NYSDOT contract D265801 bid tabulation
SMALL CULVERT MAINTENANCE; SFY 26/27. Let by New York State DOT on June 25, 2026, Niagara, Region 05. 3 bids received; low bid $1,344,953 by McLaughlin Construction Corp/DBA Edbauer Construction.
- Owner
- New York State DOT
- Letting
- 25 JUN 2026
- Pay items
- 84
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McLaughlin Construction Corp/DBA Edbauer Construction | $1,344,953 | Low |
| 2 | Concrete Applied Technologies Corp/DBA:Catco | $1,491,335 | +11% |
| 3 | Cold Spring Construction Company | $1,716,617 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McLaughlin Construction Corp/DBA Edbauer Construction | 2. Concrete Applied Technologies Corp/DBA:Catco | 3. Cold Spring Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $55,000 | $14,000 | $40,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 181 | $94.00 | $43.00 | $175.00 |
| 3 | Embankment In Place (203.03) | CY | 316 | $45.00 | $57.00 | $45.00 |
| 4 | Select Granular Fill (203.07) | CY | 115 | $130.00 | $75.00 | $80.00 |
| 5 | (203.24010017) | 145 | $25.00 | $130.00 | $110.00 | |
| 6 | Controlled Low Strength Material (CLSM) (204.01) | CY | 102 | $250.00 | $365.00 | $325.00 |
| 7 | Structure Excavation (206.01) | CY | 769 | $40.00 | $48.00 | $85.00 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 238 | $45.00 | $60.00 | $75.00 |
| 9 | Geotextile Bedding (207.20) | SY | 139 | $7.00 | $10.00 | $10.00 |
| 10 | Prefabricated Composite Structural Drain (207.26) | SY | 76 | $37.00 | $20.00 | $20.00 |
| 11 | Seed and Mulch – Temporary (209.1003) | SY | 2,322 | $0.20 | $1.00 | $3.50 |
| 12 | (209.23010009) | 1,540 | $1.00 | $7.00 | $6.00 | |
| 13 | (304.15010005) | 200 | $150.00 | $125.00 | $150.00 | |
| 14 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 46 | $105.00 | $105.00 | $105.00 |
| 15 | (404.0982) | TON | 629 | $209.00 | $165.00 | $190.00 |
| 16 | (404.1989) | TON | 61 | $270.00 | $330.00 | $325.00 |
| 17 | (404.3789) | TON | 195 | $230.00 | $200.00 | $175.00 |
| 18 | Diluted Tack Coat (407.0102) | GAL | 817 | $8.00 | $10.00 | $15.00 |
| 19 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 4,560 | $0.40 | $1.10 | $1.00 |
| 20 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 7,370 | $3.50 | $6.00 | $8.00 |
| 21 | (553.030001) | EACH | 1 | $1.00 | $1.00 | $2,500.00 |
| 22 | (553.030002) | EACH | 1 | $1.00 | $1.00 | $2,500.00 |
| 23 | (553.030003) | EACH | 1 | $1.00 | $1.00 | $2,500.00 |
| 24 | (553.030004) | EACH | 1 | $1.00 | $1.00 | $2,500.00 |
| 25 | (553.030005) | EACH | 1 | $1.00 | $1.00 | $2,500.00 |
| 26 | (553.030006) | EACH | 1 | $1.00 | $1.00 | $2,500.00 |
| 27 | (595.50000018) | 1,520 | $8.00 | $7.00 | $12.00 | |
| 28 | (603.171216) | EACH | 2 | $895.00 | $880.00 | $2,000.00 |
| 29 | (603.171316) | EACH | 4 | $907.00 | $890.00 | $2,000.00 |
| 30 | (603.6102) | LF | 70 | $250.00 | $112.00 | $175.00 |
| 31 | (603.63050315) | 102 | $1,750.00 | $2,225.00 | $2,350.00 | |
| 32 | (603.7302) | EACH | 4 | $3,200.00 | $1,380.00 | $3,500.00 |
| 33 | (603.9815) | LF | 147 | $220.00 | $99.00 | $250.00 |
| 34 | (603.9818) | LF | 118 | $273.00 | $127.00 | $250.00 |
| 35 | (604.4048) | LF | 4 | $1,850.00 | $1,820.00 | $1,750.00 |
| 36 | Box Beam Guide Railing (606.10) | LF | 78 | $90.00 | $83.00 | $80.00 |
| 37 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 1 | $9,700.00 | $9,430.00 | $10,000 |
| 38 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 1 | $3,900.00 | $3,800.00 | $3,500.00 |
| 39 | HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27) | EACH | 2 | $7,050.00 | $6,930.00 | $7,500.00 |
| 40 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 287 | $58.00 | $57.00 | $60.00 |
| 41 | HPBO (Mod.) Corrugated Beam Guide Railing (Shop Curved) (606.270101) | LF | 53 | $70.00 | $59.00 | $60.00 |
| 42 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 4 | $3,350.00 | $3,260.00 | $3,500.00 |
| 43 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 43 | $325.00 | $222.00 | $500.00 |
| 44 | Topsoil - Roadside (610.1402) | CY | 574 | $45.00 | $95.00 | $105.00 |
| 45 | Turf Establishment -Lawns (610.1602) | SY | 5,205 | $0.25 | $3.00 | $3.00 |
| 46 | Watering Vegetation (610.19) | 1,000 GALLONS | 31 | $25.00 | $360.00 | $125.00 |
| 47 | (613.04000001) | 10 | $50.00 | $198.00 | $50.00 | |
| 48 | (617.10000024) | 20 | $25.00 | $80.00 | $25.00 | |
| 49 | (617.11000024) | LS | 1 | $100.00 | $4,500.00 | $500.00 |
| 50 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $201,845 | $188,700 | $225,000 |
| 51 | Type III Construction Barricades (619.04) | EACH | 44 | $100.00 | $98.00 | $150.00 |
| 52 | (619.0901) | LF | 5,226 | $1.10 | $1.00 | $1.00 |
| 53 | (619.111112) | EACH | 15 | $2,000.00 | $6,500.00 | $3,500.00 |
| 54 | Stone Filling (Light) (620.03) | CY | 189 | $112.00 | $125.00 | $200.00 |
| 55 | Bedding Material, Type 1 (620.0801) | CY | 35 | $90.00 | $153.00 | $200.00 |
| 56 | Bedding Material, Type 2 (620.0802) | CY | 35 | $90.00 | $153.00 | $200.00 |
| 57 | (621.51970008) | 867 | $10.00 | $21.00 | $9.50 | |
| 58 | Crushed Stone (In-Place Measure) (623.12) | CY | 53 | $96.00 | $138.00 | $200.00 |
| 59 | Survey Operations (625.01) | LS | 1 | $20,000 | $35,000 | $35,000 |
| 60 | (627.50140008) | 523 | $6.00 | $10.00 | $15.00 | |
| 61 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 13 | $1,100.00 | $2,870.00 | $3,000.00 |
| 62 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 63 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 64 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 2,976 | $1.10 | $1.00 | $1.00 |
| 65 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 2,012 | $1.10 | $1.00 | $1.00 |
| 66 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 210 | $2.00 | $1.20 | $1.25 |
| 67 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 27 | $2.00 | $1.20 | $1.25 |
| 68 | Type A Sign Posts (645.81) | EACH | 8 | $800.00 | $750.00 | $750.00 |
| 69 | Reference Marker Panel (646.21) | EACH | 2 | $63.00 | $61.00 | $75.00 |
| 70 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 8 | $38.00 | $38.00 | $50.00 |
| 71 | Steel Post, 2.0 lb/ft (646.32) | EACH | 10 | $155.00 | $150.00 | $150.00 |
| 72 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 5 | $25.00 | $22.00 | $50.00 |
| 73 | (647.83001002) | 2 | $25.00 | $22.00 | $50.00 | |
| 74 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 264 | $22.00 | $20.00 | $20.00 |
| 75 | Manhole Frame & Grate (655.1201) | EACH | 1 | $1,900.00 | $1,370.00 | $2,000.00 |
| 76 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 2,999 | $9.00 | $8.90 | $8.50 |
| 77 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,883 | $9.00 | $8.90 | $8.50 |
| 78 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 13 | $120.00 | $110.00 | $150.00 |
| 79 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 8 | $400.00 | $388.00 | $400.00 |
| 80 | Field Change Payment (FCP) (697.03) | DOL | 51,000 | $1.00 | $1.00 | $1.00 |
| 81 | Asphalt Price Adjustment (698.04) | DOL | 532 | $1.00 | $1.00 | $1.00 |
| 82 | Fuel Price Adjustment (698.05) | DOL | 1,012 | $1.00 | $1.00 | $1.00 |
| 83 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 84 | Mobilization (699.040001) | LS | 1 | $51,000 | $57,000 | $65,862 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of June 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.