NYSDOT contract D265830 bid tabulation

O'Rorke Lift Bridge Repair. Let by New York State DOT on September 17, 2026, Monroe, Region 04. 1 bid received; low bid $9,972,715 by Cold Spring Construction Company.

Owner
New York State DOT
Letting
17 SEP 2026
Pay items
65
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cold Spring Construction Company$9,972,715Low
NYSDOT contract D265830: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cold Spring Construction Company
1Clearing and Grubbing (201.06)LS1$4,000.00
2Concrete for Structures, Performance (555.0021)CY30$7,600.00
3Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$9.88
4Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB1,055$10.00
5 (557.26000016)9,150$20.00
6 (564.20010008)18,300$0.90
7 (564.510001)LB8,600$35.00
8 (564.510002)LB300$150.00
9 (564.510003)LB16,300$25.00
10 (564.510004)LB1,700$60.00
11 (570.090001)LS1$500.00
12 (570.100001)LS1$500.00
13 (570.160001)LS1$250,000
14Disposal of Non-Hazardous Industrial Solid Paint Removal Waste (571.04)LB5,000$1.00
15 (573.010001)LS1$1,750,000
16Removal of Structural Concrete (580.01)CY42$4,500.00
17Removal and Replacement of Structural Concrete (582.0052)SF678$175.00
18Drilling and Grouting Bolts or Reinforcing Bars with Pullout Test (with Non- Destructive Investigation) (586.0302)EACH80$145.00
19 (589.010001)LB8,600$6.29
20 (599.06230104)LS1$1,500,000
21 (599.06250104)LS1$3,100,000
22 (608.21000003)6$275.00
23Stone Curb – Bridge (Type F1) (609.0302)LF1,579$47.00
24Basic Work Zone Traffic Control (619.01)LS1$700,000
25Type III Construction Barricades (619.04)EACH30$100.00
26 (619.110611)WEEK2$1,250.00
27Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF120$75.00
28 (619.99230101)LS1$2,500.00
29Survey Operations (625.01)LS1$30,000
30 (634.28010104)LS1$50,000
31Cleaning and Preparation of Pavement Surfaces-Lines (635.0103)LF4,556$2.00
32Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303)EACH6$150.00
33Concrete Cylinder Curing Equipment (637.04)EACH1$250.00
34Engineer’s Field Office – Type 1 (637.11)MONTH28$2,600.00
35Office Technology and Supplies (637.34)DOL2,000$1.00
36Partnering Workshop (637.35)DOL5,000$1.00
37Construction Testing supplies – Consumables (637.36)DOL100$1.00
38 (641.51022116)1$75,000
39Ground-Mounted Sign Panels without Z-bars (645.5101)SF6$45.00
40Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF38$44.00
41Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH8$185.00
42Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH9$65.00
43 (670.14480011)1$8,000.00
44 (670.94120004)2,100$1.75
45 (680.51100010)1$2,250.00
46 (680.730514)LF600$7.50
47 (680.730714)LF1,800$5.50
48 (680.78020008)4$450.00
49 (680.78030008)4$250.00
50Traffic Signal Module - 12-inch, Red Ball, LED (680.810101)EACH4$750.00
51Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103)EACH4$750.00
52Traffic Signal Module - 12-inch, Green Ball, LED (680.810105)EACH4$750.00
53Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH12$450.00
54 (680.81210004)4$1,200.00
55Backplates for Traffic Signal Heads (680.8199)EACH4$750.00
56 (680.83010005)1$1,750.00
57 (683.80328108)1$50,000
58White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF3,605$2.00
59Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF3,034$2.00
60White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF264$4.00
61White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH4$300.00
62Field Change Payment (FCP) (697.03)DOL150,000$1.00
63Fuel Price Adjustment (698.05)DOL100$1.00
64Steel/Iron Price Adjustment (698.06)DOL100$1.00
65Mobilization (699.040001)LS1$383,000
NYSDOT contract D265830: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 17, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy