NYSDOT contract D265801 bid tabulation

SMALL CULVERT MAINTENANCE; SFY 26/27. Let by New York State DOT on June 25, 2026, Niagara, Region 05. 3 bids received; low bid $1,344,953 by McLaughlin Construction Corp/DBA Edbauer Construction.

Owner
New York State DOT
Letting
25 JUN 2026
Pay items
84
Data through
15 OCT 2026

Bidders

NYSDOT contract D265801: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. McLaughlin Construction Corp/DBA Edbauer Construction2. Concrete Applied Technologies Corp/DBA:Catco3. Cold Spring Construction Company
1Clearing and Grubbing (201.06)LS1$55,000$14,000$40,000
2Unclassified Excavation and Disposal (203.02)CY181$94.00$43.00$175.00
3Embankment In Place (203.03)CY316$45.00$57.00$45.00
4Select Granular Fill (203.07)CY115$130.00$75.00$80.00
5 (203.24010017)145$25.00$130.00$110.00
6Controlled Low Strength Material (CLSM) (204.01)CY102$250.00$365.00$325.00
7Structure Excavation (206.01)CY769$40.00$48.00$85.00
8Trench and Culvert Excavation (206.0201)CY238$45.00$60.00$75.00
9Geotextile Bedding (207.20)SY139$7.00$10.00$10.00
10Prefabricated Composite Structural Drain (207.26)SY76$37.00$20.00$20.00
11Seed and Mulch – Temporary (209.1003)SY2,322$0.20$1.00$3.50
12 (209.23010009)1,540$1.00$7.00$6.00
13 (304.15010005)200$150.00$125.00$150.00
14Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT46$105.00$105.00$105.00
15 (404.0982)TON629$209.00$165.00$190.00
16 (404.1989)TON61$270.00$330.00$325.00
17 (404.3789)TON195$230.00$200.00$175.00
18Diluted Tack Coat (407.0102)GAL817$8.00$10.00$15.00
19Asphalt Pavement Joint Adhesive (418.7603)LF4,560$0.40$1.10$1.00
20Production Cold Milling of Bituminous Concrete (490.10)SY7,370$3.50$6.00$8.00
21 (553.030001)EACH1$1.00$1.00$2,500.00
22 (553.030002)EACH1$1.00$1.00$2,500.00
23 (553.030003)EACH1$1.00$1.00$2,500.00
24 (553.030004)EACH1$1.00$1.00$2,500.00
25 (553.030005)EACH1$1.00$1.00$2,500.00
26 (553.030006)EACH1$1.00$1.00$2,500.00
27 (595.50000018)1,520$8.00$7.00$12.00
28 (603.171216)EACH2$895.00$880.00$2,000.00
29 (603.171316)EACH4$907.00$890.00$2,000.00
30 (603.6102)LF70$250.00$112.00$175.00
31 (603.63050315)102$1,750.00$2,225.00$2,350.00
32 (603.7302)EACH4$3,200.00$1,380.00$3,500.00
33 (603.9815)LF147$220.00$99.00$250.00
34 (603.9818)LF118$273.00$127.00$250.00
35 (604.4048)LF4$1,850.00$1,820.00$1,750.00
36Box Beam Guide Railing (606.10)LF78$90.00$83.00$80.00
37Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103)EACH1$9,700.00$9,430.00$10,000
38Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH1$3,900.00$3,800.00$3,500.00
39HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27)EACH2$7,050.00$6,930.00$7,500.00
40HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF287$58.00$57.00$60.00
41HPBO (Mod.) Corrugated Beam Guide Railing (Shop Curved) (606.270101)LF53$70.00$59.00$60.00
42Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH4$3,350.00$3,260.00$3,500.00
43Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON43$325.00$222.00$500.00
44Topsoil - Roadside (610.1402)CY574$45.00$95.00$105.00
45Turf Establishment -Lawns (610.1602)SY5,205$0.25$3.00$3.00
46Watering Vegetation (610.19)1,000 GALLONS31$25.00$360.00$125.00
47 (613.04000001)10$50.00$198.00$50.00
48 (617.10000024)20$25.00$80.00$25.00
49 (617.11000024)LS1$100.00$4,500.00$500.00
50Basic Work Zone Traffic Control (619.01)LS1$201,845$188,700$225,000
51Type III Construction Barricades (619.04)EACH44$100.00$98.00$150.00
52 (619.0901)LF5,226$1.10$1.00$1.00
53 (619.111112)EACH15$2,000.00$6,500.00$3,500.00
54Stone Filling (Light) (620.03)CY189$112.00$125.00$200.00
55Bedding Material, Type 1 (620.0801)CY35$90.00$153.00$200.00
56Bedding Material, Type 2 (620.0802)CY35$90.00$153.00$200.00
57 (621.51970008)867$10.00$21.00$9.50
58Crushed Stone (In-Place Measure) (623.12)CY53$96.00$138.00$200.00
59Survey Operations (625.01)LS1$20,000$35,000$35,000
60 (627.50140008)523$6.00$10.00$15.00
61Engineer’s Field Office – Type 2 (637.12)MONTH13$1,100.00$2,870.00$3,000.00
62Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00
63Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00
64White Paint Reflectorized Pavement Stripes – 15 mils (640.10)LF2,976$1.10$1.00$1.00
65Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11)LF2,012$1.10$1.00$1.00
66White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF210$2.00$1.20$1.25
67Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF27$2.00$1.20$1.25
68Type A Sign Posts (645.81)EACH8$800.00$750.00$750.00
69Reference Marker Panel (646.21)EACH2$63.00$61.00$75.00
70Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH8$38.00$38.00$50.00
71Steel Post, 2.0 lb/ft (646.32)EACH10$155.00$150.00$150.00
72Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH5$25.00$22.00$50.00
73 (647.83001002)2$25.00$22.00$50.00
74Centerline Audible Roadway Delineators (CARDs) (649.11)LF264$22.00$20.00$20.00
75Manhole Frame & Grate (655.1201)EACH1$1,900.00$1,370.00$2,000.00
76White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF2,999$9.00$8.90$8.50
77Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF1,883$9.00$8.90$8.50
78White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH13$120.00$110.00$150.00
79White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH8$400.00$388.00$400.00
80Field Change Payment (FCP) (697.03)DOL51,000$1.00$1.00$1.00
81Asphalt Price Adjustment (698.04)DOL532$1.00$1.00$1.00
82Fuel Price Adjustment (698.05)DOL1,012$1.00$1.00$1.00
83Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
84Mobilization (699.040001)LS1$51,000$57,000$65,862
NYSDOT contract D265801: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of June 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy