NYSDOT contract D265512 bid tabulation
Bridge Replacement Project NY-33A Over The Erie Canal. Let by New York State DOT on October 23, 2025, Monroe, Region 04. 2 bids received; low bid $21,360,497 by Cold Spring Construction Company.
- Owner
- New York State DOT
- Letting
- 23 OCT 2025
- Pay items
- 212
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cold Spring Construction Company | $21,360,497 | Low |
| 2 | Sealand Contractors Corp. | $22,130,000 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cold Spring Construction Company | 2. Sealand Contractors Corp. |
|---|---|---|---|---|---|
| 1 | (201.07000004) | 1,986 | $7.00 | $7.00 | |
| 2 | (202.120001) | LS | 1 | $2,750,000 | $1,200,000 |
| 3 | Removal of Substructures (202.19) | CY | 569 | $210.00 | $300.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 899 | $75.00 | $125.00 |
| 5 | Embankment In Place (203.03) | CY | 771 | $85.00 | $60.00 |
| 6 | Select Granular Fill (203.07) | CY | 205 | $55.00 | $120.00 |
| 7 | Select Granular Fill, Slope Protection - Type A (203.0801) | CY | 143 | $180.00 | $200.00 |
| 8 | Select Structural Fill (203.21) | CY | 431 | $110.00 | $130.00 |
| 9 | (205.0201) | LS | 1 | $2,000.00 | $4,000.00 |
| 10 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $75.00 | $170.00 |
| 11 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 1 | $125.00 | $240.00 |
| 12 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $125.00 | $1,100.00 |
| 13 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $125.00 | $40.00 |
| 14 | (205.050201) | TON | 12 | $150.00 | $150.00 |
| 15 | Structure Excavation (206.01) | CY | 2,269 | $60.00 | $60.00 |
| 16 | Trench and Culvert Excavation (206.0201) | CY | 397 | $62.00 | $125.00 |
| 17 | (206.03050005) | 133 | $185.00 | $36.00 | |
| 18 | (206.03060005) | 516 | $55.00 | $28.00 | |
| 19 | Test Pit Excavation (206.05) | EACH | 3 | $3,500.00 | $2,200.00 |
| 20 | Geotextile Bedding (207.20) | SY | 8 | $32.00 | $20.00 |
| 21 | Prefabricated Composite Structural Drain (207.26) | SY | 335 | $21.00 | $30.00 |
| 22 | Seed and Mulch – Temporary (209.1003) | SY | 9,280 | $1.10 | $1.17 |
| 23 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 4,640 | $1.00 | $1.04 |
| 24 | Sediment Filter Log, 12″ (209.2301) | LF | 367 | $11.00 | $20.00 |
| 25 | Removal and Disposal of Caulking ACM (BV14) (210.3411) | LF | 24 | $155.00 | $160.00 |
| 26 | Subbase Course, Type 2 (304.12) | CY | 445 | $170.00 | $200.00 |
| 27 | (404.0001) | TON | 77 | $95.00 | $95.00 |
| 28 | (404.0189) | TON | 112 | $245.00 | $180.00 |
| 29 | (404.0982) | TON | 924 | $165.00 | $155.00 |
| 30 | (404.1989) | TON | 192 | $230.00 | $195.00 |
| 31 | (404.3789) | TON | 292 | $265.00 | $160.00 |
| 32 | Diluted Tack Coat (407.0102) | GAL | 1,103 | $23.00 | $15.50 |
| 33 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,471 | $1.50 | $3.80 |
| 34 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 9,998 | $6.00 | $8.00 |
| 35 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 3 | $950.00 | $2,500.00 |
| 36 | (520.05000010) | 54 | $18.00 | $25.00 | |
| 37 | Shields and Shoring (552.17) | SF | 3,982 | $1.00 | $2.00 |
| 38 | (552.2001) | LF | 162 | $300.00 | $120.00 |
| 39 | (552.2101) | LF | 198 | $1,350.00 | $320.00 |
| 40 | (552.2201) | LF | 370 | $350.00 | $1,000.00 |
| 41 | (552.230201) | SF | 1,215 | $0.01 | $70.00 |
| 42 | (553.010001) | EACH | 2 | $0.01 | $1,000.00 |
| 43 | Footing Concrete, Performance (555.0011) | CY | 285 | $1,250.00 | $1,200.00 |
| 44 | Concrete for Structures, Performance (555.0021) | CY | 302 | $1,850.00 | $2,800.00 |
| 45 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $4.98 | $4.98 |
| 46 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $8.31 | $8.31 |
| 47 | Galvanized Bar Reinforcement for Structures (556.0203) | LB | 65,686 | $3.50 | $3.30 |
| 48 | Stud Shear Connectors for Bridges (556.03) | EACH | 9,155 | $7.50 | $5.00 |
| 49 | (557.1012) | SY | 438 | $550.00 | $540.00 |
| 50 | (557.1112) | SY | 1,095 | $650.00 | $675.00 |
| 51 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 1,717 | $0.01 | $1.00 |
| 52 | Sidewalks and Safety Walks (557.30) | SY | 334 | $1,050.00 | $1,250.00 |
| 53 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $15.68 | $15.68 |
| 54 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $8.13 | $8.13 |
| 55 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 1,327 | $7.75 | $6.50 |
| 56 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 15,820 | $0.75 | $1.20 |
| 57 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,788 | $2.00 | $4.50 |
| 58 | (564.0501) | LS | 1 | $8,000,000 | $8,300,000 |
| 59 | Type M.R. Expansion Bearing (Over 900 k) (565.1525) | EACH | 2 | $17,500 | $20,000 |
| 60 | Type M.R. Fixed Bearing (Over 900 k) (565.1725) | EACH | 2 | $14,500 | $17,000 |
| 61 | Modular Expansion Joint System - Two Cell (566.02) | LF | 81 | $2,500.00 | $2,600.00 |
| 62 | Armorless Bridge Joint (567.60) | LF | 27 | $375.00 | $1,200.00 |
| 63 | Transition Bridge Railing (568.70) | LF | 111 | $515.00 | $550.00 |
| 64 | (568.80306103) | 730 | $450.00 | $510.00 | |
| 65 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 323 | $400.00 | $550.00 |
| 66 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $13.44 | $13.44 |
| 67 | Lead-Exposure Control Plan (570.01) | LS | 1 | $2,000.00 | $2,000.00 |
| 68 | Medical Testing (570.02) | DOL | 5,000 | $1.00 | $1.00 |
| 69 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 2,500 | $1.00 | $1.00 |
| 70 | Decontamination Facilities (570.04) | CALENDAR WEEK | 26 | $500.00 | $40.00 |
| 71 | (570.100002) | LS | 1 | $0.01 | $1.00 |
| 72 | (572.00020101) | LS | 1 | $850,000 | $900,000 |
| 73 | (603.171614) | EACH | 1 | $1,200.00 | $1,400.00 |
| 74 | (603.6005) | LF | 16 | $350.00 | $350.00 |
| 75 | Concrete Collars (603.77) | EACH | 1 | $2,750.00 | $5,000.00 |
| 76 | (603.98101504) | 8 | $150.00 | $550.00 | |
| 77 | (603.98101804) | 15 | $110.00 | $560.00 | |
| 78 | (603.9818) | LF | 92 | $165.00 | $160.00 |
| 79 | (603.9824) | LF | 66 | $180.00 | $400.00 |
| 80 | (604.070401) | EACH | 3 | $5,250.00 | $6,000.00 |
| 81 | (604.070402) | EACH | 5 | $5,250.00 | $5,000.00 |
| 82 | (604.301911) | LF | 6 | $750.00 | $2,500.00 |
| 83 | (604.302122) | LF | 24 | $625.00 | $1,600.00 |
| 84 | (604.4060) | LF | 37 | $675.00 | $1,500.00 |
| 85 | Underdrain Filter, Type I (605.0901) | CY | 31 | $325.00 | $145.00 |
| 86 | (605.1701) | LF | 409 | $3.50 | $14.00 |
| 87 | (607.41010010) | 210 | $13.50 | $10.00 | |
| 88 | (607.81020004) | 1 | $35,000 | $29,000 | |
| 89 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $95.00 | $95.00 |
| 90 | Concrete Sidewalks and Driveways (608.0101) | CY | 48.10 | $3,300.00 | $1,800.00 |
| 91 | (608.01140002) | 56 | $75.00 | $450.00 | |
| 92 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 120 | $300.00 | $300.00 |
| 93 | (608.21000003) | 12 | $350.00 | $750.00 | |
| 94 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 525 | $93.00 | $95.00 |
| 95 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 83 | $71.00 | $120.00 |
| 96 | Turf Establishment – Performance (610.1605) | SY | 4,861 | $17.00 | $18.00 |
| 97 | Watering Vegetation (610.19) | 1,000 GALLONS | 14 | $50.00 | $210.00 |
| 98 | (611.0201) | EACH | 12 | $1,200.00 | $1,150.00 |
| 99 | (611.19020024) | 12 | $350.00 | $340.00 | |
| 100 | (614.060202) | EACH | 9 | $850.00 | $1,250.00 |
| 101 | (614.060204) | EACH | 7 | $1,000.00 | $1,450.00 |
| 102 | (614.060302) | EACH | 6 | $1,275.00 | $1,800.00 |
| 103 | (614.060402) | EACH | 1 | $1,450.00 | $2,100.00 |
| 104 | (614.060404) | EACH | 2 | $1,650.00 | $2,300.00 |
| 105 | (614.060502) | EACH | 2 | $2,000.00 | $2,800.00 |
| 106 | (615.08010005) | 1 | $5,500.00 | $3,500.00 | |
| 107 | (618.70000124) | 3 | $1,500.00 | $400.00 | |
| 108 | (618.71000024) | 26 | $75.00 | $80.00 | |
| 109 | (618.72136124) | 3 | $3,200.00 | $1,750.00 | |
| 110 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $325,000 | $1,344,896 |
| 111 | Type III Construction Barricades (619.04) | EACH | 88 | $75.00 | $320.00 |
| 112 | (619.06010009) | 1 | $750,000 | $1,000,000 | |
| 113 | (619.06020009) | 13 | $5,500.00 | $7,000.00 | |
| 114 | (619.100101) | LF | 3,899 | $0.50 | $0.60 |
| 115 | (619.111111) | EACH | 5 | $18,000 | $24,000 |
| 116 | (619.130101) | EACH | 1 | $40,000 | $27,300 |
| 117 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 111 | $400.00 | $265.00 |
| 118 | Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714) | LF | 700 | $27.00 | $60.00 |
| 119 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $40,000 | $35,000 |
| 120 | Stone Filling (Light) (620.03) | CY | 2 | $350.00 | $600.00 |
| 121 | (624.01) | 42 | $231.00 | $200.00 | |
| 122 | Survey Operations (625.01) | LS | 1 | $125,000 | $125,000 |
| 123 | (627.50140008) | 878 | $11.00 | $12.00 | |
| 124 | (634.99020017) | LS | 1 | $65,000 | $27,000 |
| 125 | Field Laboratory (637.01) | EACH | 1 | $12,000 | $2,500.00 |
| 126 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $500.00 | $11,000 |
| 127 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 37 | $2,750.00 | $2,000.00 |
| 128 | Rain Gauge (637.26) | EACH | 1 | $75.00 | $300.00 |
| 129 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 |
| 130 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 131 | Construction Testing supplies – Consumables (637.36) | DOL | 200 | $1.00 | $1.00 |
| 132 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 8,566 | $0.40 | $1.20 |
| 133 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 3,152 | $0.40 | $0.41 |
| 134 | White Paint Reflectorized Pavement Symbols - 20 mils (640.23) | EACH | 11 | $125.00 | $135.00 |
| 135 | (645.03030015) | 2 | $2,150.00 | $6,000.00 | |
| 136 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 182 | $42.00 | $42.00 |
| 137 | Type A Sign Posts (645.81) | EACH | 18 | $300.00 | $320.00 |
| 138 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 10 | $12.50 | $1,175.00 |
| 139 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $65.00 | $265.00 |
| 140 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 40 | $40.00 | $63.00 |
| 141 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 15 | $60.00 | $63.00 |
| 142 | Remove and Dispose High Capacity Type A Ground Mounted Sign Support and Foundation (647.64) | EACH | 8 | $100.00 | $315.00 |
| 143 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 1 | $2,750.00 | $1,200.00 |
| 144 | Welded Frame & Rectangular Grate 22 (655.1022) | EACH | 2 | $3,000.00 | $1,450.00 |
| 145 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 2 | $3,000.00 | $1,400.00 |
| 146 | Manhole Frame & Cover (655.1202) | EACH | 3 | $3,000.00 | $1,250.00 |
| 147 | Adjust Existing Valve Box Elevation (663.33) | EACH | 4 | $500.00 | $2,000.00 |
| 148 | Disconnect and Cap Existing Water Main (663.40) | EACH | 2 | $6,500.00 | $6,000.00 |
| 149 | (670.40010911) | 2 | $1,500.00 | $180.00 | |
| 150 | (670.7006) | LF | 1,008 | $4.00 | $1.53 |
| 151 | (680.05010007) | 3 | $21,000 | $21,900 | |
| 152 | (680.05020007) | 2 | $6,000.00 | $4,700.00 | |
| 153 | (680.05040004) | 9 | $4,500.00 | $4,200.00 | |
| 154 | (680.10010001) | 2 | $1,500.00 | $1,560.00 | |
| 155 | (680.10020001) | 3 | $500.00 | $520.00 | |
| 156 | (680.10030001) | 2 | $275.00 | $265.00 | |
| 157 | (680.10040001) | 4 | $150.00 | $153.00 | |
| 158 | Pole Excavation and Concrete Foundation (680.5001) | CY | 17 | $3,900.00 | $3,420.00 |
| 159 | (680.510301) | EACH | 7 | $2,700.00 | $2,100.00 |
| 160 | (680.51100010) | 9 | $500.00 | $510.00 | |
| 161 | (680.520106) | LF | 152 | $45.00 | $21.00 |
| 162 | (680.520107) | LF | 326 | $45.00 | $90.00 |
| 163 | (680.520706) | LF | 368 | $25.00 | $7.10 |
| 164 | (680.520708) | LF | 389 | $30.00 | $10.25 |
| 165 | Trenchless Installation Method for Conduit (680.5301) | LF | 75 | $110.00 | $100.00 |
| 166 | (680.621844) | EACH | 1 | $16,000 | $16,100 |
| 167 | (680.64183404) | 1 | $17,000 | $16,700 | |
| 168 | (680.65204004) | 1 | $27,000 | $28,200 | |
| 169 | (680.670802) | EACH | 4 | $1,400.00 | $1,470.00 |
| 170 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $1,500.00 | $1,100.00 |
| 171 | (680.730514) | LF | 1,270 | $9.00 | $4.45 |
| 172 | (680.730714) | LF | 1,560 | $10.00 | $5.25 |
| 173 | (680.731014) | LF | 504 | $13.00 | $5.40 |
| 174 | (680.78010005) | 5 | $500.00 | $515.00 | |
| 175 | (680.78100108) | LS | 1 | $5,250.00 | $14,600 |
| 176 | (680.78100208) | LS | 1 | $5,250.00 | $14,500 |
| 177 | (680.78100308) | LS | 1 | $5,250.00 | $10,900 |
| 178 | (680.80324515) | 1 | $4,000.00 | $2,850.00 | |
| 179 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 6 | $225.00 | $63.00 |
| 180 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 1 | $225.00 | $79.00 |
| 181 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 6 | $225.00 | $63.00 |
| 182 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 2 | $225.00 | $79.00 |
| 183 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 6 | $225.00 | $63.00 |
| 184 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 2 | $225.00 | $79.00 |
| 185 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 23 | $150.00 | $25.00 |
| 186 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 23 | $225.00 | $280.00 |
| 187 | (680.81210004) | 7 | $750.00 | $620.00 | |
| 188 | Install Pedestrian Signal Module (680.813104) | EACH | 4 | $150.00 | $25.00 |
| 189 | Pedestrian Signal Section - Polycarbonate, Type I, for 16-inch by 18-inch LED module (680.813109) | EACH | 4 | $225.00 | $148.00 |
| 190 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 4 | $375.00 | $465.00 |
| 191 | Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002) | EACH | 4 | $325.00 | $200.00 |
| 192 | (680.8151) | EACH | 4 | $1,700.00 | $1,300.00 |
| 193 | Backplates for Traffic Signal Heads (680.8199) | EACH | 7 | $500.00 | $325.00 |
| 194 | (680.8205) | EACH | 6 | $1,000.00 | $855.00 |
| 195 | (680.83010005) | 657 | $6.00 | $7.00 | |
| 196 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $650.00 | $370.00 |
| 197 | (680.950106) | LF | 630 | $12.50 | $3.45 |
| 198 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 |
| 199 | (683.10010001) | 296 | $32.00 | $4.50 | |
| 200 | (683.94000304) | 150 | $44.00 | $6.50 | |
| 201 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,811 | $1.25 | $1.32 |
| 202 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 3,152 | $1.25 | $1.32 |
| 203 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 4,459 | $3.85 | $3.95 |
| 204 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 11 | $250.00 | $265.00 |
| 205 | (686.01000011) | 296 | $10.00 | $10.25 | |
| 206 | (691.04000020) | 100,000 | $1.00 | $1.00 | |
| 207 | Field Change Payment (FCP) (697.03) | DOL | 350,000 | $1.00 | $1.00 |
| 208 | Asphalt Price Adjustment (698.04) | DOL | 3,315 | $1.00 | $1.00 |
| 209 | Fuel Price Adjustment (698.05) | DOL | 6,438 | $1.00 | $1.00 |
| 210 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 211 | (698.93940015) | LS | 1 | $721,500 | $721,500 |
| 212 | Mobilization (699.040001) | LS | 1 | $821,000 | $851,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.