NYSDOT contract D265506 bid tabulation

NY394-Mill & Resurfacing ADA Signal & Drainage Improvements. Let by New York State DOT on July 24, 2025, Chautauqua, Region 05. 3 bids received; low bid $7,114,098 by Concrete Applied Technologies Corp/DBA:Catco.

Owner
New York State DOT
Letting
24 JUL 2025
Pay items
214
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Concrete Applied Technologies Corp/DBA:Catco$7,114,098Low
2Lake Shore Paving Inc$7,135,7680.0%
3McLaughlin Construction Corp/DBA Edbauer Construction$7,582,222+7.0%
NYSDOT contract D265506: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Concrete Applied Technologies Corp/DBA:Catco2. Lake Shore Paving Inc3. McLaughlin Construction Corp/DBA Edbauer Construction
1Unclassified Excavation and Disposal (203.02)CY553$135.00$47.80$175.00
2Select Granular Fill (203.07)CY170$75.00$84.10$90.00
3 (205.0201)LS1$2,500.00$1,205.00$500.00
4Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR16$115.00$175.00$20.00
5Petroleum Contamination Parameter Analysis (205.0401)EACH2$290.00$664.00$40.00
6Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402)EACH1$200.00$960.00$50.00
7Laboratory Analysis for Ignitability (205.0403)EACH1$60.00$36.50$20.00
8Laboratory Analysis for ph (205.0404)EACH1$30.00$17.70$15.00
9Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405)EACH1$98.00$101.85$20.00
10Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406)EACH1$113.00$88.55$20.00
11Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407)EACH1$98.00$116.25$20.00
12 (205.050201)TON44$105.00$145.85$15.00
13Trench and Culvert Excavation (206.0201)CY296$75.00$127.50$75.00
14 (206.03050005)1,308$100.00$127.30$107.00
15 (206.03060005)1,523$65.00$71.95$40.00
16Test Pit Excavation (206.05)EACH24$2,000.00$2,435.40$1,525.00
17Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602)EACH5$1,500.00$1,143.55$1,190.00
18 (304.15200005)389$150.00$132.30$200.00
19 (404.0001)TON276$100.00$100.00$100.00
20Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1$100.00$100.00$100.00
21Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT246$100.00$100.00$100.00
22 (404.0682)TON339$130.00$129.65$170.00
23 (404.0962)TON4,159$118.00$113.00$133.00
24 (404.0982)TON286$325.00$249.50$484.00
25 (404.1279)TON691$117.00$113.35$138.00
26 (404.1989)TON8$400.00$428.80$720.00
27 (404.3789)TON20$400.00$270.90$623.00
28Diluted Tack Coat (407.0102)GAL6,504$5.00$6.90$7.00
29Asphalt Pavement Joint Adhesive (418.7603)LF59,507$0.60$0.45$0.04
30Production Cold Milling of Bituminous Concrete (490.10)SY57,671$3.00$3.15$3.70
31Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY3,475$14.00$18.40$18.00
32PCC Foundation for Pavement, PEM Concrete (503.1013)CY35$800.00$1,066.00$1,941.00
33Shields and Shoring (552.17)SF2,116$1.00$0.45$0.25
34Culvert-End Safety Grate (603.0101)SF20$110.00$88.90$58.00
35 (603.17141501)4$1,200.00$1,107.85$1,227.00
36 (603.17141801)2$2,000.00$1,503.00$1,497.00
37Concrete Collars (603.77)EACH17$2,000.00$1,160.00$1,840.00
38 (603.9815)LF170$75.00$30.00$181.00
39 (603.9818)LF42$85.00$45.75$127.00
40 (604.070501)EACH42$2,600.00$760.35$4,178.00
41 (604.070502)EACH27$3,500.00$3,062.00$4,413.00
42 (604.070503)EACH36$4,500.00$4,697.00$4,798.00
43 (604.070504)EACH16$2,500.00$1,531.85$2,796.00
44 (604.070505)EACH2$2,600.00$893.00$8,100.00
45 (604.070506)EACH2$6,000.00$4,086.00$9,100.00
46 (604.300103)LF22$1,200.00$851.00$1,100.00
47 (604.301911)LF30$1,200.00$936.55$1,150.00
48 (604.4048)LF5$1,000.00$963.00$1,249.00
49 (605.16030008)16$80.00$30.50$142.00
50Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$100.00$100.00$100.00
51Concrete Sidewalks and Driveways (608.0101)CY169$1,100.00$929.45$1,193.00
52 (608.01010205)97$150.00$26.40$27.00
53 (608.01060415)6,118$32.00$32.15$39.00
54 (608.01060615)179$35.00$59.50$40.00
55 (608.01070415)13,566$48.00$38.90$39.00
56 (608.01070615)54$65.00$57.05$40.00
57Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON14$600.00$351.30$712.00
58 (608.10080008)18$200.00$83.20$154.00
59 (608.21000003)18$400.00$425.15$550.00
60Stone Curb – Near Vertical Face (NVF) (609.0212)LF47$150.00$229.25$138.00
61 (609.0401)LF840$130.00$83.00$140.00
62 (609.10010109)1,097$130.00$151.00$211.00
63Resetting Existing Curb (609.15)LF235$75.00$53.00$97.00
64 (609.51000011)82$20.00$28.70$30.00
65Fertilizer (610.0501)LB2$80.00$60.90$75.00
66Topsoil - Roadside (610.1402)CY12$450.00$520.30$500.00
67Turf Establishment - Roadside (610.1601)SY2,025$4.00$4.85$0.01
68Turf Establishment -Lawns (610.1602)SY96$6.00$46.50$0.01
69Transplanting 0 to 48 inch in height (611.10)EACH9$700.00$553.50$96.00
70 (618.70000124)23$200.00$153.20$104.00
71 (618.71000024)19$17.50$40.30$22.00
72 (618.73115124)23$2,000.00$1,363.00$1,650.00
73Basic Work Zone Traffic Control (619.01)LS1$267,500$256,000$556,248
74 (619.100101)LF45,200$0.25$0.24$0.24
75 (619.111113)EACH18$13,000$13,963$4,610.00
76Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH162$10.00$220.00$10.00
77Pavement Patching (Force Acount) (619.2601)DOL5,000$1.00$1.00$1.00
78Pavement Patching (Tonnage) (619.2602)TON25$1,000.00$324.30$320.00
79Cleaning Closed Drainage Systems (621.03)LF12,117$4.20$3.40$6.20
80Cleaning Drainage Structures (621.04)EACH68$240.00$355.00$307.00
81 (621.51000015)1,652$9.00$9.65$10.00
82Crushed Gravel (In-Place Measure) (623.11)CY1$300.00$986.00$200.00
83Crushed Stone (In-Place Measure) (623.12)CY8$120.00$386.00$75.00
84Survey Operations (625.01)LS1$75,000$66,600$175,000
85Steel Pin and Cap Right of Way Markers (625.05)EACH62$350.00$221.40$250.00
86Permanent Survey Markers (625.06)EACH20$2,000.00$830.25$1,425.00
87 (627.50140008)4,575$6.00$8.35$10.00
88Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401)SY108$98.00$114.60$2.00
89Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402)SY58$75.00$87.90$2.00
90Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403)SY522$60.00$52.10$2.00
91Concrete Cylinder Curing Equipment (637.04)EACH1$3,300.00$3,021.00$750.00
92Engineer’s Field Office – Type 2 (637.12)MONTH20$2,000.00$3,817.00$2,300.00
93Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00
94Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00
95White Paint Reflectorized Pavement Stripes – 15 mils (640.10)LF24,849$0.25$0.24$0.24
96Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11)LF20,351$0.25$0.24$0.24
97White Paint Reflectorized Pavement Symbols - 15 mils (640.13)EACH116$125.00$121.75$118.00
98Ground-Mounted Sign Panels without Z-bars (645.5101)SF356$39.00$38.75$38.00
99Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF1,619$47.00$46.50$46.00
100Overhead Sign Panels (645.61)SF596$80.00$33.20$53.00
101Type A Sign Posts (645.81)EACH494$191.00$189.30$186.00
102 (645.81090003)60$78.00$77.50$76.00
103Reference Marker Panel (646.21)EACH25$45.00$44.30$44.00
104Steel Post, 2.0 lb/ft (646.32)EACH25$80.00$78.60$77.00
105Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25)EACH4$1,300.00$770.90$139.00
106Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH287$40.00$39.85$39.00
107Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH1$90.00$88.55$87.00
108 (647.83001002)25$17.00$16.60$20.00
109Welded Frame & Rectangular Grate 3 (655.1003)EACH1$1,250.00$1,169.00$1,810.00
110Welded Frame & Reticuline Grate 3 (655.1103)EACH4$1,250.00$1,169.00$1,820.00
111Welded Frame & Reticuline Grate 11 (655.1111)EACH14$1,250.00$1,260.00$1,883.00
112Manhole Frame & Cover (655.1202)EACH3$1,100.00$1,169.00$1,738.00
113 (662.60000108)2,500$1.00$1.00$1.00
114 (662.60000208)2,500$1.00$1.00$1.00
115 (662.60000308)2,500$1.00$1.00$1.00
116 (662.60000408)2,500$1.00$1.00$1.00
117 (662.60000508)2,500$1.00$1.00$1.00
118 (663.0104)LF12$300.00$194.00$71.00
119 (663.0106)LF20$300.00$166.80$50.00
120 (663.1301)EACH8$8,000.00$6,877.00$10,750
121 (663.1806)EACH3$740.00$1,864.00$225.00
122Iron Water Main Fittings (3 - 8 inch diameter) (663.2001)LB528$10.00$19.70$5.00
123 (663.2106)EACH8$150.00$478.00$170.00
124Adjust Existing Valve Box Elevation (663.33)EACH10$600.00$195.50$715.00
125Remove and Dispose of Existing Hydrant (663.43)EACH8$700.00$244.40$922.00
126 (680.05010007)8$22,300$24,021$22,851
127 (680.05020007)8$4,500.00$4,871.00$3,402.00
128 (680.11120814)3$9,800.00$13,221$4,286.00
129 (680.11131014)30$6,500.00$7,971.30$3,843.00
130Pole Excavation and Concrete Foundation (680.5001)CY57$3,100.00$4,525.30$2,329.00
131Concrete Base for Controller Cabinet (680.5002)EACH7$3,800.00$7,638.00$4,840.00
132 (680.50500005)37$1.00$665.00$100.00
133 (680.510201)EACH13$2,150.00$2,048.00$2,570.00
134 (680.510301)EACH39$2,575.00$2,380.00$2,848.00
135 (680.51100010)8$400.00$387.45$275.00
136 (680.520105)LF387$22.00$25.45$20.00
137 (680.520506)LF418$20.00$16.60$13.00
138 (680.520508)LF5,475$18.00$23.25$13.00
139 (680.622023)EACH1$13,300$15,387$14,650
140 (680.622024)EACH1$13,300$15,387$14,650
141 (680.622025)EACH1$14,300$15,498$14,650
142 (680.622026)EACH1$13,400$15,608$14,650
143 (680.622027)EACH2$13,400$15,719$14,650
144 (680.622028)EACH1$14,600$15,830$14,650
145 (680.622030)EACH1$14,800$16,162$15,200
146 (680.622032)EACH1$14,800$16,383$15,200
147 (680.622033)EACH1$14,900$16,494$15,200
148 (680.622034)EACH1$14,950$16,550$15,200
149 (680.622036)EACH1$16,800$18,708$17,550
150 (680.622040)EACH2$17,400$18,930$17,550
151 (680.622060)EACH1$34,500$48,043$45,320
152 (680.632044)EACH1$21,700$34,870$33,049
153 (680.632052)EACH1$25,700$35,977$33,104
154Single Span Wire Assembly (680.7001)EACH3$3,700.00$2,878.15$3,202.00
155Riser Assembly, 1-inch Diameter (680.700603)EACH4$1,000.00$1,605.10$1,320.00
156 (680.730514)LF15,652$4.00$5.55$4.10
157 (680.730714)LF1,884$5.10$6.65$5.10
158 (680.77000105)1$2,500.00$6,531.00$5,425.00
159 (680.77000205)1$2,500.00$6,088.00$2,322.00
160 (680.77000305)1$2,500.00$6,088.00$4,645.00
161 (680.77000405)1$2,500.00$6,088.00$3,480.00
162 (680.78010005)5$900.00$719.55$580.00
163 (680.78020005)3$1,000.00$664.15$924.00
164 (680.78040005)2$2,500.00$2,822.75$2,700.00
165 (680.79000105)1$3,500.00$7,195.30$3,728.00
166 (680.79000205)1$3,500.00$7,195.30$3,728.00
167 (680.79000305)1$3,500.00$7,195.30$3,728.00
168 (680.79000405)1$3,500.00$7,195.30$3,728.00
169 (680.79000505)1$3,500.00$7,195.30$3,728.00
170 (680.80324515)8$3,500.00$3,542.30$3,412.00
171 (680.80324708)7$1,500.00$1,992.55$1,140.00
172Traffic Signal Module - 12-inch, Red Ball, LED (680.810101)EACH56$150.00$138.35$70.00
173Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102)EACH8$150.00$149.45$70.00
174Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103)EACH56$150.00$160.50$70.00
175Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104)EACH14$160.00$160.50$80.00
176Traffic Signal Module - 12-inch, Green Ball, LED (680.810105)EACH56$160.00$166.00$80.00
177Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106)EACH2$160.00$171.60$90.00
178Traffic Signal Section - Aluminum Type I, 12-inch (680.810107)EACH40$150.00$215.85$90.00
179Traffic Signal Module - 8-inch, Red Ball, LED (680.810301)EACH8$120.00$121.75$70.00
180Traffic Signal Module - 8-inch, Yellow Ball, LED (680.810303)EACH8$120.00$149.45$70.00
181Traffic Signal Module - 8-inch, Green Ball, LED (680.810305)EACH8$120.00$155.00$70.00
182Traffic Signal Section - Aluminum Type I, 8-inch (680.810307)EACH24$125.00$193.75$70.00
183Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH124$150.00$232.45$113.00
184Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH60$290.00$525.80$578.00
185Traffic Signal Bracket Assembly - 2 Way (680.8112)EACH1$400.00$636.50$323.00
186Traffic Signal Disconnect Hanger (680.8120)EACH24$510.00$636.50$712.00
187Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105)EACH20$275.00$276.75$146.00
188Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH40$275.00$304.40$180.00
189Pedestrian Signal Bracket Mount Assembly (680.8141)EACH14$300.00$442.80$218.00
190Pedestrian Signal Post Top Mount Assembly (680.8142)EACH6$400.00$415.10$140.00
191Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001)EACH20$275.00$304.40$185.00
192 (680.8151)EACH19$1,100.00$1,323.00$1,634.00
193 (680.8152)EACH1$2,500.00$2,878.15$2,032.00
194 (680.81990008)48$240.00$387.45$187.00
195 (680.8201)EACH4$950.00$941.00$892.00
196 (680.8205)EACH30$950.00$991.00$650.00
197 (680.82250801)37$500.00$885.55$430.00
198 (680.82254210)1$10,000$13,838$16,000
199 (680.83010005)387$6.00$4.45$7.00
200Meter Pan (680.9402)EACH5$900.00$1,937.00$1,073.00
201Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH5$500.00$1,495.00$723.00
202 (680.950106)LF2,255$3.75$4.45$3.60
203 (680.95110001)1$8,000.00$11,291$15,900
204Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$10.00$10.00$10.00
205White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF24,849$0.42$0.42$0.42
206Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF20,351$0.42$0.42$0.42
207White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF26,461$3.29$3.27$3.20
208White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH116$307.00$304.40$299.00
209White Preformed Reflectorized Pavement Stripes (688.01)LF211$17.00$16.60$16.00
210Field Change Payment (FCP) (697.03)DOL280,000$1.00$1.00$1.00
211Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00
212Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00
213Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
214Mobilization (699.040001)LS1$272,000$207,422$291,000
NYSDOT contract D265506: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of July 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way