NYSDOT contract D265798 bid tabulation
Highway Rehabilitation - NY 394. Let by New York State DOT on May 21, 2026, Chautauqua, Region 05. 2 bids received; low bid $3,717,394 by Concrete Applied Technologies Corp/DBA:Catco.
- Owner
- New York State DOT
- Letting
- 21 MAY 2026
- Pay items
- 104
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Applied Technologies Corp/DBA:Catco | $3,717,394 | Low |
| 2 | Lake Shore Paving Inc | $3,945,030 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Applied Technologies Corp/DBA:Catco | 2. Lake Shore Paving Inc |
|---|---|---|---|---|---|
| 1 | Select Granular Fill (203.07) | CY | 154 | $80.00 | $151.25 |
| 2 | Trench and Culvert Excavation (206.0201) | CY | 304 | $85.00 | $56.25 |
| 3 | (206.03050005) | 640 | $100.00 | $60.75 | |
| 4 | (206.03060005) | 320 | $65.00 | $128.35 | |
| 5 | Test Pit Excavation (206.05) | EACH | 13 | $2,500.00 | $28.70 |
| 6 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 16 | $10.00 | $249.80 |
| 7 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 315 | $100.00 | $100.00 |
| 8 | (404.0189) | TON | 75 | $225.00 | $169.50 |
| 9 | (404.0962) | TON | 7,090 | $110.00 | $110.35 |
| 10 | Diluted Tack Coat (407.0102) | GAL | 8,222 | $5.50 | $5.62 |
| 11 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 47,657 | $0.40 | $0.47 |
| 12 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 70,800 | $3.00 | $2.07 |
| 13 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 3,420 | $15.00 | $21.32 |
| 14 | Shields and Shoring (552.17) | SF | 2,479 | $0.01 | $1.15 |
| 15 | (603.7403) | LF | 33 | $250.00 | $170.00 |
| 16 | (603.7405) | LF | 5 | $500.00 | $433.00 |
| 17 | (603.7409) | LF | 100 | $300.00 | $205.50 |
| 18 | Concrete Collars (603.77) | EACH | 1 | $2,500.00 | $2,105.00 |
| 19 | (604.070101) | EACH | 1 | $6,000.00 | $3,782.63 |
| 20 | (604.070102) | EACH | 1 | $800.00 | $1,478.17 |
| 21 | (604.070501) | EACH | 16 | $2,500.00 | $2,098.05 |
| 22 | (604.070502) | EACH | 105 | $100.00 | $2,857.50 |
| 23 | (604.301122) | LF | 17 | $1,525.00 | $907.80 |
| 24 | (604.302016) | LF | 6 | $800.00 | $474.55 |
| 25 | (608.01070415) | 8,956 | $45.00 | $50.31 | |
| 26 | (608.21000003) | 20 | $500.00 | $479.33 | |
| 27 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $420,900 | $218,418 |
| 28 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 12 | $10.00 | $114.81 |
| 29 | (619.161401) | EACH | 1 | $3,000.00 | $5,740.56 |
| 30 | (619.161402) | EACH | 1 | $3,000.00 | $5,740.56 |
| 31 | Survey Operations (625.01) | LS | 1 | $48,000 | $45,226 |
| 32 | (627.50140008) | 1,345 | $7.00 | $4.49 | |
| 33 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,500.00 | $2,306.22 |
| 34 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 14 | $2,600.00 | $2,361.00 |
| 35 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,091 | $39.00 | $40.18 |
| 36 | Overhead Sign Panels (645.61) | SF | 147 | $112.00 | $37.89 |
| 37 | Type A Sign Posts (645.81) | EACH | 222 | $197.00 | $203.21 |
| 38 | (645.81090003) | 8 | $62.00 | $64.29 | |
| 39 | Reference Marker Panel (646.21) | EACH | 40 | $40.00 | $41.33 |
| 40 | Steel Post, 2.0 lb/ft (646.32) | EACH | 4 | $73.00 | $72.33 |
| 41 | Flexible Delineator, Single Unit, Back to Back (646.41) | EACH | 6 | $222.00 | $228.47 |
| 42 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $145.00 | $149.26 |
| 43 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 105 | $36.00 | $36.74 |
| 44 | (647.83001002) | 4 | $20.00 | $10.33 | |
| 45 | Welded Frame & Reticuline Grate 16 (655.1116) | EACH | 1 | $1,450.00 | $1,843.00 |
| 46 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 3 | $1,610.00 | $1,860.00 |
| 47 | (662.60000108) | 1,000 | $1.00 | $1.00 | |
| 48 | Adjust Existing Valve Box Elevation (663.33) | EACH | 11 | $600.00 | $211.31 |
| 49 | (680.05010007) | 7 | $26,000 | $33,295 | |
| 50 | (680.05020007) | 7 | $5,200.00 | $8,036.78 | |
| 51 | (680.11131014) | 4 | $8,000.00 | $11,481 | |
| 52 | (680.11140814) | 1 | $9,000.00 | $17,221 | |
| 53 | Pole Excavation and Concrete Foundation (680.5001) | CY | 27 | $3,400.00 | $2,870.28 |
| 54 | Concrete Base for Controller Cabinet (680.5002) | EACH | 2 | $4,000.00 | $4,592.45 |
| 55 | (680.50500005) | 16 | $10.00 | $861.10 | |
| 56 | (680.510201) | EACH | 4 | $2,300.00 | $2,411.03 |
| 57 | (680.510301) | EACH | 11 | $2,500.00 | $2,755.47 |
| 58 | (680.520105) | LF | 43 | $40.00 | $28.70 |
| 59 | (680.520506) | LF | 130 | $25.00 | $22.96 |
| 60 | (680.520508) | LF | 1,950 | $18.00 | $28.70 |
| 61 | (680.621732) | EACH | 1 | $17,250 | $19,748 |
| 62 | (680.621742) | EACH | 2 | $18,630 | $21,304 |
| 63 | (680.621744) | EACH | 1 | $19,000 | $22,564 |
| 64 | (680.621824) | EACH | 1 | $14,750 | $18,263 |
| 65 | (680.621833) | EACH | 1 | $17,250 | $20,986 |
| 66 | (680.621841) | EACH | 1 | $18,775 | $22,575 |
| 67 | (680.621953) | EACH | 1 | $24,400 | $28,099 |
| 68 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 2 | $1,000.00 | $1,148.11 |
| 69 | (680.730514) | LF | 4,375 | $5.10 | $5.74 |
| 70 | (680.730714) | LF | 1,090 | $6.00 | $6.03 |
| 71 | (680.79000205) | 1 | $4,000.00 | $5,740.52 | |
| 72 | (680.79001005) | 1 | $4,000.00 | $5,740.52 | |
| 73 | (680.80324515) | 9 | $3,200.00 | $5,740.52 | |
| 74 | (680.80324708) | 2 | $1,800.00 | $3,444.32 | |
| 75 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 16 | $150.00 | $229.62 |
| 76 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 6 | $150.00 | $229.62 |
| 77 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 16 | $150.00 | $229.62 |
| 78 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 12 | $150.00 | $229.62 |
| 79 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 16 | $150.00 | $229.62 |
| 80 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 6 | $150.00 | $229.62 |
| 81 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 72 | $170.00 | $344.43 |
| 82 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 22 | $450.00 | $574.05 |
| 83 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 8 | $260.00 | $315.73 |
| 84 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 16 | $275.00 | $396.09 |
| 85 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 7 | $700.00 | $574.05 |
| 86 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 8 | $260.00 | $430.53 |
| 87 | (680.8151) | EACH | 8 | $1,200.00 | $1,148.11 |
| 88 | Backplates for Traffic Signal Heads (680.8199) | EACH | 22 | $300.00 | $459.25 |
| 89 | (680.8205) | EACH | 16 | $1,100.00 | $1,148.11 |
| 90 | Meter Pan (680.9402) | EACH | 2 | $1,000.00 | $1,377.73 |
| 91 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 2 | $1,000.00 | $1,148.11 |
| 92 | (680.950106) | LF | 145 | $9.00 | $3.44 |
| 93 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $15.00 | $15.00 |
| 94 | (680.99050010) | 2 | $500.00 | $1,377.73 | |
| 95 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 13,259 | $0.76 | $0.78 |
| 96 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 21,874 | $0.76 | $0.78 |
| 97 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 16,847 | $4.16 | $4.31 |
| 98 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 103 | $4.20 | $4.31 |
| 99 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 119 | $261.00 | $269.81 |
| 100 | Field Change Payment (FCP) (697.03) | DOL | 176,000 | $1.00 | $1.00 |
| 101 | Asphalt Price Adjustment (698.04) | DOL | 18,110 | $1.00 | $1.00 |
| 102 | Fuel Price Adjustment (698.05) | DOL | 5,290 | $1.00 | $1.00 |
| 103 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 104 | Mobilization (699.040001) | LS | 1 | $142,000 | $143,602 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 21, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.