| 1 | Unclassified Excavation and Disposal (203.02) | CY | 2,165 | $55.00 | $48.00 |
| 2 | Select Granular Fill (203.07) | CY | 3 | $200.00 | $150.00 |
| 3 | (203.24010017) | | 1,377 | $50.00 | $57.00 |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 66 | $120.00 | $200.00 |
| 5 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 1,155 | $4.00 | $7.00 |
| 6 | (209.23010009) | | 466 | $9.32 | $6.00 |
| 7 | Subbase Course, Type 2 (304.12) | CY | 1,850 | $75.00 | $114.00 |
| 8 | (404.0589) | TON | 5,063 | $110.00 | $118.00 |
| 9 | (404.0683) | TON | 12,172 | $90.00 | $106.00 |
| 10 | (404.1289) | TON | 420 | $115.00 | $138.00 |
| 11 | (404.2589) | TON | 389 | $125.00 | $102.00 |
| 12 | (407.01040009) | | 17,168 | $3.83 | $7.00 |
| 13 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 39,762 | $0.75 | $1.50 |
| 14 | (490.17011018) | | 1,547 | $7.80 | $8.50 |
| 15 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,648 | $9.00 | $8.50 |
| 16 | (520.50000004) | | 42 | $200.00 | $20.00 |
| 17 | Concrete for Structures, Performance (555.0021) | CY | 9 | $5,300.00 | $4,200.00 |
| 18 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $25.00 | $25.00 |
| 19 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 1,678 | $5.30 | $5.00 |
| 20 | Protective Sealing of New Structural Concrete (559.02) | SF | 484 | $6.25 | $1.90 |
| 21 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 38 | $325.00 | $325.00 |
| 22 | Transition Bridge Railing (568.70) | LF | 128 | $205.00 | $205.00 |
| 23 | Removal of Structural Concrete (580.01) | CY | 11 | $1,250.00 | $3,500.00 |
| 24 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 195 | $55.00 | $50.00 |
| 25 | Bridge Railing Removal and Disposal (587.01) | LF | 34 | $50.00 | $45.00 |
| 26 | (603.87020015) | | 22 | $180.00 | $367.00 |
| 27 | (603.88020015) | | 2 | $100.00 | $100.00 |
| 28 | (604.070201) | EACH | 1 | $2,500.00 | $2,249.00 |
| 29 | Underdrain Filter, Type I (605.0901) | CY | 73 | $150.00 | $300.00 |
| 30 | (605.1701) | LF | 968 | $11.00 | $5.00 |
| 31 | (605.21010018) | | 4 | $210.00 | $250.00 |
| 32 | Box Beam Guide Railing (606.10) | LF | 14,318 | $45.00 | $45.00 |
| 33 | Box Beam End Piece (606.120101) | EACH | 2 | $850.00 | $850.00 |
| 34 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 13 | $4,200.00 | $4,200.00 |
| 35 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 33 | $2,200.00 | $2,200.00 |
| 36 | Resetting Box Beam Guide Railing (606.53) | LF | 6,064 | $18.00 | $22.00 |
| 37 | Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920) | EACH | 18 | $400.00 | $730.00 |
| 38 | Removing and Disposing Cable Guide Railing (606.70) | LF | 16,527 | $2.00 | $3.00 |
| 39 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 158 | $5.00 | $20.00 |
| 40 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 42 | $600.00 | $570.00 |
| 41 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 5 | $225.00 | $525.00 |
| 42 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 200 | $300.00 | $310.00 |
| 43 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 182 | $125.00 | $165.00 |
| 44 | Topsoil - Roadside (610.1402) | CY | 96 | $125.00 | $165.00 |
| 45 | Turf Establishment - Roadside (610.1601) | SY | 26 | $14.00 | $14.00 |
| 46 | Turf Establishment – Performance (610.1605) | SY | 5,171 | $8.00 | $1.30 |
| 47 | (617.11000024) | LS | 1 | $500.00 | $2,453.00 |
| 48 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $713,309 | $606,894 |
| 49 | (619.0901) | LF | 581,076 | $0.20 | $0.20 |
| 50 | (619.110513) | EACH | 2 | $2,300.00 | $10,200 |
| 51 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 322 | $53.00 | $43.00 |
| 52 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 17 | $120.00 | $45.00 |
| 53 | (619.60750011) | | 322 | $23.00 | $23.00 |
| 54 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 226 | $17.00 | $11.50 |
| 55 | Cleaning Culverts with Span of More Than 50 in. (621.02) | LF | 33 | $400.00 | $385.00 |
| 56 | Cleaning Drainage Structures (621.04) | EACH | 4 | $450.00 | $350.00 |
| 57 | (621.51000015) | | 5,816 | $15.00 | $11.00 |
| 58 | (621.51950006) | | 2,271 | $8.65 | $5.00 |
| 59 | Asphalt Gutter (624.020101) | TON | 18 | $350.00 | $1,000.00 |
| 60 | Plant Production Quality Adjustment to 624.020101 (624.020110) | QUALITY UNIT | 1 | $105.00 | $105.00 |
| 61 | Survey Operations (625.01) | LS | 1 | $30,000 | $50,000 |
| 62 | (627.50140008) | | 2,854 | $4.00 | $5.00 |
| 63 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 206,977 | $0.08 | $0.15 |
| 64 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 29 | $375.00 | $188.00 |
| 65 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 758 | $120.00 | $97.00 |
| 66 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 1,363 | $58.00 | $63.00 |
| 67 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1.00 | $5,000.00 |
| 68 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 8 | $2,500.00 | $4,000.00 |
| 69 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 70 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 3 | $85.00 | $85.00 |
| 71 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 348 | $44.00 | $44.00 |
| 72 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 40 | $34.00 | $34.00 |
| 73 | Type A Sign Posts (645.81) | EACH | 72 | $220.00 | $220.00 |
| 74 | Reference Marker Panel (646.21) | EACH | 123 | $31.00 | $31.00 |
| 75 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 83 | $12.00 | $12.00 |
| 76 | Steel Post, 1.1 lb/ft (646.31) | EACH | 104 | $55.00 | $55.00 |
| 77 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $240.00 | $240.00 |
| 78 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $65.00 | $65.00 |
| 79 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 40 | $70.00 | $70.00 |
| 80 | (647.83001002) | | 98 | $10.00 | $11.00 |
| 81 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 34,098 | $0.41 | $0.67 |
| 82 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 121,911 | $0.43 | $0.43 |
| 83 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 70,825 | $0.43 | $0.43 |
| 84 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 995 | $2.25 | $2.25 |
| 85 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 2,927 | $2.25 | $2.25 |
| 86 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 8 | $115.00 | $115.00 |
| 87 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 9 | $215.00 | $215.00 |
| 88 | (691.04000020) | | 28,000 | $1.00 | $1.00 |
| 89 | Field Change Payment (FCP) (697.03) | DOL | 229,000 | $1.00 | $1.00 |
| 90 | Asphalt Price Adjustment (698.04) | DOL | 4,145 | $1.00 | $1.00 |
| 91 | Fuel Price Adjustment (698.05) | DOL | 143 | $1.00 | $1.00 |
| 92 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 93 | Mobilization (699.040001) | LS | 1 | $201,299 | $200,969 |