NYSDOT contract D265636 bid tabulation

RESURFACING - I-390, Towns of Brighton. Let by New York State DOT on January 8, 2026, Monroe, Region 04. 2 bids received; low bid $22,189,673 by Cold Spring Construction Company.

Owner
New York State DOT
Letting
08 JAN 2026
Pay items
197
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cold Spring Construction Company$22,189,673Low
2Sealand Contractors Corp.$22,528,000+2.0%
NYSDOT contract D265636: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cold Spring Construction Company2. Sealand Contractors Corp.
1 (201.07000004)11,790$7.75$8.00
2Unclassified Excavation and Disposal (203.02)CY260$62.00$250.00
3Embankment In Place (203.03)CY105$52.00$150.00
4Select Granular Fill (203.07)CY350$60.00$105.00
5 (203.24010017)710$60.00$160.00
6Trench and Culvert Excavation (206.0201)CY445$125.00$100.00
7Conduit Excavation and Backfill including Surface Restoration (206.03)LF260$30.00$71.00
8Test Pit Excavation (206.05)EACH15$3,000.00$2,400.00
9Seed and Mulch – Temporary (209.1003)SY10,250$2.50$1.45
10Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602)EACH6$1,150.00$2,000.00
11Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY90$15.00$17.00
12Sediment Filter Log, 12″ (209.2301)LF409$17.00$15.00
13Subbase Course, Optional Type (304.15)CY190$210.00$300.00
14Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT750$105.00$105.00
15Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT630$105.00$105.00
16 (404.0189)TON100$250.00$275.00
17 (404.0682)TON9,160$145.00$145.00
18 (404.1959)TON14,990$100.00$120.00
19 (404.1989)TON10$1,050.00$900.00
20 (404.3789)TON10$1,050.00$900.00
21 (406.1252)TON18,310$130.00$135.00
22Diluted Tack Coat (407.0102)GAL19,300$9.00$7.90
23Straight Tack Coat (407.0103)GAL8,100$12.00$10.20
24Asphalt Pavement Joint Adhesive (418.7603)LF217,140$0.01$0.95
25Production Cold-Mill Surface Planing of Bituminous Concrete (490.15)SY214,370$3.65$5.40
26 (490.17011018)75,890$4.75$4.10
27Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,280$24.00$25.00
28PCC Foundation for Pavement, PEM Concrete (503.1013)CY12$1,800.00$2,000.00
29Shields and Shoring (552.17)SF628$0.01$10.00
30 (557.26000016)3,320$18.00$34.00
31 (557.26000216)3,435$18.00$34.00
32 (557.26000316)13,026$17.00$34.00
33 (567.47000018)271$375.00$750.00
34Removal of Structural Concrete (580.01)CY11$3,500.00$14,000
35 (584.50010018)103,093$6.00$5.10
36 (602.2642)LF555$600.00$980.00
37 (602.3612)LF6,297$130.00$135.00
38 (602.3615)LF590$195.00$160.00
39 (602.3618)LF1,130$185.00$190.00
40 (602.3624)LF567$235.00$248.00
41 (602.3630)LF1,085$275.00$330.00
42 (602.3636)LF459$335.00$433.00
43 (602.3642)LF449$455.00$450.00
44 (602.3648)LF363$550.00$573.00
45Culvert-End Safety Grate (603.0101)SF310$32.00$60.00
46 (603.171016)EACH3$1,000.00$1,500.00
47 (603.171216)EACH11$1,100.00$1,600.00
48 (603.171416)EACH7$1,200.00$1,700.00
49 (603.171614)EACH2$1,475.00$2,200.00
50 (603.172112)EACH1$4,500.00$4,200.00
51 (603.541316)EACH2$2,750.00$3,200.00
52 (603.541514)EACH1$3,800.00$4,500.00
53 (603.6003)LF317$265.00$160.00
54 (603.6606)LF80$525.00$550.00
55 (603.67060008)2$4,000.00$11,000
56 (603.7301)EACH4$3,250.00$4,000.00
57 (603.7303)EACH6$7,000.00$4,500.00
58Concrete Collars (603.77)EACH7$6,000.00$5,000.00
59 (603.9812)LF12$220.00$1,000.00
60 (603.9818)LF92$200.00$200.00
61 (603.9824)LF4$550.00$1,200.00
62 (604.070401)EACH75$6,000.00$6,700.00
63 (604.070402)EACH18$7,000.00$5,800.00
64 (604.4048)LF12$800.00$2,000.00
65Box Beam Guide Railing (606.10)LF6,906$50.00$48.50
66Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF822$56.00$60.00
67Box Beam Median Barrier (606.11)LF98$57.00$66.00
68Box Beam Median Barrier (Shop Bent or Shop Mitered) (606.110002)LF322$59.00$87.00
69Box Beam End Piece (606.120101)EACH2$665.00$895.00
70Box Beam Guide Railing End Assembly Type I (606.120102)EACH4$4,500.00$4,600.00
71Box Beam End Assembly Type III (606.1203)EACH6$7,350.00$6,700.00
72Box Beam Median Barrier End Assembly, Type B (606.1402)EACH2$1,900.00$3,600.00
73HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF796$37.00$33.00
74HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy-Absorbing) (606.28)EACH1$13,250$11,600
75HPBO (Mod.) Corrugated Beam Median Barrier (606.2801)LF492$60.00$48.50
76Single-Slope Concrete Half Section Barrier (Precast) (606.3062)LF480$225.00$240.00
77Removing and Disposing Corrugated Beam Guide Railing (606.71)LF1,897$3.75$4.40
78Removing and Disposing Corrugated Beam Median Barrier (606.72)LF1,026$5.00$6.50
79Removing and Disposing Box Beam Guide Railing (606.73)LF1,142$4.50$5.50
80Removing and Disposing Box Beam Median Barrier (606.74)LF468$3.75$5.00
81Removing and Disposing Concrete Barrier-Half Section (606.7510)LF590$85.00$120.00
82Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH2$105.00$625.00
83Removing and Disposing Weak- and Heavy-Post Corrugated Beam Energy-Absorbing Terminals (606.7911)EACH2$75.00$800.00
84Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803)EACH5$17,000$16,200
85Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Single Slope Concrete Median Barrier (606.8906)EACH2$14,000$12,000
86 (607.0522)LF4,240$34.00$34.20
87 (607.41010010)100$7.00$20.00
88Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$105.00$105.00
89Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON450$500.00$325.00
90Turf Establishment – Performance (610.1605)SY10,620$24.00$19.00
91 (617.10000024)330$115.00$130.00
92 (617.11000024)LS1$1,000.00$4,000.00
93Basic Work Zone Traffic Control (619.01)LS1$4,125,000$2,668,818
94Type III Construction Barricades (619.04)EACH183$75.00$260.00
95 (619.0901)LF67,170$0.24$0.26
96 (619.100101)LF12,800$0.24$0.26
97 (619.110611)WEEK96$800.00$1,250.00
98Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH68$400.00$340.00
99Nighttime Operations (Entire Project) (619.24)LS1$200,000$300,000
100Pavement Patching (Force Acount) (619.2601)DOL50,000$1.00$1.00
101Pavement Patching (Tonnage) (619.2602)TON25$1,600.00$1,500.00
102Stone Filling (Light) (620.03)CY690$145.00$270.00
103Stone Filling (Medium) (620.04)CY150$190.00$280.00
104Bedding Material, Type 1 (620.0801)CY420$154.00$260.00
105Cleaning Culverts with Span of 50 in. or Less (621.01)LF5,350$4.75$5.00
106Cleaning Drainage Structures (621.04)EACH151$225.75$230.00
107 (621.05020004)9,060$5.75$9.00
108 (621.51000015)1,209$17.00$20.00
109Survey Operations (625.01)LS1$160,000$70,000
110Steel Pin and Cap Right of Way Markers (625.05)EACH14$300.00$530.00
111 (627.50140008)1,650$8.00$10.00
112Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403)SY360$275.00$210.00
113Stress Relieving Pavement Repairs (633.16)SY360$275.00$210.00
114Concrete Cylinder Curing Equipment (637.04)EACH1$425.00$10,000
115Engineer’s Field Office – Type 2 (637.12)MONTH17$2,700.00$2,400.00
116Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00
117 (637.41000115)17$200.00$80.00
118 (637.41000215)17$200.00$80.00
119 (637.41000315)17$200.00$80.00
120 (637.41000415)17$200.00$80.00
121 (637.41000515)17$200.00$80.00
122 (637.41000615)17$200.00$80.00
123White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF167,480$0.24$0.20
124Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF85,670$0.24$0.20
125White Paint Reflectorized Pavement Letters - 20 mils (640.22)EACH44$31.00$33.00
126White Paint Reflectorized Pavement Symbols - 20 mils (640.23)EACH49$90.00$100.00
127 (642.31610008)9,050$1.80$1.90
128 (644.03120103)1$2,000.00$4,000.00
129 (644.03120203)1$2,000.00$4,000.00
130 (644.03120303)1$2,000.00$4,500.00
131 (644.03120403)1$6,000.00$8,000.00
132 (644.03120503)1$6,000.00$5,000.00
133 (644.03120603)1$5,000.00$5,000.00
134 (644.03120703)1$5,000.00$5,000.00
135 (644.03120803)1$5,000.00$5,000.00
136 (644.03120903)1$5,000.00$5,000.00
137 (644.11010003)9$800.00$570.00
138 (644.11030003)4$500.00$450.00
139 (644.11050003)2$1,500.00$1,100.00
140 (645.03040015)2$4,000.00$8,000.00
141Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF2,560$35.00$37.00
142Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF1,575$35.00$37.00
143Overhead Sign Panels (645.61)SF5,053$43.00$37.00
144Type A Sign Posts (645.81)EACH282$195.00$245.00
145High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH27$900.00$1,260.00
146 (645.81090003)74$37.00$53.00
147 (645.830502)EACH4$6,500.00$4,200.00
148Reference Marker Panel (646.21)EACH80$37.00$35.00
149Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH1,882$37.00$23.20
150Steel Post, 2.0 lb/ft (646.32)EACH1,941$84.00$74.00
151Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25)EACH11$1,650.00$580.00
152 (647.25000004)5$2,200.00$1,160.00
153Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53)EACH6$42.00$340.00
154Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH132$47.00$42.00
155Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH15$210.00$90.00
156Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65)EACH6$365.00$242.00
157 (647.83001002)51$26.00$20.00
158Milled-In Audible Roadway Delineators (MIARDs) (649.01)LF65,580$0.43$0.52
159Pavement Ride Quality Adjustment to Asphalt Level 1 (653.1010)QUALITY UNIT1,477$105.00$105.00
160Manhole Frame & Cover (655.1202)EACH1$1,400.00$5,000.00
161 (655.17000011)1$900.00$5,000.00
162 (670.0108)EACH2$8,500.00$8,200.00
163 (670.03070008)1$900.00$1,150.00
164 (670.2603)LF260$14.50$8.00
165Pullboxes 5 to 7 1/2 cubic feet, inside volume (Lighting) (670.3006)EACH3$2,750.00$2,750.00
166 (670.7004)LF850$3.25$14.25
167 (670.7006)LF200$4.75$22.60
168Ground Wire No. 6 AWG. (670.7501)LF290$4.75$14.25
169 (670.75070011)100$6.25$9.25
170 (670.77000105)3$7,500.00$1,500.00
171Remove Lamppost Foundation (670.82)EACH2$2,000.00$1,925.00
172Relocate Lamppost Assembly (670.90)EACH2$3,000.00$1,290.00
173Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$36.25$36.25
174 (680.05010007)3$32,000$23,400
175 (680.05020007)3$9,000.00$3,600.00
176 (680.05040004)11$6,000.00$3,000.00
177 (680.51100010)18$600.00$285.00
178 (680.78100108)LS1$4,000.00$1,630.00
179 (680.78100208)LS1$4,000.00$1,450.00
180 (680.78100308)LS1$4,000.00$1,450.00
181 (680.78100408)LS1$4,000.00$4,250.00
182 (680.79010008)LS1$8,000.00$5,750.00
183 (680.80324515)1$5,000.00$6,200.00
184 (680.97105011)10$12,000$6,550.00
185 (683.58030204)10$12,000$9,550.00
186 (685.16010014)167,480$0.64$0.68
187 (685.17010014)85,670$0.64$0.68
188White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF23,040$2.25$2.30
189Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204)LF230$2.25$2.30
190White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH44$38.00$40.00
191White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH49$190.00$195.00
192 (691.04000020)39,900$1.00$1.00
193Field Change Payment (FCP) (697.03)DOL880,000$1.00$1.00
194Asphalt Price Adjustment (698.04)DOL48,483$1.00$1.00
195Fuel Price Adjustment (698.05)DOL12,783$1.00$1.00
196Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00
197Mobilization (699.040001)LS1$853,000$866,000
NYSDOT contract D265636: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy