| 1 | Clearing and Grubbing (201.06) | LS | 1 | $35,000 | $55,000 | $50,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 60 | $160.00 | $53.00 | $108.00 |
| 3 | (203.24010017) | | 1,030 | $40.00 | $55.00 | $110.00 |
| 4 | (205.0201) | LS | 1 | $2,000.00 | $2,500.00 | $10,000 |
| 5 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $220.00 | $75.00 | $300.00 |
| 6 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $450.00 | $75.00 | $1,000.00 |
| 7 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $2,000.00 | $75.00 | $1,000.00 |
| 8 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $80.00 | $75.00 | $250.00 |
| 9 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $70.00 | $75.00 | $100.00 |
| 10 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $135.00 | $75.00 | $250.00 |
| 11 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $180.00 | $75.00 | $250.00 |
| 12 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $151.00 | $75.00 | $300.00 |
| 13 | (205.050201) | TON | 24 | $129.00 | $125.00 | $150.00 |
| 14 | Trench and Culvert Excavation (206.0201) | CY | 1,740 | $30.00 | $92.00 | $189.00 |
| 15 | Stabilized Construction Access (209.22) | SY | 200 | $1.00 | $33.00 | $25.00 |
| 16 | (209.23010009) | | 215 | $0.10 | $10.00 | $10.00 |
| 17 | (304.15200005) | | 1,000 | $130.00 | $120.00 | $330.00 |
| 18 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 |
| 19 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 153 | $105.00 | $105.00 | $105.00 |
| 20 | (404.0962) | TON | 7,000 | $132.00 | $120.00 | $149.00 |
| 21 | (404.0982) | TON | 170 | $300.00 | $275.00 | $215.00 |
| 22 | Diluted Tack Coat (407.0102) | GAL | 8,600 | $7.75 | $6.00 | $5.00 |
| 23 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 62,000 | $0.25 | $0.01 | $0.75 |
| 24 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 82,000 | $2.00 | $2.75 | $3.80 |
| 25 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,900 | $30.00 | $21.00 | $21.00 |
| 26 | (553.030001) | EACH | 1 | $100.00 | $0.01 | $20,000 |
| 27 | Box Beam Guide Railing (606.10) | LF | 18,900 | $55.00 | $51.00 | $48.50 |
| 28 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 100 | $60.00 | $55.00 | $60.00 |
| 29 | Box Beam End Piece (606.120101) | EACH | 1 | $690.00 | $625.00 | $900.00 |
| 30 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 7 | $5,000.00 | $4,750.00 | $4,400.00 |
| 31 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,600.00 | $2,400.00 | $2,500.00 |
| 32 | Box Beam End Assembly Type III (606.1203) | EACH | 5 | $7,650.00 | $7,250.00 | $6,000.00 |
| 33 | HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27) | EACH | 2 | $4,350.00 | $4,100.00 | $6,600.00 |
| 34 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 4,800 | $37.00 | $33.50 | $36.00 |
| 35 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 100 | $56.00 | $40.00 | $36.00 |
| 36 | Removing and Storing Cable Guide Railing (606.60) | LF | 18,000 | $3.50 | $4.00 | $2.20 |
| 37 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 1,950 | $6.00 | $6.50 | $6.60 |
| 38 | Removing and Storing HPBO (Mod.) Corrugated Beam Guide Railing (606.66) | LF | 2,500 | $4.50 | $6.50 | $7.70 |
| 39 | Removing and Storing Weak- and Heavy-Post Corrugated Beam Terminals (606.6911) | EACH | 1 | $375.00 | $185.00 | $500.00 |
| 40 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 7 | $375.00 | $90.00 | $50.00 |
| 41 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 21 | $210.00 | $185.00 | $330.00 |
| 42 | Transition: HPBO (Mod.) Corrugated Guide Railing to Beam Box Beam Guide Railing (606.8901) | EACH | 2 | $6,800.00 | $6,400.00 | $7,200.00 |
| 43 | (607.0522) | LF | 140 | $98.00 | $100.00 | $50.00 |
| 44 | Concrete Sidewalks and Driveways (608.0101) | CY | 17 | $1,400.00 | $1,950.00 | $1,500.00 |
| 45 | (608.01060415) | | 190 | $95.00 | $75.00 | $50.00 |
| 46 | (608.01070415) | | 1,230 | $60.00 | $34.00 | $60.00 |
| 47 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 940 | $205.00 | $245.00 | $390.00 |
| 48 | (608.21000003) | | 0.30 | $750.00 | $5,450.00 | $1,600.00 |
| 49 | (609.0401) | LF | 150 | $150.00 | $172.00 | $125.00 |
| 50 | Topsoil - Roadside (610.1402) | CY | 60 | $32.00 | $140.00 | $50.00 |
| 51 | Turf Establishment - Roadside (610.1601) | SY | 400 | $8.00 | $3.00 | $6.00 |
| 52 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $150,800 | $650,000 | $558,000 |
| 53 | (619.0901) | LF | 82,000 | $0.22 | $0.25 | $0.50 |
| 54 | (619.110513) | EACH | 4 | $7,000.00 | $13,500 | $9,000.00 |
| 55 | Pavement Patching (Force Acount) (619.2601) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 56 | Pavement Patching (Tonnage) (619.2602) | TON | 60 | $500.00 | $600.00 | $300.00 |
| 57 | Stone Filling (Light) (620.03) | CY | 40 | $106.00 | $200.00 | $350.00 |
| 58 | Stone Filling (Heavy) (620.05) | CY | 95 | $178.00 | $150.00 | $333.00 |
| 59 | (620.06010002) | | 200 | $108.00 | $170.00 | $165.00 |
| 60 | Bedding Material, Type 1 (620.0801) | CY | 25 | $150.00 | $225.00 | $795.00 |
| 61 | Survey Operations (625.01) | LS | 1 | $65,000 | $75,000 | $100,000 |
| 62 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 210 | $75.00 | $145.00 | $60.00 |
| 63 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 210 | $68.00 | $115.00 | $55.00 |
| 64 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 210 | $60.00 | $95.00 | $50.00 |
| 65 | (636.01000005) | | 18,000 | $1.00 | $1.00 | $1.00 |
| 66 | (636.99990215) | LS | 1 | $223,307 | $253,941 | $293,506 |
| 67 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 20 | $2,000.00 | $2,500.00 | $1,500.00 |
| 68 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 69 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 61,000 | $0.20 | $0.20 | $0.25 |
| 70 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 61,000 | $0.20 | $0.20 | $0.25 |
| 71 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 61,000 | $0.22 | $0.25 | $0.30 |
| 72 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 41,000 | $0.22 | $0.25 | $0.30 |
| 73 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 42 | $34.00 | $34.50 | $78.00 |
| 74 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,816 | $37.00 | $36.00 | $43.00 |
| 75 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 184 | $40.00 | $39.00 | $33.00 |
| 76 | Type A Sign Posts (645.81) | EACH | 368 | $185.00 | $175.00 | $180.00 |
| 77 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 8 | $1,070.00 | $1,025.00 | $1,200.00 |
| 78 | (645.81090003) | | 208 | $68.00 | $65.00 | $50.00 |
| 79 | (645.830202) | EACH | 8 | $4,000.00 | $4,600.00 | $2,700.00 |
| 80 | Reference Marker Panel (646.21) | EACH | 86 | $33.00 | $32.00 | $33.00 |
| 81 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 80 | $22.00 | $21.00 | $17.00 |
| 82 | Steel Post, 2.0 lb/ft (646.32) | EACH | 170 | $86.00 | $82.00 | $66.00 |
| 83 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 5 | $106.00 | $100.00 | $170.00 |
| 84 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 189 | $36.00 | $34.50 | $65.00 |
| 85 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 4 | $85.00 | $82.00 | $335.00 |
| 86 | (647.83001002) | | 86 | $12.50 | $7.25 | $28.00 |
| 87 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 23,000 | $0.50 | $0.47 | $0.50 |
| 88 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 30,000 | $0.50 | $0.47 | $0.50 |
| 89 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 1,800 | $5.45 | $5.00 | $5.45 |
| 90 | Field Change Payment (FCP) (697.03) | DOL | 191,000 | $1.00 | $1.00 | $1.00 |
| 91 | Asphalt Price Adjustment (698.04) | DOL | 2,918 | $1.00 | $1.00 | $1.00 |
| 92 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 93 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 94 | Mobilization (699.040001) | LS | 1 | $171,250 | $195,000 | $218,815 |