| 1 | (201.07010004) | | 14 | $1,800.00 | $1,422.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 406 | $40.00 | $72.00 |
| 3 | (203.24010017) | | 50 | $145.00 | $102.00 |
| 4 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 545 | $4.75 | $6.86 |
| 5 | (209.23010009) | | 694 | $9.75 | $10.72 |
| 6 | Subbase Course, Type 2 (304.12) | CY | 573 | $87.00 | $141.00 |
| 7 | (404.0682) | TON | 7,843 | $109.00 | $112.00 |
| 8 | (404.1289) | TON | 15,872 | $102.00 | $99.00 |
| 9 | (404.2589) | TON | 164 | $140.00 | $139.00 |
| 10 | (407.01040009) | | 15,753 | $3.00 | $3.83 |
| 11 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 33,227 | $0.57 | $0.45 |
| 12 | (490.17011018) | | 141,379 | $3.30 | $3.90 |
| 13 | Concrete for Structures, Performance (555.0021) | CY | 6.60 | $2,300.00 | $3,910.00 |
| 14 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $25.00 | $25.00 |
| 15 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 789 | $13.50 | $12.00 |
| 16 | Protective Sealing of New Structural Concrete (559.02) | SF | 123 | $6.50 | $2.05 |
| 17 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 48 | $225.37 | $225.37 |
| 18 | Transition Bridge Railing (568.70) | LF | 64 | $202.48 | $202.48 |
| 19 | Removal of Structural Concrete (580.01) | CY | 4 | $4,950.00 | $4,790.00 |
| 20 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 111 | $60.75 | $76.00 |
| 21 | Bridge Railing Removal and Disposal (587.01) | LF | 44 | $35.00 | $30.43 |
| 22 | (595.50000018) | | 138 | $16.25 | $12.00 |
| 23 | Culvert-End Safety Grate (603.0101) | SF | 54 | $28.50 | $46.69 |
| 24 | (603.171116) | EACH | 15 | $1,100.00 | $197.95 |
| 25 | (603.171216) | EACH | 4 | $1,060.00 | $227.89 |
| 26 | (603.171814) | EACH | 3 | $1,775.00 | $843.35 |
| 27 | (603.87020015) | | 219 | $132.00 | $115.00 |
| 28 | (603.87050015) | | 37 | $150.00 | $147.00 |
| 29 | (603.88020015) | | 12 | $210.00 | $98.69 |
| 30 | (603.88050015) | | 2 | $285.00 | $196.39 |
| 31 | Box Beam Guide Railing (606.10) | LF | 754 | $51.88 | $51.88 |
| 32 | Box Beam Median Barrier (606.11) | LF | 103 | $69.86 | $69.86 |
| 33 | Box Beam End Piece (606.120101) | EACH | 4 | $681.93 | $681.93 |
| 34 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 6 | $4,511.59 | $4,511.59 |
| 35 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,292.73 | $2,292.73 |
| 36 | Box Beam End Assembly Type III (606.1203) | EACH | 2 | $6,563.98 | $6,563.98 |
| 37 | Box Beam Median Barrier End Assembly, Type C (606.1403) | EACH | 2 | $7,483.98 | $7,483.98 |
| 38 | Resetting Box Beam Guide Railing (606.53) | LF | 1,183 | $16.54 | $16.54 |
| 39 | Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920) | EACH | 1 | $841.48 | $841.48 |
| 40 | Removing and Disposing Cable Guide Railing (606.70) | LF | 132 | $2.50 | $2.50 |
| 41 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,066 | $5.00 | $5.00 |
| 42 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 2 | $675.00 | $675.00 |
| 43 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 12 | $160.00 | $160.00 |
| 44 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $105.00 | $105.00 |
| 45 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 28 | $490.00 | $275.00 |
| 46 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 50 | $75.00 | $43.00 |
| 47 | Topsoil - Roadside (610.1402) | CY | 27 | $123.00 | $139.00 |
| 48 | Turf Establishment – Performance (610.1605) | SY | 3,709 | $11.20 | $12.80 |
| 49 | (617.11000024) | LS | 1 | $1,000.00 | $1,840.00 |
| 50 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $432,400 | $428,627 |
| 51 | (619.0901) | LF | 155,342 | $0.23 | $0.19 |
| 52 | (619.110613) | WEEK | 8 | $2,600.00 | $530.00 |
| 53 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 340 | $36.00 | $30.00 |
| 54 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 9 | $85.00 | $48.00 |
| 55 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 1,608 | $15.35 | $9.50 |
| 56 | (621.51000015) | | 7,153 | $10.65 | $11.50 |
| 57 | (621.51950006) | | 4,650 | $4.40 | $16.00 |
| 58 | (624.01) | | 601 | $50.00 | $36.00 |
| 59 | Asphalt Gutter (624.020101) | TON | 4 | $490.00 | $590.00 |
| 60 | Plant Production Quality Adjustment to 624.020101 (624.020110) | QUALITY UNIT | 1 | $105.00 | $105.00 |
| 61 | Survey Operations (625.01) | LS | 1 | $13,000 | $45,000 |
| 62 | (627.50140008) | | 981 | $3.65 | $3.25 |
| 63 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 20 | $204.00 | $244.00 |
| 64 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 344 | $137.00 | $169.00 |
| 65 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 1,054 | $64.55 | $82.00 |
| 66 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 20 | $204.00 | $180.00 |
| 67 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,100.00 | $500.00 |
| 68 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 8 | $3,300.00 | $2,450.00 |
| 69 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 70 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 6 | $39.00 | $39.00 |
| 71 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 379 | $38.75 | $38.75 |
| 72 | Type A Sign Posts (645.81) | EACH | 75 | $200.00 | $200.00 |
| 73 | (645.81090003) | | 8 | $65.00 | $65.00 |
| 74 | (645.830301) | EACH | 2 | $3,200.00 | $3,200.00 |
| 75 | Reference Marker Panel (646.21) | EACH | 29 | $28.00 | $28.00 |
| 76 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 30 | $14.00 | $14.00 |
| 77 | Steel Post, 2.0 lb/ft (646.32) | EACH | 41 | $65.00 | $65.00 |
| 78 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 19 | $175.00 | $175.00 |
| 79 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 35 | $20.00 | $20.00 |
| 80 | (647.83001002) | | 20 | $15.00 | $15.00 |
| 81 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 30,484 | $0.28 | $0.62 |
| 82 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 95,315 | $0.37 | $0.42 |
| 83 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 56,647 | $0.37 | $0.42 |
| 84 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 3,582 | $2.50 | $2.25 |
| 85 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 3 | $225.00 | $225.00 |
| 86 | Field Change Payment (FCP) (697.03) | DOL | 180,000 | $1.00 | $1.00 |
| 87 | Asphalt Price Adjustment (698.04) | DOL | 14,405.40 | $1.00 | $1.00 |
| 88 | Fuel Price Adjustment (698.05) | DOL | 1,584 | $1.00 | $1.00 |
| 89 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 90 | Mobilization (699.040001) | LS | 1 | $180,000 | $191,000 |