NYSDOT contract D265598 bid tabulation

ITS REHABILITATION - I-290, I-990, & NY 198. Let by New York State DOT on November 6, 2025, Erie, Region 05. 3 bids received; low bid $4,349,853 by McLaughlin Construction Corp/DBA Edbauer Construction.

Owner
New York State DOT
Letting
06 NOV 2025
Pay items
79
Data through
15 OCT 2026

Bidders

NYSDOT contract D265598: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. McLaughlin Construction Corp/DBA Edbauer Construction2. Cold Spring Construction Company3. Concrete Applied Technologies Corp/DBA:Catco
1Clearing and Grubbing (201.06)LS1$25,000$25,000$10,000
2Select Granular Fill (203.07)CY36$75.00$100.00$200.00
3Conduit Excavation and Backfill including Surface Restoration (206.03)LF173$25.00$115.00$200.00
4 (206.03060005)2,048$15.00$75.00$75.00
5Test Pit Excavation (206.05)EACH8$2,500.00$3,000.00$2,500.00
6Silt Fence - Temporary (209.13)LF150$7.00$10.00$15.00
7Subbase Course, Optional Type (304.15)CY7$92.00$600.00$400.00
8 (603.7409)LF30$488.00$225.00$400.00
9 (607.4016)EACH2$3,800.00$5,000.00$4,500.00
10 (607.97000008)20$95.00$100.00$150.00
11 (617.11000024)LS1$100.00$1.00$100.00
12Basic Work Zone Traffic Control (619.01)LS1$1,022,603$175,000$385,000
13 (619.111113)EACH9$11,000$1,000.00$3,000.00
14 (619.2401)LS1$100,000$10,000$100.00
15Survey Operations (625.01)LS1$28,000$50,000$75,000
16Concrete Cylinder Curing Equipment (637.04)EACH1$500.00$5,000.00$4,000.00
17Engineer’s Field Office – Type 2 (637.12)MONTH26$1,100.00$3,000.00$2,800.00
18Office Technology and Supplies (637.34)DOL2,500$1.00$1.00$1.00
19Construction Testing supplies – Consumables (637.36)DOL115$1.00$1.00$1.00
20 (650.1004)LF153$172.00$150.00$150.00
21 (662.60000108)6,479$1.00$1.00$1.00
22 (662.60000208)3,500$1.00$1.00$1.00
23 (662.60000308)1,725$1.00$1.00$1.00
24 (662.60000508)3,500$1.00$1.00$1.00
25 (662.60001108)3,500$1.00$1.00$1.00
26 (662.60002008)1,725$1.00$1.00$1.00
27 (670.1315)EACH1$2,700.00$15,000$6,000.00
28 (670.25990011)540$13.00$40.00$10.00
29 (670.7002)LF1,104$10.00$6.00$8.00
30 (670.7003)LF812$6.00$5.50$6.50
31 (670.7004)LF1,068$6.00$5.00$5.00
32 (670.7005)LF984$6.00$4.00$5.00
33 (670.7010)LF7,494$8.00$8.00$7.00
34 (670.7030)LF3,243$10.00$12.00$8.50
35 (670.94120004)9,158$3.00$3.00$1.50
36Pole Excavation and Concrete Foundation (680.5001)CY4$3,172.00$6,500.00$5,000.00
37Concrete Base for Controller Cabinet (680.5002)EACH18$4,653.00$5,000.00$4,500.00
38Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH22$1,850.00$5,000.00$1,000.00
39 (680.50500005)25$100.00$250.00$1.00
40 (680.510301)EACH16$2,379.00$2,250.00$2,700.00
41 (680.51100010)65$148.00$175.00$1,725.00
42 (680.520106)LF1,447$23.00$25.00$40.00
43 (680.520506)LF1,868$7.00$20.00$30.00
44 (680.520508)LF225$15.00$25.00$50.00
45 (680.520510)LF3$13.00$150.00$100.00
46 (680.53010010)9,794$5.71$6.00$0.25
47Riser Assembly, 2-inch Diameter (680.700606)EACH30$2,025.00$1,000.00$1,750.00
48 (680.77020010)LS1$3,590.00$200,000$60,000
49 (680.77520025)1,845$3.50$16.00$12.00
50 (680.78010005)32$217.00$600.00$1,100.00
51 (680.78020005)10$1,803.00$1,000.00$1,500.00
52 (680.82250601)2$1,353.00$500.00$2,000.00
53Meter Pan (680.9402)EACH6$450.00$2,500.00$1,500.00
54 (680.95010105)11$3,611.00$500.00$7,000.00
55Performance Concrete Quality Adjustment (680.99)QUALITY UNIT100$27.00$27.00$27.00
56 (680.99060010)3$818.00$500.00$3,000.00
57 (683.08010105)19$17,712$25,000$19,500
58 (683.08010205)22$1,999.00$3,500.00$3,100.00
59 (683.08010305)10$21,730$25,000$34,500
60 (683.08010405)55$11,367$10,000$12,500
61 (683.08010505)1$48,430$115,000$85,000
62 (683.08010705)4$63,450$60,000$70,000
63 (683.08010805)1$105,742$90,000$101,500
64 (683.08010905)1$12,690$12,500$11,500
65 (683.08011005)204$22.00$400.00$120.00
66 (683.08011105)1$6,451.00$3,000.00$3,500.00
67 (683.08011205)100$37.00$150.00$30.00
68 (683.08011305)7$5,631.00$4,000.00$7,000.00
69 (683.08011405)24$540.00$2,000.00$120.00
70 (683.08011505)50$64.00$9,000.00$12,000
71 (683.08011605)1$7,693.00$10,000$5,000.00
72 (683.08020105)8,101$21.00$5.00$18.00
73 (683.79020006)19$2,063.00$3,500.00$5,000.00
74 (683.96030005)2$529.00$8,000.00$3,500.00
75Field Change Payment (FCP) (697.03)DOL217,000$1.00$1.00$1.00
76Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00
77Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00
78Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
79Mobilization (699.040001)LS1$167,000$172,013$190,000
NYSDOT contract D265598: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of November 6, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy