NYSDOT contract D265766 bid tabulation

Pavement PM - Single Course Mill & Overlay- NY Rte 417. Let by New York State DOT on June 4, 2026, Cattaraugus, Region 05. 3 bids received; low bid $4,689,455 by Union Concrete & Construction Corp.

Owner
New York State DOT
Letting
04 JUN 2026
Pay items
94
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Union Concrete & Construction Corp$4,689,455Low
2Cold Spring Construction Company$5,332,764+14%
3Amherst Paving Inc$6,163,626+31%
NYSDOT contract D265766: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Union Concrete & Construction Corp2. Cold Spring Construction Company3. Amherst Paving Inc
1Clearing and Grubbing (201.06)LS1$35,000$55,000$50,000
2Unclassified Excavation and Disposal (203.02)CY60$160.00$53.00$108.00
3 (203.24010017)1,030$40.00$55.00$110.00
4 (205.0201)LS1$2,000.00$2,500.00$10,000
5Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR8$220.00$75.00$300.00
6Petroleum Contamination Parameter Analysis (205.0401)EACH2$450.00$75.00$1,000.00
7Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402)EACH1$2,000.00$75.00$1,000.00
8Laboratory Analysis for Ignitability (205.0403)EACH1$80.00$75.00$250.00
9Laboratory Analysis for ph (205.0404)EACH1$70.00$75.00$100.00
10Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405)EACH1$135.00$75.00$250.00
11Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406)EACH1$180.00$75.00$250.00
12Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407)EACH1$151.00$75.00$300.00
13 (205.050201)TON24$129.00$125.00$150.00
14Trench and Culvert Excavation (206.0201)CY1,740$30.00$92.00$189.00
15Stabilized Construction Access (209.22)SY200$1.00$33.00$25.00
16 (209.23010009)215$0.10$10.00$10.00
17 (304.15200005)1,000$130.00$120.00$330.00
18Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1$105.00$105.00$105.00
19Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT153$105.00$105.00$105.00
20 (404.0962)TON7,000$132.00$120.00$149.00
21 (404.0982)TON170$300.00$275.00$215.00
22Diluted Tack Coat (407.0102)GAL8,600$7.75$6.00$5.00
23Asphalt Pavement Joint Adhesive (418.7603)LF62,000$0.25$0.01$0.75
24Production Cold Milling of Bituminous Concrete (490.10)SY82,000$2.00$2.75$3.80
25Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,900$30.00$21.00$21.00
26 (553.030001)EACH1$100.00$0.01$20,000
27Box Beam Guide Railing (606.10)LF18,900$55.00$51.00$48.50
28Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF100$60.00$55.00$60.00
29Box Beam End Piece (606.120101)EACH1$690.00$625.00$900.00
30Box Beam Guide Railing End Assembly Type I (606.120102)EACH7$5,000.00$4,750.00$4,400.00
31Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH2$2,600.00$2,400.00$2,500.00
32Box Beam End Assembly Type III (606.1203)EACH5$7,650.00$7,250.00$6,000.00
33HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27)EACH2$4,350.00$4,100.00$6,600.00
34HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF4,800$37.00$33.50$36.00
35Resetting Box Beam Guide Railing (New Posts) (606.5348)LF100$56.00$40.00$36.00
36Removing and Storing Cable Guide Railing (606.60)LF18,000$3.50$4.00$2.20
37Removing and Storing Box Beam Guide Railing (606.63)LF1,950$6.00$6.50$6.60
38Removing and Storing HPBO (Mod.) Corrugated Beam Guide Railing (606.66)LF2,500$4.50$6.50$7.70
39Removing and Storing Weak- and Heavy-Post Corrugated Beam Terminals (606.6911)EACH1$375.00$185.00$500.00
40Removing and Storing Box Beam Guide Railing End Assembly (606.6920)EACH7$375.00$90.00$50.00
41Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH21$210.00$185.00$330.00
42Transition: HPBO (Mod.) Corrugated Guide Railing to Beam Box Beam Guide Railing (606.8901)EACH2$6,800.00$6,400.00$7,200.00
43 (607.0522)LF140$98.00$100.00$50.00
44Concrete Sidewalks and Driveways (608.0101)CY17$1,400.00$1,950.00$1,500.00
45 (608.01060415)190$95.00$75.00$50.00
46 (608.01070415)1,230$60.00$34.00$60.00
47Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON940$205.00$245.00$390.00
48 (608.21000003)0.30$750.00$5,450.00$1,600.00
49 (609.0401)LF150$150.00$172.00$125.00
50Topsoil - Roadside (610.1402)CY60$32.00$140.00$50.00
51Turf Establishment - Roadside (610.1601)SY400$8.00$3.00$6.00
52Basic Work Zone Traffic Control (619.01)LS1$150,800$650,000$558,000
53 (619.0901)LF82,000$0.22$0.25$0.50
54 (619.110513)EACH4$7,000.00$13,500$9,000.00
55Pavement Patching (Force Acount) (619.2601)DOL5,000$1.00$1.00$1.00
56Pavement Patching (Tonnage) (619.2602)TON60$500.00$600.00$300.00
57Stone Filling (Light) (620.03)CY40$106.00$200.00$350.00
58Stone Filling (Heavy) (620.05)CY95$178.00$150.00$333.00
59 (620.06010002)200$108.00$170.00$165.00
60Bedding Material, Type 1 (620.0801)CY25$150.00$225.00$795.00
61Survey Operations (625.01)LS1$65,000$75,000$100,000
62Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401)SY210$75.00$145.00$60.00
63Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402)SY210$68.00$115.00$55.00
64Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403)SY210$60.00$95.00$50.00
65 (636.01000005)18,000$1.00$1.00$1.00
66 (636.99990215)LS1$223,307$253,941$293,506
67Engineer’s Field Office – Type 2 (637.12)MONTH20$2,000.00$2,500.00$1,500.00
68Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00
69White Paint Reflectorized Pavement Stripes – 15 mils (640.10)LF61,000$0.20$0.20$0.25
70Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11)LF61,000$0.20$0.20$0.25
71White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF61,000$0.22$0.25$0.30
72Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF41,000$0.22$0.25$0.30
73Ground-Mounted Sign Panels without Z-bars (645.5101)SF42$34.00$34.50$78.00
74Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF1,816$37.00$36.00$43.00
75Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF184$40.00$39.00$33.00
76Type A Sign Posts (645.81)EACH368$185.00$175.00$180.00
77High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH8$1,070.00$1,025.00$1,200.00
78 (645.81090003)208$68.00$65.00$50.00
79 (645.830202)EACH8$4,000.00$4,600.00$2,700.00
80Reference Marker Panel (646.21)EACH86$33.00$32.00$33.00
81Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH80$22.00$21.00$17.00
82Steel Post, 2.0 lb/ft (646.32)EACH170$86.00$82.00$66.00
83Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH5$106.00$100.00$170.00
84Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH189$36.00$34.50$65.00
85Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH4$85.00$82.00$335.00
86 (647.83001002)86$12.50$7.25$28.00
87Centerline Audible Roadway Delineators (CARDs) (649.11)LF23,000$0.50$0.47$0.50
88Secondary Highway Audible Roadway Delineators (SHARDs) (649.21)LF30,000$0.50$0.47$0.50
89White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF1,800$5.45$5.00$5.45
90Field Change Payment (FCP) (697.03)DOL191,000$1.00$1.00$1.00
91Asphalt Price Adjustment (698.04)DOL2,918$1.00$1.00$1.00
92Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00
93Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
94Mobilization (699.040001)LS1$171,250$195,000$218,815
NYSDOT contract D265766: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of June 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy