| 1 | Clearing and Grubbing (201.06) | LS | 1 | $100,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 5,841 | $80.00 |
| 3 | Embankment In Place (203.03) | CY | 729 | $16.00 |
| 4 | Select Granular Fill (203.07) | CY | 221 | $90.00 |
| 5 | Select Granular Subgrade (203.20) | CY | 249 | $90.00 |
| 6 | Trench and Culvert Excavation (206.0201) | CY | 636 | $80.00 |
| 7 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 458 | $42.00 |
| 8 | Test Pit Excavation (206.05) | EACH | 9 | $1,200.00 |
| 9 | Geotextile Separation (207.21) | SY | 12,111 | $1.50 |
| 10 | Geotextile Drainage (207.22) | SY | 3,850 | $1.20 |
| 11 | Geotextile Stabilization (207.24) | SY | 1,460 | $1.50 |
| 12 | Mulch – Temporary (209.100101) | SY | 10,013 | $1.00 |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 5,181 | $1.00 |
| 14 | Silt Fence - Temporary (209.13) | LF | 5,362 | $5.50 |
| 15 | Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703) | LF | 17 | $28.72 |
| 16 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 224 | $12.20 |
| 17 | Stabilized Construction Access (209.22) | SY | 420 | $38.00 |
| 18 | Subbase Course, Type 2 (304.12) | CY | 4,376 | $107.20 |
| 19 | (404.0001) | TON | 540 | $90.00 |
| 20 | (404.0982) | TON | 6,128 | $167.67 |
| 21 | (404.1989) | TON | 2,167 | $156.50 |
| 22 | (404.2589) | TON | 3,083 | $134.00 |
| 23 | Straight Tack Coat (407.0103) | GAL | 3,635 | $3.75 |
| 24 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 33,744 | $2.00 |
| 25 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 38,668 | $8.00 |
| 26 | Shields and Shoring (552.17) | SF | 397 | $3.28 |
| 27 | (601.01110001) | | 134 | $63.00 |
| 28 | (603.171216) | EACH | 3 | $200.00 |
| 29 | (603.171316) | EACH | 2 | $220.00 |
| 30 | (603.9815) | LF | 65 | $53.00 |
| 31 | (603.9818) | LF | 75 | $64.00 |
| 32 | (604.070301) | EACH | 8 | $5,000.00 |
| 33 | (604.302122) | LF | 12 | $1,000.00 |
| 34 | (604.4048) | LF | 6 | $1,350.00 |
| 35 | Underdrain Filter, Type II (605.1001) | CY | 380 | $295.00 |
| 36 | (605.1701) | LF | 4,966 | $12.00 |
| 37 | Box Beam Guide Railing (606.10) | LF | 512 | $48.75 |
| 38 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $4,185.00 |
| 39 | Single-Slope Concrete Half Section Barrier (Precast) (606.3062) | LF | 40 | $250.00 |
| 40 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 77 | $12.40 |
| 41 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 529 | $7.22 |
| 42 | Concrete Sidewalks and Driveways (608.0101) | CY | 19 | $3,000.00 |
| 43 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 22 | $350.00 |
| 44 | Brick Paved Sidewalks and Driveways (Mortar Setting Bed) (608.04) | SY | 56 | $350.00 |
| 45 | (608.21000003) | | 20 | $405.00 |
| 46 | (609.0401) | LF | 630 | $110.00 |
| 47 | (609.0403) | LF | 402 | $110.00 |
| 48 | Turf Establishment – Performance (610.1605) | SY | 4,963 | $18.00 |
| 49 | (614.060304) | EACH | 1 | $1,200.00 |
| 50 | (615.02060124) | | 1 | $2,005.56 |
| 51 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,483,000 |
| 52 | (619.100101) | LF | 10,848 | $0.70 |
| 53 | (619.110512) | EACH | 2 | $26,300 |
| 54 | (619.110612) | WEEK | 24 | $200.00 |
| 55 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 12 | $75.00 |
| 56 | Mailboxes (619.27) | EACH | 9 | $500.00 |
| 57 | Stone Filling (Light) (620.03) | CY | 23 | $226.00 |
| 58 | Bedding Material, Type 1 (620.0801) | CY | 1 | $340.00 |
| 59 | Crushed Stone (In-Place Measure) (623.12) | CY | 8 | $122.00 |
| 60 | Survey Operations (625.01) | LS | 1 | $100,000 |
| 61 | (625.09010015) | LS | 1 | $60,000 |
| 62 | (627.50140008) | | 12,387 | $5.20 |
| 63 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 245 | $3.10 |
| 64 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $6,200.00 |
| 65 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 15 | $4,600.00 |
| 66 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 |
| 67 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 |
| 68 | (645.34010104) | | 1 | $150,000 |
| 69 | (645.34010204) | | 1 | $150,000 |
| 70 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 195 | $53.00 |
| 71 | Overhead Sign Panels (645.61) | SF | 113 | $90.00 |
| 72 | Type A Sign Posts (645.81) | EACH | 65 | $293.00 |
| 73 | (645.81090003) | | 7 | $110.00 |
| 74 | (645.830302) | EACH | 2 | $5,500.00 |
| 75 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 3 | $28.00 |
| 76 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 23 | $24.00 |
| 77 | Steel Post, 2.0 lb/ft (646.32) | EACH | 25 | $115.00 |
| 78 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 20 | $370.00 |
| 79 | Remove and Store Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.42) | EACH | 1 | $2,900.00 |
| 80 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 11 | $6.50 |
| 81 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 71 | $6.50 |
| 82 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 2 | $1,420.00 |
| 83 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 2 | $2,600.00 |
| 84 | Manhole Frame & Cover (655.1202) | EACH | 1 | $1,900.00 |
| 85 | (662.60000108) | | 2,000 | $1.00 |
| 86 | (662.60020008) | | 1 | $900.00 |
| 87 | Relocate Existing Hydrant (663.31) | EACH | 1 | $10,000 |
| 88 | Adjust Existing Valve Box Elevation (663.33) | EACH | 3 | $350.00 |
| 89 | (680.05010007) | | 2 | $24,395 |
| 90 | (680.05040004) | | 9 | $4,620.00 |
| 91 | Pole Excavation and Concrete Foundation (680.5001) | CY | 3 | $3,510.00 |
| 92 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 2 | $3,150.00 |
| 93 | (680.51000010) | | 2 | $225.00 |
| 94 | (680.510501) | EACH | 5 | $1,825.00 |
| 95 | (680.520106) | LF | 37 | $30.75 |
| 96 | (680.520108) | LF | 176 | $37.25 |
| 97 | (680.520110) | LF | 243 | $50.25 |
| 98 | (680.670802) | EACH | 2 | $1,330.00 |
| 99 | (680.671202) | EACH | 1 | $1,465.00 |
| 100 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 5 | $3,950.00 |
| 101 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 7 | $595.00 |
| 102 | (680.730714) | LF | 3,759 | $3.05 |
| 103 | (680.731914) | LF | 384 | $7.25 |
| 104 | (680.77000305) | | 1 | $950.00 |
| 105 | (680.77000405) | | 1 | $850.00 |
| 106 | (680.79000105) | | 1 | $6,750.00 |
| 107 | (680.79000305) | | 1 | $925.00 |
| 108 | (680.79000405) | | 1 | $450.00 |
| 109 | (680.80324515) | | 2 | $2,575.00 |
| 110 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 18 | $85.00 |
| 111 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 8 | $94.00 |
| 112 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 16 | $91.00 |
| 113 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 15 | $103.00 |
| 114 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 16 | $98.00 |
| 115 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 8 | $105.00 |
| 116 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 81 | $225.00 |
| 117 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 21 | $385.00 |
| 118 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 2 | $815.00 |
| 119 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 2 | $176.00 |
| 120 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 4 | $255.00 |
| 121 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 3 | $395.00 |
| 122 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 3 | $295.00 |
| 123 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 2 | $217.00 |
| 124 | (680.8151) | EACH | 2 | $1,145.00 |
| 125 | (680.81990003) | | 26 | $220.00 |
| 126 | (680.8210) | EACH | 8 | $835.00 |
| 127 | (680.82252310) | | 2 | $12,240 |
| 128 | (680.90920103) | | 2 | $1,100.00 |
| 129 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 2 | $225.00 |
| 130 | (680.95010105) | | 6 | $4,995.00 |
| 131 | (680.950106) | LF | 441 | $2.95 |
| 132 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $25.00 |
| 133 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,492 | $0.85 |
| 134 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 23,287 | $0.85 |
| 135 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 3,877 | $2.65 |
| 136 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 12,268 | $2.65 |
| 137 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 64 | $115.00 |
| 138 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 58 | $225.00 |
| 139 | Field Change Payment (FCP) (697.03) | DOL | 540,000 | $1.00 |
| 140 | Asphalt Price Adjustment (698.04) | DOL | 48,100 | $1.00 |
| 141 | Fuel Price Adjustment (698.05) | DOL | 19,900 | $1.00 |
| 142 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 |
| 143 | Mobilization (699.040001) | LS | 1 | $292,000 |