NYSDOT contract D265469 bid tabulation
MULTI-SITE PAVEMENT PROJECT 24 - Various Locations. Let by New York State DOT on March 27, 2025, Madison, Oneida, Region 02. 3 bids received; low bid $5,584,339 by Dolomite Products Co Inc.
- Owner
- New York State DOT
- Letting
- 27 MAR 2025
- Pay items
- 102
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dolomite Products Co Inc | $5,584,339 | Low |
| 2 | Heidelberg Materials Northeast-Ny LLC | $5,709,987 | +2.0% |
| 3 | Barrett Paving Materials Inc | $6,896,117 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dolomite Products Co Inc | 2. Heidelberg Materials Northeast-Ny LLC | 3. Barrett Paving Materials Inc |
|---|---|---|---|---|---|---|
| 1 | (201.07010004) | 4 | $300.00 | $475.00 | $750.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 3,281 | $33.00 | $23.50 | $35.00 |
| 3 | (203.24010017) | 140 | $150.00 | $68.00 | $85.00 | |
| 4 | Subbase Course, Type 2 (304.12) | CY | 2,651 | $80.00 | $64.25 | $85.00 |
| 5 | (404.0001) | TON | 1,073 | $90.00 | $90.00 | $90.00 |
| 6 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 2 | $90.00 | $90.00 | $90.00 |
| 7 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 1,118 | $90.00 | $90.00 | $90.00 |
| 8 | (404.0189) | TON | 170 | $230.00 | $115.00 | $135.00 |
| 9 | (404.0589) | TON | 4,660 | $90.00 | $101.00 | $120.00 |
| 10 | (404.1989) | TON | 550 | $100.00 | $104.00 | $135.00 |
| 11 | (404.3789) | TON | 990 | $85.00 | $87.00 | $105.00 |
| 12 | (406.0683) | TON | 6,190 | $91.00 | $102.00 | $115.00 |
| 13 | (406.0963) | TON | 7,570 | $83.00 | $104.00 | $115.00 |
| 14 | (406.1269) | TON | 1,150 | $83.00 | $99.25 | $108.00 |
| 15 | (406.1273) | TON | 1,070 | $85.00 | $100.00 | $108.00 |
| 16 | (407.01040009) | 14,710 | $6.00 | $2.95 | $3.41 | |
| 17 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 66,580 | $0.70 | $0.50 | $0.55 |
| 18 | (490.17011018) | 114,880 | $2.00 | $1.60 | $3.00 | |
| 19 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 8,330 | $10.00 | $3.00 | $7.50 |
| 20 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 31 | $605.00 | $530.00 | $700.00 |
| 21 | Transition Bridge Railing (568.70) | LF | 210 | $300.00 | $300.00 | $300.00 |
| 22 | (604.070201) | EACH | 43 | $2,000.00 | $1,200.00 | $2,500.00 |
| 23 | (604.070202) | EACH | 9 | $3,000.00 | $2,700.00 | $6,000.00 |
| 24 | Box Beam Guide Railing (606.10) | LF | 3,868 | $47.00 | $46.75 | $46.75 |
| 25 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 136 | $56.00 | $55.75 | $55.75 |
| 26 | Box Beam End Piece (606.120101) | EACH | 4 | $700.00 | $700.00 | $700.00 |
| 27 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 3 | $4,500.00 | $4,444.00 | $4,444.00 |
| 28 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 16 | $2,200.00 | $2,125.00 | $2,125.00 |
| 29 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $7,650.00 | $7,650.00 | $7,650.00 |
| 30 | Resetting Box Beam Guide Railing (606.53) | LF | 810 | $30.00 | $30.00 | $30.00 |
| 31 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 18 | $45.00 | $42.00 | $42.00 |
| 32 | Removing and Disposing Cable Guide Railing (606.70) | LF | 3,824 | $2.50 | $2.50 | $2.50 |
| 33 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 669 | $5.00 | $5.00 | $5.00 |
| 34 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 14 | $650.00 | $650.00 | $650.00 |
| 35 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 8 | $150.00 | $150.00 | $150.00 |
| 36 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 2 | $90.00 | $90.00 | $90.00 |
| 37 | Concrete Sidewalks and Driveways (608.0101) | CY | 3 | $1,750.00 | $1,500.00 | $1,800.00 |
| 38 | (608.01050405) | 5,120 | $25.00 | $41.00 | $45.00 | |
| 39 | (608.02010015) | 170 | $120.00 | $70.00 | $140.00 | |
| 40 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 167 | $275.00 | $254.00 | $210.00 |
| 41 | (608.02020015) | 80 | $135.00 | $193.00 | $275.00 | |
| 42 | Surface-Applied Detectable Warning Units (608.20) | SY | 20 | $660.00 | $279.00 | $400.00 |
| 43 | (608.21000003) | 4 | $300.00 | $474.75 | $450.00 | |
| 44 | (609.0401) | LF | 850 | $82.00 | $88.00 | $90.00 |
| 45 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 1,110 | $45.00 | $18.50 | $100.00 |
| 46 | Topsoil - Lawns (610.1403) | CY | 104 | $150.00 | $130.00 | $125.00 |
| 47 | Turf Establishment – Performance (610.1605) | SY | 13,181 | $1.30 | $5.50 | $13.00 |
| 48 | (617.11000024) | LS | 1 | $1,500.00 | $1,200.00 | $1,150.00 |
| 49 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $359,961 | $405,000 | $501,760 |
| 50 | Type III Construction Barricades (619.04) | EACH | 105 | $80.00 | $84.00 | $40.00 |
| 51 | (619.0901) | LF | 201,380 | $0.25 | $0.27 | $0.27 |
| 52 | (619.110513) | EACH | 8 | $6,000.00 | $4,800.00 | $4,600.00 |
| 53 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 4 | $150.00 | $150.00 | $150.00 |
| 54 | Interim Tubular Markers (619.20) | EACH | 421 | $20.00 | $23.00 | $1.00 |
| 55 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 928 | $15.75 | $25.70 | $19.00 |
| 56 | (621.51000015) | 2,910 | $6.50 | $10.00 | $14.00 | |
| 57 | (621.51950006) | 3,460 | $4.50 | $4.75 | $0.35 | |
| 58 | (624.01) | 124 | $75.00 | $132.00 | $100.00 | |
| 59 | Survey Operations (625.01) | LS | 1 | $30,000 | $8,400.00 | $18,000 |
| 60 | (625.09010015) | LS | 1 | $7,500.00 | $6,200.00 | $5,000.00 |
| 61 | (627.50140008) | 12,512 | $3.00 | $3.00 | $4.75 | |
| 62 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 103,410 | $0.15 | $0.05 | $0.05 |
| 63 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 170 | $125.00 | $87.00 | $140.00 |
| 64 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 550 | $90.00 | $64.00 | $130.00 |
| 65 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 3,620 | $60.00 | $60.00 | $75.00 |
| 66 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 10 | $2,750.00 | $3,000.00 | $3,000.00 |
| 67 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 68 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 69 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 42 | $53.00 | $52.75 | $52.75 |
| 70 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 494 | $53.00 | $53.00 | $53.00 |
| 71 | Type A Sign Posts (645.81) | EACH | 111 | $225.00 | $225.00 | $225.00 |
| 72 | Reference Marker Panel (646.21) | EACH | 10 | $46.00 | $46.00 | $46.00 |
| 73 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 48 | $25.50 | $25.25 | $25.25 |
| 74 | Steel Post, 2.0 lb/ft (646.32) | EACH | 46 | $85.00 | $85.00 | $85.00 |
| 75 | Flexible Delineator, Single Unit, Back to Back (646.41) | EACH | 4 | $400.00 | $400.00 | $400.00 |
| 76 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 17 | $150.00 | $150.00 | $150.00 |
| 77 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $45.00 | $45.00 | $45.00 |
| 78 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 64 | $55.00 | $55.00 | $55.00 |
| 79 | (647.83001002) | 13 | $12.00 | $12.00 | $12.00 | |
| 80 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 22,170 | $0.30 | $0.23 | $0.33 |
| 81 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 18,400 | $0.30 | $0.23 | $0.33 |
| 82 | Telescoping Manhole Frame & Cover (655.1302) | EACH | 4 | $2,675.00 | $1,957.50 | $2,916.83 |
| 83 | (655.16000011) | 4 | $500.00 | $415.00 | $149.90 | |
| 84 | Adjust Existing Valve Box Elevation (663.33) | EACH | 11 | $150.00 | $405.00 | $850.00 |
| 85 | (680.05010007) | 1 | $24,000 | $23,750 | $23,750 | |
| 86 | (680.05020007) | 1 | $4,700.00 | $4,695.00 | $4,695.00 | |
| 87 | (680.05031002) | 4 | $10,000 | $9,995.00 | $9,995.00 | |
| 88 | (680.05033002) | 1 | $4,900.00 | $4,875.00 | $4,875.00 | |
| 89 | (680.78100108) | LS | 1 | $900.00 | $900.00 | $900.00 |
| 90 | (680.78100208) | LS | 1 | $900.00 | $900.00 | $900.00 |
| 91 | (680.80324515) | 2 | $2,800.00 | $2,725.00 | $2,725.00 | |
| 92 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 125,170 | $0.42 | $0.40 | $0.40 |
| 93 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 105,680 | $0.42 | $0.40 | $0.40 |
| 94 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 10,740 | $2.75 | $2.60 | $2.60 |
| 95 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 2,010 | $2.75 | $2.00 | $2.00 |
| 96 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 4 | $250.00 | $215.00 | $215.00 |
| 97 | (691.04000020) | 26,000 | $1.00 | $1.00 | $1.00 | |
| 98 | Field Change Payment (FCP) (697.03) | DOL | 247,000 | $1.00 | $1.00 | $1.00 |
| 99 | Asphalt Price Adjustment (698.04) | DOL | 21,322.17 | $1.00 | $1.00 | $1.00 |
| 100 | Fuel Price Adjustment (698.05) | DOL | 2,433 | $1.00 | $1.00 | $1.00 |
| 101 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 102 | Mobilization (699.040001) | LS | 1 | $200,000 | $215,000 | $262,046 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.