NYSDOT contract D265489 bid tabulation
MBC Rt 13/34/96, Rt 79, Rt 89, and Safety Improvements. Let by New York State DOT on June 5, 2025, Tompkins, Region 03. 2 bids received; low bid $27,407,477 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 05 JUN 2025
- Pay items
- 269
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $27,407,477 | Low |
| 2 | Sealand Contractors Corp. | $32,447,001 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. Sealand Contractors Corp. |
|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 4,374 | $99.00 | $130.00 |
| 2 | Embankment In Place (203.03) | CY | 250 | $61.60 | $125.00 |
| 3 | Select Granular Fill (203.07) | CY | 187 | $120.80 | $150.00 |
| 4 | (203.24010017) | 226 | $42.70 | $200.00 | |
| 5 | (205.0201) | LS | 1 | $2,670.00 | $3,000.00 |
| 6 | (205.0202) | LS | 1 | $4,945.00 | $5,000.00 |
| 7 | (205.0203) | LS | 1 | $17,812 | $10,500 |
| 8 | (205.0204) | LS | 1 | $8,240.00 | $6,000.00 |
| 9 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 299 | $189.75 | $160.00 |
| 10 | (205.050201) | TON | 33 | $128.00 | $130.00 |
| 11 | (205.050202) | TON | 62 | $128.00 | $130.00 |
| 12 | (205.050203) | TON | 226 | $128.00 | $130.00 |
| 13 | (205.050204) | TON | 104 | $128.00 | $130.00 |
| 14 | Trench and Culvert Excavation (206.0201) | CY | 353 | $94.70 | $130.00 |
| 15 | (206.03180010) | 1,549 | $71.30 | $56.00 | |
| 16 | (206.03200010) | 118 | $52.90 | $38.00 | |
| 17 | Test Pit Excavation (206.05) | EACH | 26 | $2,116.00 | $2,200.00 |
| 18 | Mulch – Temporary (209.100101) | SY | 1,163 | $6.65 | $2.70 |
| 19 | Seed – Temporary (209.100102) | SY | 86 | $17.90 | $14.70 |
| 20 | (209.11010024) | 114 | $570.20 | $400.00 | |
| 21 | Check Dam, Prefabricated – Temporary (209.1105) | LF | 50 | $204.40 | $80.00 |
| 22 | Stabilized Construction Access (209.22) | SY | 100 | $24.85 | $125.00 |
| 23 | Sediment Filter Log, 12″ (209.2301) | LF | 262 | $9.00 | $20.00 |
| 24 | Subbase Course, Optional Type (304.15) | CY | 2,683 | $143.60 | $300.00 |
| 25 | (404.2569) | TON | 97 | $331.30 | $400.00 |
| 26 | (406.0962) | TON | 10,690 | $169.00 | $188.00 |
| 27 | (406.0989) | TON | 1,014 | $190.00 | $203.00 |
| 28 | (406.1969) | TON | 17,811 | $160.00 | $180.00 |
| 29 | Diluted Tack Coat (407.0102) | GAL | 21,568 | $3.50 | $11.00 |
| 30 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 99,604 | $0.75 | $1.05 |
| 31 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 118,385 | $7.60 | $6.90 |
| 32 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 11,587 | $13.00 | $15.00 |
| 33 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 48 | $1,275.00 | $1,700.00 |
| 34 | (520.55000015) | 170 | $15.00 | $25.00 | |
| 35 | Shields and Shoring (552.17) | SF | 545 | $21.65 | $15.00 |
| 36 | (603.6003) | LF | 372 | $135.60 | $180.00 |
| 37 | Concrete Collars (603.77) | EACH | 1 | $3,476.00 | $5,000.00 |
| 38 | (604.070301) | EACH | 257 | $1,400.00 | $8,000.00 |
| 39 | (604.070302) | EACH | 61 | $3,061.00 | $3,200.00 |
| 40 | (604.070303) | EACH | 1 | $3,061.00 | $5,000.00 |
| 41 | (604.070304) | EACH | 1 | $2,588.00 | $5,000.00 |
| 42 | (604.300190) | LF | 16 | $0.01 | $1,600.00 |
| 43 | (604.300673) | LF | 30 | $1,207.00 | $1,800.00 |
| 44 | Underdrain Filter, Type II (605.1001) | CY | 32 | $138.20 | $200.00 |
| 45 | (605.1601) | LF | 481 | $3.00 | $35.00 |
| 46 | Box Beam Guide Railing (606.10) | LF | 4,900 | $55.20 | $45.00 |
| 47 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 43 | $65.85 | $61.00 |
| 48 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 20 | $66.15 | $53.00 |
| 49 | Box Beam Guide Railing with Extra Long Posts (Shop Mitered) (606.100103) | LF | 28 | $170.00 | $165.00 |
| 50 | Box Beam End Piece (606.120101) | EACH | 1 | $885.50 | $850.00 |
| 51 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 1 | $2,443.75 | $2,250.00 |
| 52 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 5,032 | $3.45 | $5.00 |
| 53 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 2 | $747.50 | $1,000.00 |
| 54 | Guide Rail Transition Box Beam to Weak-Post Corrugated Beam Guide Rail (One Way Only) (606.8201) | EACH | 2 | $9,660.00 | $6,200.00 |
| 55 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $90.00 | $90.00 |
| 56 | Concrete Sidewalks and Driveways (608.0101) | CY | 1,221 | $1,254.00 | $1,650.00 |
| 57 | (608.01050109) | 12 | $8,279.00 | $10,000 | |
| 58 | (608.01050209) | 4 | $8,383.00 | $10,200 | |
| 59 | (608.01050309) | 17 | $10,503 | $13,500 | |
| 60 | (608.01050409) | 7 | $11,066 | $14,800 | |
| 61 | (608.01050509) | 29 | $12,174 | $17,500 | |
| 62 | (608.01050609) | 7 | $14,545 | $19,000 | |
| 63 | (608.01050709) | 1 | $12,450 | $16,000 | |
| 64 | (608.01050909) | 7 | $10,700 | $13,400 | |
| 65 | (608.01051009) | 8 | $11,446 | $12,800 | |
| 66 | (608.01051109) | 6 | $8,362.00 | $9,500.00 | |
| 67 | (608.02010015) | 781 | $98.60 | $275.00 | |
| 68 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 515 | $243.80 | $470.00 |
| 69 | (608.02020015) | 469 | $130.20 | $355.00 | |
| 70 | (608.03040008) | 271 | $424.60 | $570.00 | |
| 71 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 2,518 | $158.40 | $100.00 |
| 72 | Resetting Existing Curb (609.15) | LF | 1,006 | $145.60 | $95.00 |
| 73 | Compost (610.10) | CY | 3 | $149.00 | $400.00 |
| 74 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 21 | $86.25 | $240.00 |
| 75 | Turf Establishment – Performance (610.1605) | SY | 1,275 | $21.75 | $27.00 |
| 76 | Watering Vegetation (610.19) | 1,000 GALLONS | 8 | $86.25 | $250.00 |
| 77 | (611.0122) | EACH | 17 | $575.00 | $705.00 |
| 78 | (611.0242) | EACH | 11 | $690.00 | $450.00 |
| 79 | (611.0452) | EACH | 5 | $138.00 | $160.00 |
| 80 | (611.0562) | EACH | 3 | $138.00 | $200.00 |
| 81 | Post-Planting Care (611.19) | EACH | 36 | $46.00 | $160.00 |
| 82 | Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411) | EACH | 10 | $947.60 | $600.00 |
| 83 | Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421) | EACH | 2 | $4,738.00 | $700.00 |
| 84 | (614.04710001) | 28 | $676.90 | $7.00 | |
| 85 | (614.060102) | EACH | 2 | $1,600.00 | $900.00 |
| 86 | (614.060104) | EACH | 9 | $1,600.00 | $1,100.00 |
| 87 | (614.060202) | EACH | 16 | $1,900.00 | $1,600.00 |
| 88 | (614.060204) | EACH | 15 | $1,900.00 | $1,700.00 |
| 89 | (614.060302) | EACH | 9 | $4,200.00 | $1,800.00 |
| 90 | (614.060304) | EACH | 15 | $6,300.00 | $2,000.00 |
| 91 | (614.060404) | EACH | 1 | $9,400.00 | $2,200.00 |
| 92 | (614.060504) | EACH | 1 | $9,400.00 | $3,100.00 |
| 93 | (618.78100115) | 2 | $1,755.00 | $4,000.00 | |
| 94 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $2,448,206 | $3,453,264 |
| 95 | Temporary Business Signs (619.0701) | SF | 330 | $34.65 | $80.00 |
| 96 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 20,846 | $11.45 | $11.85 |
| 97 | Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804) | EACH | 185 | $287.50 | $265.00 |
| 98 | (619.0901) | LF | 137,236 | $1.05 | $0.97 |
| 99 | (619.100101) | LF | 20,642 | $1.10 | $1.00 |
| 100 | (619.100201) | EACH | 231 | $138.00 | $125.00 |
| 101 | (619.100301) | EACH | 320 | $55.20 | $51.00 |
| 102 | (619.110533) | EACH | 6 | $15,917 | $42,000 |
| 103 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 22 | $563.50 | $185.00 |
| 104 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $822,910 | $250,000 |
| 105 | Traffic Control Supervisor (619.25) | MONTH | 18 | $29,929 | $29,000 |
| 106 | Bedding Material, Type 2 (620.0802) | CY | 33 | $101.00 | $300.00 |
| 107 | Cleaning Closed Drainage Systems (621.03) | LF | 17,261 | $2.50 | $2.30 |
| 108 | Cleaning Drainage Structures (621.04) | EACH | 245 | $247.25 | $230.00 |
| 109 | (621.05020004) | 4,900 | $6.90 | $11.00 | |
| 110 | (621.51050003) | 2,212 | $13.25 | $11.00 | |
| 111 | Survey Operations (625.01) | LS | 1 | $220,224 | $165,000 |
| 112 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 94 | $327.80 | $500.00 |
| 113 | (625.09010015) | LS | 1 | $1.00 | $20,000 |
| 114 | (627.50140008) | 8,907 | $6.25 | $10.00 | |
| 115 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $9,310.00 | $10,000 |
| 116 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 28 | $2,500.00 | $3,000.00 |
| 117 | Rain Gauge (637.26) | EACH | 1 | $250.00 | $300.00 |
| 118 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 119 | Anchor Bolts (644.11) | LB | 5,747 | $7.20 | $8.50 |
| 120 | Drilled Shaft for Overhead Sign Structures (644.20) | CY | 127 | $5,183.00 | $10,000 |
| 121 | Rectangular Footing for Overhead Sign Structures (644.30) | CY | 254 | $0.01 | $500.00 |
| 122 | (644.420810) | EACH | 2 | $63,250 | $30,500 |
| 123 | (644.420910) | EACH | 3 | $80,500 | $72,500 |
| 124 | (644.420915) | EACH | 1 | $0.01 | $70,000 |
| 125 | (644.421405) | EACH | 1 | $59,225 | $56,000 |
| 126 | (644.421415) | EACH | 1 | $115,000 | $105,500 |
| 127 | (644.421515) | EACH | 1 | $118,450 | $111,000 |
| 128 | (644.432030) | EACH | 1 | $143,750 | $141,500 |
| 129 | (644.434030) | EACH | 1 | $247,825 | $234,000 |
| 130 | Performance Concrete Quality Adjustment (644.99) | QUALITY UNIT | 1 | $17.50 | $17.50 |
| 131 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 262 | $52.35 | $74.00 |
| 132 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 3,714 | $46.00 | $36.00 |
| 133 | Overhead Sign Panels (645.61) | SF | 1,237 | $110.00 | $36.00 |
| 134 | Type A Sign Posts (645.81) | EACH | 640 | $264.50 | $200.00 |
| 135 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 20 | $1,983.75 | $1,050.00 |
| 136 | (645.81090003) | 52 | $97.20 | $48.00 | |
| 137 | (645.830203) | EACH | 4 | $4,617.25 | $3,400.00 |
| 138 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 165 | $166.75 | $380.00 |
| 139 | Reference Marker Panel (646.21) | EACH | 60 | $46.00 | $33.00 |
| 140 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 62 | $19.55 | $12.00 |
| 141 | Steel Post, 2.0 lb/ft (646.32) | EACH | 90 | $109.85 | $67.00 |
| 142 | Removal of Cantilever Overhead Sign Panel(s), Structure, and Foundations (647.20) | EACH | 8 | $10,439 | $20,500 |
| 143 | Removal of Multi-Span Overhead Sign Panel(s), Structure, and Foundations (647.22) | EACH | 1 | $31,204 | $45,000 |
| 144 | Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25) | EACH | 5 | $1,150.00 | $630.00 |
| 145 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 63 | $51.75 | $63.00 |
| 146 | Remove and Dispose Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.52) | EACH | 3 | $69.00 | $340.00 |
| 147 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 524 | $69.00 | $65.00 |
| 148 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 27 | $74.75 | $340.00 |
| 149 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 4 | $1,725.00 | $325.00 |
| 150 | (647.83001002) | 12 | $11.50 | $40.00 | |
| 151 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 7,370 | $1.50 | $1.62 |
| 152 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 2,765 | $1.50 | $1.62 |
| 153 | Pavement Ride Quality Adjustment to Asphalt Level 1 (653.1010) | QUALITY UNIT | 120 | $90.00 | $90.00 |
| 154 | Cast Frame F3, UnMountable Curb Box CU3 & Parallel Bar Grate 8 PCB (655.0806) | EACH | 5 | $3,869.00 | $3,500.00 |
| 155 | Parallel Bar Frame 10 PCB & Parallel Bar Grate 10 PCB (655.0901) | EACH | 4 | $1,871.00 | $1,000.00 |
| 156 | (655.13000015) | 134 | $2,899.00 | $5,000.00 | |
| 157 | (660.65000101) | 76 | $1,556.00 | $3,200.00 | |
| 158 | (662.60000115) | LS | 1 | $630.00 | $630.00 |
| 159 | (662.60000215) | LS | 1 | $630.00 | $630.00 |
| 160 | (662.60000315) | LS | 1 | $630.00 | $630.00 |
| 161 | (662.60000415) | LS | 1 | $630.00 | $630.00 |
| 162 | (662.60000515) | LS | 1 | $1,260.00 | $1,260.00 |
| 163 | (662.60000615) | LS | 1 | $630.00 | $630.00 |
| 164 | (662.60000715) | LS | 1 | $630.00 | $630.00 |
| 165 | (662.60000815) | LS | 1 | $630.00 | $630.00 |
| 166 | (662.60000915) | LS | 1 | $630.00 | $630.00 |
| 167 | Adjust Existing Valve Box Elevation (663.33) | EACH | 148 | $528.80 | $1,000.00 |
| 168 | (680.05010007) | 22 | $26,335 | $25,700 | |
| 169 | (680.11130814) | 18 | $7,118.50 | $7,700.00 | |
| 170 | (680.11231214) | 5 | $7,567.00 | $7,650.00 | |
| 171 | (680.11231314) | 7 | $7,601.50 | $7,800.00 | |
| 172 | (680.11231414) | 4 | $7,670.50 | $7,750.00 | |
| 173 | Pole Excavation and Concrete Foundation (680.5001) | CY | 100 | $3,162.50 | $1,950.00 |
| 174 | Concrete Base for Controller Cabinet (680.5002) | EACH | 5 | $3,565.00 | $4,500.00 |
| 175 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 9 | $839.50 | $870.00 |
| 176 | (680.510501) | EACH | 49 | $2,218.35 | $1,900.00 |
| 177 | (680.520106) | LF | 809 | $29.90 | $22.00 |
| 178 | (680.520108) | LF | 2,136 | $52.90 | $41.00 |
| 179 | (680.520110) | LF | 395 | $60.95 | $102.00 |
| 180 | Conduit Jacking or Boring (680.53) | LF | 1,604 | $216.20 | $94.00 |
| 181 | (680.621930) | EACH | 1 | $15,695 | $18,700 |
| 182 | (680.621936) | EACH | 1 | $16,368 | $17,500 |
| 183 | (680.621939) | EACH | 1 | $16,424 | $18,900 |
| 184 | (680.621940) | EACH | 1 | $18,207 | $20,500 |
| 185 | (680.621942) | EACH | 2 | $19,570 | $20,000 |
| 186 | (680.621948) | EACH | 1 | $20,602 | $25,300 |
| 187 | (680.621950) | EACH | 2 | $20,997 | $25,900 |
| 188 | (680.621952) | EACH | 1 | $22,572 | $28,800 |
| 189 | (680.621963) | EACH | 2 | $26,892 | $30,500 |
| 190 | (680.622053) | EACH | 1 | $23,250 | $29,000 |
| 191 | (680.622161) | EACH | 1 | $27,754 | $30,200 |
| 192 | (680.622164) | EACH | 1 | $27,925 | $37,500 |
| 193 | (680.631950) | EACH | 1 | $32,139 | $39,000 |
| 194 | (680.632054) | EACH | 2 | $36,806 | $46,000 |
| 195 | (680.632062) | EACH | 1 | $39,738 | $51,800 |
| 196 | (680.6807) | EACH | 1 | $2,379.35 | $1,100.00 |
| 197 | (680.681702) | EACH | 3 | $2,635.80 | $1,570.00 |
| 198 | (680.681802) | EACH | 1 | $2,708.25 | $1,620.00 |
| 199 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 8 | $815.35 | $655.00 |
| 200 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $977.50 | $625.00 |
| 201 | (680.730714) | LF | 21,519 | $4.60 | $4.50 |
| 202 | (680.77001105) | 1 | $1,265.00 | $950.00 | |
| 203 | (680.77001205) | 1 | $1,265.00 | $950.00 | |
| 204 | (680.77001505) | 1 | $5,405.00 | $4,500.00 | |
| 205 | (680.77001605) | 1 | $1,265.00 | $4,500.00 | |
| 206 | (680.77001705) | 1 | $5,405.00 | $4,500.00 | |
| 207 | (680.77002005) | 1 | $1,265.00 | $950.00 | |
| 208 | (680.79000105) | 1 | $5,175.00 | $1,950.00 | |
| 209 | (680.79000205) | 1 | $5,175.00 | $2,200.00 | |
| 210 | (680.79000305) | 1 | $5,175.00 | $2,200.00 | |
| 211 | (680.79000405) | 1 | $5,175.00 | $2,500.00 | |
| 212 | (680.79000505) | 1 | $5,175.00 | $2,500.00 | |
| 213 | (680.79000605) | 1 | $5,175.00 | $2,100.00 | |
| 214 | (680.79000705) | 1 | $5,175.00 | $2,450.00 | |
| 215 | (680.79000805) | 1 | $5,175.00 | $2,500.00 | |
| 216 | (680.79000905) | 1 | $5,175.00 | $2,700.00 | |
| 217 | (680.79001005) | 1 | $5,175.00 | $2,500.00 | |
| 218 | (680.79001105) | 12 | $10,465 | $1,450.00 | |
| 219 | (680.79001205) | 9 | $10,465 | $1,800.00 | |
| 220 | (680.79001305) | 1 | $5,175.00 | $2,500.00 | |
| 221 | (680.79001405) | 1 | $5,175.00 | $2,700.00 | |
| 222 | (680.79001505) | 9 | $10,465 | $1,850.00 | |
| 223 | (680.79001605) | 4 | $10,465 | $2,400.00 | |
| 224 | (680.79001705) | 1 | $10,465 | $12,900 | |
| 225 | (680.79001805) | 1 | $5,175.00 | $2,200.00 | |
| 226 | (680.79001905) | 1 | $5,175.00 | $2,700.00 | |
| 227 | (680.79002005) | 1 | $10,465 | $11,200 | |
| 228 | Battery Backup System (680.80) | EACH | 3 | $8,855.00 | $13,500 |
| 229 | (680.80320014) | 3 | $6,149.05 | $5,550.00 | |
| 230 | (680.80324515) | 22 | $4,174.50 | $2,000.00 | |
| 231 | (680.80324603) | 9 | $1,564.00 | $1,400.00 | |
| 232 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 64 | $118.45 | $110.00 |
| 233 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 4 | $129.95 | $120.00 |
| 234 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 62 | $125.35 | $110.00 |
| 235 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 11 | $138.00 | $120.00 |
| 236 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 62 | $117.30 | $110.00 |
| 237 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 5 | $123.05 | $120.00 |
| 238 | Traffic Signal Section - Optically Programmed - 12-inch (680.8102) | EACH | 10 | $4,352.75 | $2,400.00 |
| 239 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 208 | $228.85 | $205.00 |
| 240 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 73 | $759.00 | $565.00 |
| 241 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 132 | $251.85 | $225.00 |
| 242 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 266 | $311.65 | $345.00 |
| 243 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 97 | $669.30 | $410.00 |
| 244 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 21 | $371.45 | $570.00 |
| 245 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 132 | $255.30 | $230.00 |
| 246 | (680.8151) | EACH | 132 | $1,621.50 | $1,100.00 |
| 247 | (680.81990003) | 71 | $274.85 | $260.00 | |
| 248 | (680.8207) | EACH | 85 | $908.50 | $975.00 |
| 249 | Install Flashing Beacon Sign Assembly (680.8222) | EACH | 1 | $8,625.00 | $4,500.00 |
| 250 | (680.82220108) | 6 | $7,235.80 | $5,800.00 | |
| 251 | (680.82252210) | 2 | $11,720 | $15,500 | |
| 252 | Fire Pre-Emption Tell Tale Light (680.8230) | EACH | 6 | $736.00 | $655.00 |
| 253 | (680.90920103) | 8 | $2,133.25 | $1,180.00 | |
| 254 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 6 | $510.60 | $370.00 |
| 255 | (680.950104) | LF | 247 | $8.40 | $3.50 |
| 256 | (680.950106) | LF | 1,123 | $6.90 | $2.85 |
| 257 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $11.42 | $11.42 |
| 258 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 33,067 | $0.60 | $0.52 |
| 259 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 36,170 | $0.60 | $0.52 |
| 260 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 27,250 | $3.40 | $3.10 |
| 261 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 24,106 | $3.40 | $3.10 |
| 262 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 320 | $89.70 | $82.00 |
| 263 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 231 | $253.00 | $232.00 |
| 264 | (691.04000020) | 109,200 | $1.00 | $1.00 | |
| 265 | Field Change Payment (FCP) (697.03) | DOL | 1,617,000 | $1.00 | $1.00 |
| 266 | Asphalt Price Adjustment (698.04) | DOL | 76,625 | $1.00 | $1.00 |
| 267 | Fuel Price Adjustment (698.05) | DOL | 24,942 | $1.00 | $1.00 |
| 268 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 269 | Mobilization (699.040001) | LS | 1 | $1,036,000 | $1,247,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of June 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.