NYSDOT contract D265598 bid tabulation
ITS REHABILITATION - I-290, I-990, & NY 198. Let by New York State DOT on November 6, 2025, Erie, Region 05. 3 bids received; low bid $4,349,853 by McLaughlin Construction Corp/DBA Edbauer Construction.
- Owner
- New York State DOT
- Letting
- 06 NOV 2025
- Pay items
- 79
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McLaughlin Construction Corp/DBA Edbauer Construction | $4,349,853 | Low |
| 2 | Cold Spring Construction Company | $4,496,685 | +3.0% |
| 3 | Concrete Applied Technologies Corp/DBA:Catco | $4,978,961 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McLaughlin Construction Corp/DBA Edbauer Construction | 2. Cold Spring Construction Company | 3. Concrete Applied Technologies Corp/DBA:Catco |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $25,000 | $25,000 | $10,000 |
| 2 | Select Granular Fill (203.07) | CY | 36 | $75.00 | $100.00 | $200.00 |
| 3 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 173 | $25.00 | $115.00 | $200.00 |
| 4 | (206.03060005) | 2,048 | $15.00 | $75.00 | $75.00 | |
| 5 | Test Pit Excavation (206.05) | EACH | 8 | $2,500.00 | $3,000.00 | $2,500.00 |
| 6 | Silt Fence - Temporary (209.13) | LF | 150 | $7.00 | $10.00 | $15.00 |
| 7 | Subbase Course, Optional Type (304.15) | CY | 7 | $92.00 | $600.00 | $400.00 |
| 8 | (603.7409) | LF | 30 | $488.00 | $225.00 | $400.00 |
| 9 | (607.4016) | EACH | 2 | $3,800.00 | $5,000.00 | $4,500.00 |
| 10 | (607.97000008) | 20 | $95.00 | $100.00 | $150.00 | |
| 11 | (617.11000024) | LS | 1 | $100.00 | $1.00 | $100.00 |
| 12 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,022,603 | $175,000 | $385,000 |
| 13 | (619.111113) | EACH | 9 | $11,000 | $1,000.00 | $3,000.00 |
| 14 | (619.2401) | LS | 1 | $100,000 | $10,000 | $100.00 |
| 15 | Survey Operations (625.01) | LS | 1 | $28,000 | $50,000 | $75,000 |
| 16 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $500.00 | $5,000.00 | $4,000.00 |
| 17 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 26 | $1,100.00 | $3,000.00 | $2,800.00 |
| 18 | Office Technology and Supplies (637.34) | DOL | 2,500 | $1.00 | $1.00 | $1.00 |
| 19 | Construction Testing supplies – Consumables (637.36) | DOL | 115 | $1.00 | $1.00 | $1.00 |
| 20 | (650.1004) | LF | 153 | $172.00 | $150.00 | $150.00 |
| 21 | (662.60000108) | 6,479 | $1.00 | $1.00 | $1.00 | |
| 22 | (662.60000208) | 3,500 | $1.00 | $1.00 | $1.00 | |
| 23 | (662.60000308) | 1,725 | $1.00 | $1.00 | $1.00 | |
| 24 | (662.60000508) | 3,500 | $1.00 | $1.00 | $1.00 | |
| 25 | (662.60001108) | 3,500 | $1.00 | $1.00 | $1.00 | |
| 26 | (662.60002008) | 1,725 | $1.00 | $1.00 | $1.00 | |
| 27 | (670.1315) | EACH | 1 | $2,700.00 | $15,000 | $6,000.00 |
| 28 | (670.25990011) | 540 | $13.00 | $40.00 | $10.00 | |
| 29 | (670.7002) | LF | 1,104 | $10.00 | $6.00 | $8.00 |
| 30 | (670.7003) | LF | 812 | $6.00 | $5.50 | $6.50 |
| 31 | (670.7004) | LF | 1,068 | $6.00 | $5.00 | $5.00 |
| 32 | (670.7005) | LF | 984 | $6.00 | $4.00 | $5.00 |
| 33 | (670.7010) | LF | 7,494 | $8.00 | $8.00 | $7.00 |
| 34 | (670.7030) | LF | 3,243 | $10.00 | $12.00 | $8.50 |
| 35 | (670.94120004) | 9,158 | $3.00 | $3.00 | $1.50 | |
| 36 | Pole Excavation and Concrete Foundation (680.5001) | CY | 4 | $3,172.00 | $6,500.00 | $5,000.00 |
| 37 | Concrete Base for Controller Cabinet (680.5002) | EACH | 18 | $4,653.00 | $5,000.00 | $4,500.00 |
| 38 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 22 | $1,850.00 | $5,000.00 | $1,000.00 |
| 39 | (680.50500005) | 25 | $100.00 | $250.00 | $1.00 | |
| 40 | (680.510301) | EACH | 16 | $2,379.00 | $2,250.00 | $2,700.00 |
| 41 | (680.51100010) | 65 | $148.00 | $175.00 | $1,725.00 | |
| 42 | (680.520106) | LF | 1,447 | $23.00 | $25.00 | $40.00 |
| 43 | (680.520506) | LF | 1,868 | $7.00 | $20.00 | $30.00 |
| 44 | (680.520508) | LF | 225 | $15.00 | $25.00 | $50.00 |
| 45 | (680.520510) | LF | 3 | $13.00 | $150.00 | $100.00 |
| 46 | (680.53010010) | 9,794 | $5.71 | $6.00 | $0.25 | |
| 47 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 30 | $2,025.00 | $1,000.00 | $1,750.00 |
| 48 | (680.77020010) | LS | 1 | $3,590.00 | $200,000 | $60,000 |
| 49 | (680.77520025) | 1,845 | $3.50 | $16.00 | $12.00 | |
| 50 | (680.78010005) | 32 | $217.00 | $600.00 | $1,100.00 | |
| 51 | (680.78020005) | 10 | $1,803.00 | $1,000.00 | $1,500.00 | |
| 52 | (680.82250601) | 2 | $1,353.00 | $500.00 | $2,000.00 | |
| 53 | Meter Pan (680.9402) | EACH | 6 | $450.00 | $2,500.00 | $1,500.00 |
| 54 | (680.95010105) | 11 | $3,611.00 | $500.00 | $7,000.00 | |
| 55 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 100 | $27.00 | $27.00 | $27.00 |
| 56 | (680.99060010) | 3 | $818.00 | $500.00 | $3,000.00 | |
| 57 | (683.08010105) | 19 | $17,712 | $25,000 | $19,500 | |
| 58 | (683.08010205) | 22 | $1,999.00 | $3,500.00 | $3,100.00 | |
| 59 | (683.08010305) | 10 | $21,730 | $25,000 | $34,500 | |
| 60 | (683.08010405) | 55 | $11,367 | $10,000 | $12,500 | |
| 61 | (683.08010505) | 1 | $48,430 | $115,000 | $85,000 | |
| 62 | (683.08010705) | 4 | $63,450 | $60,000 | $70,000 | |
| 63 | (683.08010805) | 1 | $105,742 | $90,000 | $101,500 | |
| 64 | (683.08010905) | 1 | $12,690 | $12,500 | $11,500 | |
| 65 | (683.08011005) | 204 | $22.00 | $400.00 | $120.00 | |
| 66 | (683.08011105) | 1 | $6,451.00 | $3,000.00 | $3,500.00 | |
| 67 | (683.08011205) | 100 | $37.00 | $150.00 | $30.00 | |
| 68 | (683.08011305) | 7 | $5,631.00 | $4,000.00 | $7,000.00 | |
| 69 | (683.08011405) | 24 | $540.00 | $2,000.00 | $120.00 | |
| 70 | (683.08011505) | 50 | $64.00 | $9,000.00 | $12,000 | |
| 71 | (683.08011605) | 1 | $7,693.00 | $10,000 | $5,000.00 | |
| 72 | (683.08020105) | 8,101 | $21.00 | $5.00 | $18.00 | |
| 73 | (683.79020006) | 19 | $2,063.00 | $3,500.00 | $5,000.00 | |
| 74 | (683.96030005) | 2 | $529.00 | $8,000.00 | $3,500.00 | |
| 75 | Field Change Payment (FCP) (697.03) | DOL | 217,000 | $1.00 | $1.00 | $1.00 |
| 76 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 77 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 78 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 79 | Mobilization (699.040001) | LS | 1 | $167,000 | $172,013 | $190,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of November 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.