NYSDOT contract D265506 bid tabulation
NY394-Mill & Resurfacing ADA Signal & Drainage Improvements. Let by New York State DOT on July 24, 2025, Chautauqua, Region 05. 3 bids received; low bid $7,114,098 by Concrete Applied Technologies Corp/DBA:Catco.
- Owner
- New York State DOT
- Letting
- 24 JUL 2025
- Pay items
- 214
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Applied Technologies Corp/DBA:Catco | $7,114,098 | Low |
| 2 | Lake Shore Paving Inc | $7,135,768 | 0.0% |
| 3 | McLaughlin Construction Corp/DBA Edbauer Construction | $7,582,222 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Applied Technologies Corp/DBA:Catco | 2. Lake Shore Paving Inc | 3. McLaughlin Construction Corp/DBA Edbauer Construction |
|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 553 | $135.00 | $47.80 | $175.00 |
| 2 | Select Granular Fill (203.07) | CY | 170 | $75.00 | $84.10 | $90.00 |
| 3 | (205.0201) | LS | 1 | $2,500.00 | $1,205.00 | $500.00 |
| 4 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 16 | $115.00 | $175.00 | $20.00 |
| 5 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $290.00 | $664.00 | $40.00 |
| 6 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $200.00 | $960.00 | $50.00 |
| 7 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $60.00 | $36.50 | $20.00 |
| 8 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $30.00 | $17.70 | $15.00 |
| 9 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $98.00 | $101.85 | $20.00 |
| 10 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $113.00 | $88.55 | $20.00 |
| 11 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $98.00 | $116.25 | $20.00 |
| 12 | (205.050201) | TON | 44 | $105.00 | $145.85 | $15.00 |
| 13 | Trench and Culvert Excavation (206.0201) | CY | 296 | $75.00 | $127.50 | $75.00 |
| 14 | (206.03050005) | 1,308 | $100.00 | $127.30 | $107.00 | |
| 15 | (206.03060005) | 1,523 | $65.00 | $71.95 | $40.00 | |
| 16 | Test Pit Excavation (206.05) | EACH | 24 | $2,000.00 | $2,435.40 | $1,525.00 |
| 17 | Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602) | EACH | 5 | $1,500.00 | $1,143.55 | $1,190.00 |
| 18 | (304.15200005) | 389 | $150.00 | $132.30 | $200.00 | |
| 19 | (404.0001) | TON | 276 | $100.00 | $100.00 | $100.00 |
| 20 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $100.00 | $100.00 | $100.00 |
| 21 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 246 | $100.00 | $100.00 | $100.00 |
| 22 | (404.0682) | TON | 339 | $130.00 | $129.65 | $170.00 |
| 23 | (404.0962) | TON | 4,159 | $118.00 | $113.00 | $133.00 |
| 24 | (404.0982) | TON | 286 | $325.00 | $249.50 | $484.00 |
| 25 | (404.1279) | TON | 691 | $117.00 | $113.35 | $138.00 |
| 26 | (404.1989) | TON | 8 | $400.00 | $428.80 | $720.00 |
| 27 | (404.3789) | TON | 20 | $400.00 | $270.90 | $623.00 |
| 28 | Diluted Tack Coat (407.0102) | GAL | 6,504 | $5.00 | $6.90 | $7.00 |
| 29 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 59,507 | $0.60 | $0.45 | $0.04 |
| 30 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 57,671 | $3.00 | $3.15 | $3.70 |
| 31 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 3,475 | $14.00 | $18.40 | $18.00 |
| 32 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 35 | $800.00 | $1,066.00 | $1,941.00 |
| 33 | Shields and Shoring (552.17) | SF | 2,116 | $1.00 | $0.45 | $0.25 |
| 34 | Culvert-End Safety Grate (603.0101) | SF | 20 | $110.00 | $88.90 | $58.00 |
| 35 | (603.17141501) | 4 | $1,200.00 | $1,107.85 | $1,227.00 | |
| 36 | (603.17141801) | 2 | $2,000.00 | $1,503.00 | $1,497.00 | |
| 37 | Concrete Collars (603.77) | EACH | 17 | $2,000.00 | $1,160.00 | $1,840.00 |
| 38 | (603.9815) | LF | 170 | $75.00 | $30.00 | $181.00 |
| 39 | (603.9818) | LF | 42 | $85.00 | $45.75 | $127.00 |
| 40 | (604.070501) | EACH | 42 | $2,600.00 | $760.35 | $4,178.00 |
| 41 | (604.070502) | EACH | 27 | $3,500.00 | $3,062.00 | $4,413.00 |
| 42 | (604.070503) | EACH | 36 | $4,500.00 | $4,697.00 | $4,798.00 |
| 43 | (604.070504) | EACH | 16 | $2,500.00 | $1,531.85 | $2,796.00 |
| 44 | (604.070505) | EACH | 2 | $2,600.00 | $893.00 | $8,100.00 |
| 45 | (604.070506) | EACH | 2 | $6,000.00 | $4,086.00 | $9,100.00 |
| 46 | (604.300103) | LF | 22 | $1,200.00 | $851.00 | $1,100.00 |
| 47 | (604.301911) | LF | 30 | $1,200.00 | $936.55 | $1,150.00 |
| 48 | (604.4048) | LF | 5 | $1,000.00 | $963.00 | $1,249.00 |
| 49 | (605.16030008) | 16 | $80.00 | $30.50 | $142.00 | |
| 50 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $100.00 | $100.00 | $100.00 |
| 51 | Concrete Sidewalks and Driveways (608.0101) | CY | 169 | $1,100.00 | $929.45 | $1,193.00 |
| 52 | (608.01010205) | 97 | $150.00 | $26.40 | $27.00 | |
| 53 | (608.01060415) | 6,118 | $32.00 | $32.15 | $39.00 | |
| 54 | (608.01060615) | 179 | $35.00 | $59.50 | $40.00 | |
| 55 | (608.01070415) | 13,566 | $48.00 | $38.90 | $39.00 | |
| 56 | (608.01070615) | 54 | $65.00 | $57.05 | $40.00 | |
| 57 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 14 | $600.00 | $351.30 | $712.00 |
| 58 | (608.10080008) | 18 | $200.00 | $83.20 | $154.00 | |
| 59 | (608.21000003) | 18 | $400.00 | $425.15 | $550.00 | |
| 60 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 47 | $150.00 | $229.25 | $138.00 |
| 61 | (609.0401) | LF | 840 | $130.00 | $83.00 | $140.00 |
| 62 | (609.10010109) | 1,097 | $130.00 | $151.00 | $211.00 | |
| 63 | Resetting Existing Curb (609.15) | LF | 235 | $75.00 | $53.00 | $97.00 |
| 64 | (609.51000011) | 82 | $20.00 | $28.70 | $30.00 | |
| 65 | Fertilizer (610.0501) | LB | 2 | $80.00 | $60.90 | $75.00 |
| 66 | Topsoil - Roadside (610.1402) | CY | 12 | $450.00 | $520.30 | $500.00 |
| 67 | Turf Establishment - Roadside (610.1601) | SY | 2,025 | $4.00 | $4.85 | $0.01 |
| 68 | Turf Establishment -Lawns (610.1602) | SY | 96 | $6.00 | $46.50 | $0.01 |
| 69 | Transplanting 0 to 48 inch in height (611.10) | EACH | 9 | $700.00 | $553.50 | $96.00 |
| 70 | (618.70000124) | 23 | $200.00 | $153.20 | $104.00 | |
| 71 | (618.71000024) | 19 | $17.50 | $40.30 | $22.00 | |
| 72 | (618.73115124) | 23 | $2,000.00 | $1,363.00 | $1,650.00 | |
| 73 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $267,500 | $256,000 | $556,248 |
| 74 | (619.100101) | LF | 45,200 | $0.25 | $0.24 | $0.24 |
| 75 | (619.111113) | EACH | 18 | $13,000 | $13,963 | $4,610.00 |
| 76 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 162 | $10.00 | $220.00 | $10.00 |
| 77 | Pavement Patching (Force Acount) (619.2601) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 78 | Pavement Patching (Tonnage) (619.2602) | TON | 25 | $1,000.00 | $324.30 | $320.00 |
| 79 | Cleaning Closed Drainage Systems (621.03) | LF | 12,117 | $4.20 | $3.40 | $6.20 |
| 80 | Cleaning Drainage Structures (621.04) | EACH | 68 | $240.00 | $355.00 | $307.00 |
| 81 | (621.51000015) | 1,652 | $9.00 | $9.65 | $10.00 | |
| 82 | Crushed Gravel (In-Place Measure) (623.11) | CY | 1 | $300.00 | $986.00 | $200.00 |
| 83 | Crushed Stone (In-Place Measure) (623.12) | CY | 8 | $120.00 | $386.00 | $75.00 |
| 84 | Survey Operations (625.01) | LS | 1 | $75,000 | $66,600 | $175,000 |
| 85 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 62 | $350.00 | $221.40 | $250.00 |
| 86 | Permanent Survey Markers (625.06) | EACH | 20 | $2,000.00 | $830.25 | $1,425.00 |
| 87 | (627.50140008) | 4,575 | $6.00 | $8.35 | $10.00 | |
| 88 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 108 | $98.00 | $114.60 | $2.00 |
| 89 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 58 | $75.00 | $87.90 | $2.00 |
| 90 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 522 | $60.00 | $52.10 | $2.00 |
| 91 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,300.00 | $3,021.00 | $750.00 |
| 92 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 20 | $2,000.00 | $3,817.00 | $2,300.00 |
| 93 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 94 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 95 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 24,849 | $0.25 | $0.24 | $0.24 |
| 96 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 20,351 | $0.25 | $0.24 | $0.24 |
| 97 | White Paint Reflectorized Pavement Symbols - 15 mils (640.13) | EACH | 116 | $125.00 | $121.75 | $118.00 |
| 98 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 356 | $39.00 | $38.75 | $38.00 |
| 99 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,619 | $47.00 | $46.50 | $46.00 |
| 100 | Overhead Sign Panels (645.61) | SF | 596 | $80.00 | $33.20 | $53.00 |
| 101 | Type A Sign Posts (645.81) | EACH | 494 | $191.00 | $189.30 | $186.00 |
| 102 | (645.81090003) | 60 | $78.00 | $77.50 | $76.00 | |
| 103 | Reference Marker Panel (646.21) | EACH | 25 | $45.00 | $44.30 | $44.00 |
| 104 | Steel Post, 2.0 lb/ft (646.32) | EACH | 25 | $80.00 | $78.60 | $77.00 |
| 105 | Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25) | EACH | 4 | $1,300.00 | $770.90 | $139.00 |
| 106 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 287 | $40.00 | $39.85 | $39.00 |
| 107 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 1 | $90.00 | $88.55 | $87.00 |
| 108 | (647.83001002) | 25 | $17.00 | $16.60 | $20.00 | |
| 109 | Welded Frame & Rectangular Grate 3 (655.1003) | EACH | 1 | $1,250.00 | $1,169.00 | $1,810.00 |
| 110 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 4 | $1,250.00 | $1,169.00 | $1,820.00 |
| 111 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 14 | $1,250.00 | $1,260.00 | $1,883.00 |
| 112 | Manhole Frame & Cover (655.1202) | EACH | 3 | $1,100.00 | $1,169.00 | $1,738.00 |
| 113 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 114 | (662.60000208) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 115 | (662.60000308) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 116 | (662.60000408) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 117 | (662.60000508) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 118 | (663.0104) | LF | 12 | $300.00 | $194.00 | $71.00 |
| 119 | (663.0106) | LF | 20 | $300.00 | $166.80 | $50.00 |
| 120 | (663.1301) | EACH | 8 | $8,000.00 | $6,877.00 | $10,750 |
| 121 | (663.1806) | EACH | 3 | $740.00 | $1,864.00 | $225.00 |
| 122 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 528 | $10.00 | $19.70 | $5.00 |
| 123 | (663.2106) | EACH | 8 | $150.00 | $478.00 | $170.00 |
| 124 | Adjust Existing Valve Box Elevation (663.33) | EACH | 10 | $600.00 | $195.50 | $715.00 |
| 125 | Remove and Dispose of Existing Hydrant (663.43) | EACH | 8 | $700.00 | $244.40 | $922.00 |
| 126 | (680.05010007) | 8 | $22,300 | $24,021 | $22,851 | |
| 127 | (680.05020007) | 8 | $4,500.00 | $4,871.00 | $3,402.00 | |
| 128 | (680.11120814) | 3 | $9,800.00 | $13,221 | $4,286.00 | |
| 129 | (680.11131014) | 30 | $6,500.00 | $7,971.30 | $3,843.00 | |
| 130 | Pole Excavation and Concrete Foundation (680.5001) | CY | 57 | $3,100.00 | $4,525.30 | $2,329.00 |
| 131 | Concrete Base for Controller Cabinet (680.5002) | EACH | 7 | $3,800.00 | $7,638.00 | $4,840.00 |
| 132 | (680.50500005) | 37 | $1.00 | $665.00 | $100.00 | |
| 133 | (680.510201) | EACH | 13 | $2,150.00 | $2,048.00 | $2,570.00 |
| 134 | (680.510301) | EACH | 39 | $2,575.00 | $2,380.00 | $2,848.00 |
| 135 | (680.51100010) | 8 | $400.00 | $387.45 | $275.00 | |
| 136 | (680.520105) | LF | 387 | $22.00 | $25.45 | $20.00 |
| 137 | (680.520506) | LF | 418 | $20.00 | $16.60 | $13.00 |
| 138 | (680.520508) | LF | 5,475 | $18.00 | $23.25 | $13.00 |
| 139 | (680.622023) | EACH | 1 | $13,300 | $15,387 | $14,650 |
| 140 | (680.622024) | EACH | 1 | $13,300 | $15,387 | $14,650 |
| 141 | (680.622025) | EACH | 1 | $14,300 | $15,498 | $14,650 |
| 142 | (680.622026) | EACH | 1 | $13,400 | $15,608 | $14,650 |
| 143 | (680.622027) | EACH | 2 | $13,400 | $15,719 | $14,650 |
| 144 | (680.622028) | EACH | 1 | $14,600 | $15,830 | $14,650 |
| 145 | (680.622030) | EACH | 1 | $14,800 | $16,162 | $15,200 |
| 146 | (680.622032) | EACH | 1 | $14,800 | $16,383 | $15,200 |
| 147 | (680.622033) | EACH | 1 | $14,900 | $16,494 | $15,200 |
| 148 | (680.622034) | EACH | 1 | $14,950 | $16,550 | $15,200 |
| 149 | (680.622036) | EACH | 1 | $16,800 | $18,708 | $17,550 |
| 150 | (680.622040) | EACH | 2 | $17,400 | $18,930 | $17,550 |
| 151 | (680.622060) | EACH | 1 | $34,500 | $48,043 | $45,320 |
| 152 | (680.632044) | EACH | 1 | $21,700 | $34,870 | $33,049 |
| 153 | (680.632052) | EACH | 1 | $25,700 | $35,977 | $33,104 |
| 154 | Single Span Wire Assembly (680.7001) | EACH | 3 | $3,700.00 | $2,878.15 | $3,202.00 |
| 155 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 4 | $1,000.00 | $1,605.10 | $1,320.00 |
| 156 | (680.730514) | LF | 15,652 | $4.00 | $5.55 | $4.10 |
| 157 | (680.730714) | LF | 1,884 | $5.10 | $6.65 | $5.10 |
| 158 | (680.77000105) | 1 | $2,500.00 | $6,531.00 | $5,425.00 | |
| 159 | (680.77000205) | 1 | $2,500.00 | $6,088.00 | $2,322.00 | |
| 160 | (680.77000305) | 1 | $2,500.00 | $6,088.00 | $4,645.00 | |
| 161 | (680.77000405) | 1 | $2,500.00 | $6,088.00 | $3,480.00 | |
| 162 | (680.78010005) | 5 | $900.00 | $719.55 | $580.00 | |
| 163 | (680.78020005) | 3 | $1,000.00 | $664.15 | $924.00 | |
| 164 | (680.78040005) | 2 | $2,500.00 | $2,822.75 | $2,700.00 | |
| 165 | (680.79000105) | 1 | $3,500.00 | $7,195.30 | $3,728.00 | |
| 166 | (680.79000205) | 1 | $3,500.00 | $7,195.30 | $3,728.00 | |
| 167 | (680.79000305) | 1 | $3,500.00 | $7,195.30 | $3,728.00 | |
| 168 | (680.79000405) | 1 | $3,500.00 | $7,195.30 | $3,728.00 | |
| 169 | (680.79000505) | 1 | $3,500.00 | $7,195.30 | $3,728.00 | |
| 170 | (680.80324515) | 8 | $3,500.00 | $3,542.30 | $3,412.00 | |
| 171 | (680.80324708) | 7 | $1,500.00 | $1,992.55 | $1,140.00 | |
| 172 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 56 | $150.00 | $138.35 | $70.00 |
| 173 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 8 | $150.00 | $149.45 | $70.00 |
| 174 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 56 | $150.00 | $160.50 | $70.00 |
| 175 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 14 | $160.00 | $160.50 | $80.00 |
| 176 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 56 | $160.00 | $166.00 | $80.00 |
| 177 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 2 | $160.00 | $171.60 | $90.00 |
| 178 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 40 | $150.00 | $215.85 | $90.00 |
| 179 | Traffic Signal Module - 8-inch, Red Ball, LED (680.810301) | EACH | 8 | $120.00 | $121.75 | $70.00 |
| 180 | Traffic Signal Module - 8-inch, Yellow Ball, LED (680.810303) | EACH | 8 | $120.00 | $149.45 | $70.00 |
| 181 | Traffic Signal Module - 8-inch, Green Ball, LED (680.810305) | EACH | 8 | $120.00 | $155.00 | $70.00 |
| 182 | Traffic Signal Section - Aluminum Type I, 8-inch (680.810307) | EACH | 24 | $125.00 | $193.75 | $70.00 |
| 183 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 124 | $150.00 | $232.45 | $113.00 |
| 184 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 60 | $290.00 | $525.80 | $578.00 |
| 185 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 1 | $400.00 | $636.50 | $323.00 |
| 186 | Traffic Signal Disconnect Hanger (680.8120) | EACH | 24 | $510.00 | $636.50 | $712.00 |
| 187 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 20 | $275.00 | $276.75 | $146.00 |
| 188 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 40 | $275.00 | $304.40 | $180.00 |
| 189 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 14 | $300.00 | $442.80 | $218.00 |
| 190 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 6 | $400.00 | $415.10 | $140.00 |
| 191 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 20 | $275.00 | $304.40 | $185.00 |
| 192 | (680.8151) | EACH | 19 | $1,100.00 | $1,323.00 | $1,634.00 |
| 193 | (680.8152) | EACH | 1 | $2,500.00 | $2,878.15 | $2,032.00 |
| 194 | (680.81990008) | 48 | $240.00 | $387.45 | $187.00 | |
| 195 | (680.8201) | EACH | 4 | $950.00 | $941.00 | $892.00 |
| 196 | (680.8205) | EACH | 30 | $950.00 | $991.00 | $650.00 |
| 197 | (680.82250801) | 37 | $500.00 | $885.55 | $430.00 | |
| 198 | (680.82254210) | 1 | $10,000 | $13,838 | $16,000 | |
| 199 | (680.83010005) | 387 | $6.00 | $4.45 | $7.00 | |
| 200 | Meter Pan (680.9402) | EACH | 5 | $900.00 | $1,937.00 | $1,073.00 |
| 201 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 5 | $500.00 | $1,495.00 | $723.00 |
| 202 | (680.950106) | LF | 2,255 | $3.75 | $4.45 | $3.60 |
| 203 | (680.95110001) | 1 | $8,000.00 | $11,291 | $15,900 | |
| 204 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 |
| 205 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 24,849 | $0.42 | $0.42 | $0.42 |
| 206 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 20,351 | $0.42 | $0.42 | $0.42 |
| 207 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 26,461 | $3.29 | $3.27 | $3.20 |
| 208 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 116 | $307.00 | $304.40 | $299.00 |
| 209 | White Preformed Reflectorized Pavement Stripes (688.01) | LF | 211 | $17.00 | $16.60 | $16.00 |
| 210 | Field Change Payment (FCP) (697.03) | DOL | 280,000 | $1.00 | $1.00 | $1.00 |
| 211 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 212 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 213 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 214 | Mobilization (699.040001) | LS | 1 | $272,000 | $207,422 | $291,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 24, 2025. Compiled by Mirage Metrics.