NYSDOT contract D265591 bid tabulation
TRAFFIC SIGNAL POLE REPLACEMENTS - NY Rts 954G, 430,394. Let by New York State DOT on October 23, 2025, Chautauqua, Erie, Region 05. 3 bids received; low bid $457,694 by Concrete Applied Technologies Corp/DBA:Catco.
- Owner
- New York State DOT
- Letting
- 23 OCT 2025
- Pay items
- 68
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Applied Technologies Corp/DBA:Catco | $457,694 | Low |
| 2 | Millennium Construction Inc | $496,009 | +8.0% |
| 3 | McLaughlin Construction Corp/DBA Edbauer Construction | $509,289 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Applied Technologies Corp/DBA:Catco | 2. Millennium Construction Inc | 3. McLaughlin Construction Corp/DBA Edbauer Construction |
|---|---|---|---|---|---|---|
| 1 | (205.0201) | LS | 1 | $1.00 | $500.00 | $100.00 |
| 2 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $1.00 | $100.00 | $10.00 |
| 3 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $1.00 | $250.00 | $5.00 |
| 4 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $1.00 | $250.00 | $20.00 |
| 5 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $1.00 | $100.00 | $20.00 |
| 6 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $1.00 | $100.00 | $15.00 |
| 7 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $1.00 | $100.00 | $20.00 |
| 8 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $1.00 | $100.00 | $20.00 |
| 9 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $1.00 | $100.00 | $20.00 |
| 10 | (205.050201) | TON | 24 | $1.00 | $100.00 | $25.00 |
| 11 | (206.03060005) | 77 | $75.00 | $60.00 | $75.00 | |
| 12 | Test Pit Excavation (206.05) | EACH | 6 | $2,200.00 | $1.00 | $3,000.00 |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 6 | $1.00 | $1.00 | $0.01 |
| 14 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 3 | $1.00 | $1.00 | $0.01 |
| 15 | (608.01060415) | 45 | $60.00 | $95.00 | $88.00 | |
| 16 | (608.01060615) | 455 | $60.00 | $95.00 | $88.00 | |
| 17 | (608.01070415) | 245 | $60.00 | $95.00 | $88.00 | |
| 18 | (608.01070615) | 55 | $75.00 | $95.00 | $88.00 | |
| 19 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $78,700 | $42,900 | $52,898 |
| 20 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 90 | $10.00 | $30.00 | $30.00 |
| 21 | Survey Operations (625.01) | LS | 1 | $15,000 | $13,000 | $10,000 |
| 22 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 4 | $500.00 | $620.00 | $425.00 |
| 23 | (625.09010015) | LS | 1 | $100.00 | $1.00 | $0.01 |
| 24 | (635.01030011) | 2,742 | $1.65 | $2.00 | $1.80 | |
| 25 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $100.00 | $1.00 | $250.00 |
| 26 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 18 | $100.00 | $750.00 | $1,100.00 |
| 27 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 28 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 29 | (640.11020004) | 2,333 | $1.93 | $2.25 | $2.10 | |
| 30 | (640.12020004) | 410 | $1.93 | $2.25 | $2.10 | |
| 31 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 103 | $51.00 | $55.00 | $70.00 |
| 32 | Type A Sign Posts (645.81) | EACH | 14 | $358.00 | $400.00 | $400.00 |
| 33 | (645.81090003) | 14 | $58.00 | $65.00 | $140.00 | |
| 34 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $26.00 | $30.00 | $25.00 |
| 35 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 12 | $44.00 | $50.00 | $25.00 |
| 36 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 37 | (662.60000208) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 38 | (662.60000308) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 39 | Pole Excavation and Concrete Foundation (680.5001) | CY | 9 | $3,500.00 | $5,375.00 | $5,012.00 |
| 40 | (680.510201) | EACH | 9 | $2,200.00 | $2,380.00 | $2,500.00 |
| 41 | (680.520105) | LF | 65 | $50.00 | $50.00 | $46.00 |
| 42 | (680.520506) | LF | 12 | $100.00 | $35.00 | $32.00 |
| 43 | (680.600232) | EACH | 4 | $10,900 | $9,800.00 | $9,500.00 |
| 44 | (680.600328) | EACH | 1 | $11,000 | $11,000 | $11,000 |
| 45 | (680.600332) | EACH | 1 | $12,100 | $11,400 | $11,000 |
| 46 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 3 | $4,000.00 | $4,785.00 | $4,500.00 |
| 47 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 3 | $1,150.00 | $1,700.00 | $1,600.00 |
| 48 | (680.730514) | LF | 2,207 | $5.00 | $5.50 | $5.10 |
| 49 | (680.79000105) | 1 | $2,500.00 | $4,750.00 | $4,500.00 | |
| 50 | (680.79000205) | 1 | $2,500.00 | $4,750.00 | $4,500.00 | |
| 51 | (680.79000305) | 1 | $2,500.00 | $4,750.00 | $4,500.00 | |
| 52 | (680.80324515) | 3 | $3,200.00 | $3,680.00 | $3,500.00 | |
| 53 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 20 | $220.00 | $75.00 | $75.00 |
| 54 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 4 | $220.00 | $75.00 | $75.00 |
| 55 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 24 | $220.00 | $125.00 | $120.00 |
| 56 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 24 | $350.00 | $290.00 | $270.00 |
| 57 | Traffic Signal Disconnect Hanger (680.8120) | EACH | 24 | $550.00 | $1,400.00 | $1,350.00 |
| 58 | Backplates for Traffic Signal Heads (680.8199) | EACH | 24 | $225.00 | $355.00 | $332.00 |
| 59 | (680.82250301) | 6 | $2,200.00 | $1,340.00 | $1,250.00 | |
| 60 | Meter Pan (680.9402) | EACH | 3 | $1,000.00 | $1,385.00 | $1,300.00 |
| 61 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 3 | $1,000.00 | $1,000.00 | $950.00 |
| 62 | (680.950106) | LF | 418 | $5.00 | $8.25 | $8.00 |
| 63 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 |
| 64 | Field Change Payment (FCP) (697.03) | DOL | 20,000 | $1.00 | $1.00 | $1.00 |
| 65 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 66 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 67 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 68 | Mobilization (699.040001) | LS | 1 | $16,500 | $18,499 | $19,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.