6.50 | |
| 56 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 1 | $2,036.00 | $1,500.00 | $1,400.00 | $2,500.00 |
| 57 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 7 | $2,479.00 | $1,875.00 | $2,500.00 | $3,500.00 |
| 58 | Telescoping Manhole Frame & Cover (655.1302) | EACH | 27 | $3,035.00 | $1,970.00 | $2,800.00 | $2,000.00 |
| 59 | (655.16000011) | 7 | $1,133.00 | $345.00 | $528.00 | $85.00 | |
| 60 | Adjust Existing Valve Box Elevation (663.33) | EACH | 18 | $500.00 | $410.00 | $450.00 | $360.00 |
| 61 | Remove and Store Lamppost Assembly (670.80) | EACH | 2 | $2,018.00 | $597.00 | $597.00 | $597.00 |
| 62 | Relocate Lamppost Assembly (670.90) | EACH | 2 | $2,018.00 | $1,270.00 | $1,270.00 | $1,270.00 |
| 63 | (680.50000205) | 2 | $1,073.00 | $3,115.00 | $3,115.00 | $3,115.00 | |
| 64 | (680.51000205) | 1 | $818.00 | $740.00 | $740.00 | $740.00 | |
| 65 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 35,500 | $2.10 | $1.79 | $1.79 | $1.79 |
| 66 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 33,000 | $1.05 | $0.89 | $0.89 | $0.89 |
| 67 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 16 | $87.00 | $75.00 | $75.00 | $75.00 |
| 68 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 48 | $260.00 | $225.00 | $225.00 | $225.00 |
| 69 | Field Change Payment (FCP) (697.03) | DOL | 102,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 70 | Asphalt Price Adjustment (698.04) | DOL | 1,316 | $1.00 | $1.00 | $1.00 | $1.00 |
| 71 | Fuel Price Adjustment (698.05) | DOL | 870 | $1.00 | $1.00 | $1.00 | $1.00 |
| 72 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 73 | Mobilization (699.040001) | LS | 1 | $89,318 | $103,000 | $110,000 | $115,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 30, 2026. Compiled by Mirage Metrics.