NYSDOT contract D265609 bid tabulation
RECONSTRUCT/RESURFACE - NY Route 93. Let by New York State DOT on February 5, 2026, Niagara, Region 05. 4 bids received; low bid $8,489,840 by D&H Paving LLC.
- Owner
- New York State DOT
- Letting
- 05 FEB 2026
- Pay items
- 165
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D&H Paving LLC | $8,489,840 | Low |
| 2 | Concrete Applied Technologies Corp/DBA:Catco | $8,699,000 | +2.0% |
| 3 | Mark Cerrone Inc | $9,996,500 | +18% |
| 4 | McLaughlin Construction Corp/DBA Edbauer Construction | $10,794,612 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D&H Paving LLC | 2. Concrete Applied Technologies Corp/DBA:Catco | 3. Mark Cerrone Inc | 4. McLaughlin Construction Corp/DBA Edbauer Construction |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $10,000 | $5,000.00 | $42,000 | $100,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 19,000 | $30.00 | $38.00 | $34.50 | $30.00 |
| 3 | Embankment In Place (203.03) | CY | 200 | $45.00 | $65.00 | $37.00 | $71.00 |
| 4 | Select Granular Fill (203.07) | CY | 5,700 | $50.00 | $65.00 | $86.50 | $76.00 |
| 5 | (205.0201) | LS | 1 | $18,000 | $4,000.00 | $7,500.00 | $100.00 |
| 6 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $180.00 | $110.00 | $137.00 | $1.00 |
| 7 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $1,125.00 | $270.00 | $1,475.00 | $1.00 |
| 8 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $450.00 | $190.00 | $1,475.00 | $1.00 |
| 9 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $75.00 | $60.00 | $55.00 | $1.00 |
| 10 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $35.00 | $30.00 | $55.00 | $1.00 |
| 11 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $105.00 | $93.00 | $165.00 | $1.00 |
| 12 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $120.00 | $110.00 | $550.00 | $1.00 |
| 13 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $120.00 | $93.00 | $550.00 | $1.00 |
| 14 | (205.050201) | TON | 24 | $130.00 | $110.00 | $250.00 | $10.00 |
| 15 | Trench and Culvert Excavation (206.0201) | CY | 9,500 | $65.00 | $35.00 | $53.00 | $64.00 |
| 16 | (206.03050005) | 215 | $120.00 | $100.00 | $179.00 | $102.00 | |
| 17 | (206.03060005) | 1,337 | $75.00 | $50.00 | $54.00 | $33.00 | |
| 18 | Geotextile Separation (207.21) | SY | 22,000 | $2.00 | $1.85 | $2.50 | $1.40 |
| 19 | (207.96000017) | 6,000 | $0.40 | $1.00 | $0.85 | $1.57 | |
| 20 | Seed and Mulch – Temporary (209.1003) | SY | 3,139 | $1.50 | $3.00 | $1.30 | $0.25 |
| 21 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 72 | $140.00 | $5.00 | $725.00 | $0.01 |
| 22 | (209.23010009) | 270 | $10.00 | $20.00 | $10.00 | $2.00 | |
| 23 | (304.00010018) | 40,000 | $1.50 | $0.75 | $1.60 | $0.90 | |
| 24 | (304.15010005) | 11,000 | $60.00 | $65.00 | $100.00 | $73.00 | |
| 25 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 | $105.00 |
| 26 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 47 | $105.00 | $105.00 | $105.00 | $105.00 |
| 27 | (404.0962) | TON | 2,330 | $115.00 | $116.00 | $145.00 | $130.00 |
| 28 | (404.0982) | TON | 190 | $170.00 | $325.00 | $250.00 | $380.00 |
| 29 | (404.1969) | TON | 3,000 | $105.00 | $104.00 | $125.00 | $132.00 |
| 30 | (404.1989) | TON | 115 | $130.00 | $295.00 | $265.00 | $310.00 |
| 31 | (404.3769) | TON | 7,000 | $101.00 | $100.00 | $125.00 | $126.00 |
| 32 | (404.3789) | TON | 250 | $121.00 | $275.00 | $177.00 | $286.00 |
| 33 | (404.4389) | TON | 225 | $150.00 | $200.00 | $322.00 | $188.00 |
| 34 | Diluted Tack Coat (407.0102) | GAL | 3,350 | $4.50 | $5.00 | $13.70 | $9.00 |
| 35 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 20,700 | $0.60 | $0.50 | $0.35 | $0.25 |
| 36 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 6,550 | $3.00 | $2.50 | $5.50 | $5.50 |
| 37 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,150 | $7.00 | $12.00 | $32.00 | $15.00 |
| 38 | Shields and Shoring (552.17) | SF | 113,000 | $0.60 | $1.45 | $0.01 | $0.05 |
| 39 | (601.01110001) | 151 | $226.00 | $60.00 | $49.00 | $45.00 | |
| 40 | (603.171216) | EACH | 1 | $450.00 | $400.00 | $220.00 | $682.00 |
| 41 | (603.6003) | LF | 36 | $140.00 | $200.00 | $155.00 | $227.00 |
| 42 | (603.6005) | LF | 32 | $155.00 | $500.00 | $207.00 | $270.00 |
| 43 | Concrete Collars (603.77) | EACH | 8 | $1,900.00 | $2,000.00 | $1,900.00 | $2,745.00 |
| 44 | (603.9815) | LF | 834 | $55.00 | $40.00 | $45.00 | $75.00 |
| 45 | (603.9818) | LF | 6,303 | $60.00 | $45.00 | $38.00 | $65.00 |
| 46 | (603.9824) | LF | 788 | $70.00 | $60.00 | $68.00 | $93.00 |
| 47 | (603.9830) | LF | 43 | $75.00 | $100.00 | $140.00 | $225.00 |
| 48 | (603.9836) | LF | 111 | $80.00 | $125.00 | $99.00 | $190.00 |
| 49 | (603.99050002) | 3 | $2,500.00 | $2,000.00 | $925.00 | $400.00 | |
| 50 | (603.99450005) | 650 | $20.00 | $150.00 | $60.00 | $58.00 | |
| 51 | (604.070501) | EACH | 24 | $1,200.00 | $2,300.00 | $3,400.00 | $2,892.00 |
| 52 | (604.070502) | EACH | 1 | $2,800.00 | $3,500.00 | $4,040.00 | $1,486.00 |
| 53 | (604.300103) | LF | 5 | $950.00 | $950.00 | $510.00 | $1,180.00 |
| 54 | (604.300671) | LF | 18 | $1,270.00 | $1,250.00 | $725.00 | $1,203.00 |
| 55 | (604.300673) | LF | 316 | $1,160.00 | $1,200.00 | $714.00 | $1,017.00 |
| 56 | (604.301003) | LF | 11 | $1,500.00 | $1,500.00 | $998.00 | $1,373.00 |
| 57 | (604.4048) | LF | 6 | $850.00 | $1,000.00 | $728.00 | $1,200.00 |
| 58 | (604.4060) | LF | 10 | $880.00 | $1,000.00 | $970.00 | $1,110.00 |
| 59 | Underdrain Filter, Type II (605.1001) | CY | 1,430 | $85.00 | $80.00 | $115.00 | $107.00 |
| 60 | (605.1701) | LF | 12,500 | $4.00 | $6.00 | $5.25 | $8.00 |
| 61 | (607.41010010) | 140 | $5.00 | $16.00 | $55.00 | $2.50 | |
| 62 | Concrete Sidewalks and Driveways (608.0101) | CY | 750 | $800.00 | $750.00 | $756.00 | $807.00 |
| 63 | (608.10080008) | 195 | $50.00 | $40.00 | $38.00 | $74.00 | |
| 64 | (608.21000003) | 31 | $500.00 | $600.00 | $550.00 | $565.00 | |
| 65 | (609.0401) | LF | 12,100 | $45.00 | $35.00 | $36.00 | $37.00 |
| 66 | Compost (610.10) | CY | 7 | $76.00 | $150.00 | $72.00 | $229.00 |
| 67 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 6 | $100.00 | $400.00 | $145.00 | $364.00 |
| 68 | (610.11040209) | 5 | $100.00 | $200.00 | $327.00 | $305.00 | |
| 69 | Topsoil - Roadside (610.1402) | CY | 1,220 | $90.00 | $5.00 | $151.00 | $95.00 |
| 70 | Turf Establishment -Lawns (610.1602) | SY | 6,939 | $2.00 | $0.50 | $2.20 | $0.50 |
| 71 | Watering Vegetation (610.19) | 1,000 GALLONS | 50 | $23.00 | $1.00 | $316.00 | $10.00 |
| 72 | (611.0151) | EACH | 6 | $1,050.00 | $1,400.00 | $992.00 | $1,185.00 |
| 73 | (611.0281) | EACH | 7 | $1,050.00 | $1,300.00 | $910.00 | $1,017.00 |
| 74 | (611.0412) | EACH | 15 | $105.00 | $200.00 | $92.00 | $300.00 |
| 75 | (611.0522) | EACH | 14 | $117.00 | $200.00 | $82.00 | $290.00 |
| 76 | Portable Drip Irrigation System (611.17) | EACH | 13 | $80.00 | $150.00 | $33.00 | $103.00 |
| 77 | (611.19010024) | 6 | $90.00 | $200.00 | $206.00 | $150.00 | |
| 78 | (611.19020024) | 7 | $65.00 | $200.00 | $185.00 | $150.00 | |
| 79 | (611.19040024) | 15 | $25.00 | $200.00 | $59.00 | $75.00 | |
| 80 | (611.19050024) | 14 | $5.00 | $200.00 | $62.00 | $75.00 | |
| 81 | (615.02010124) | 1 | $1,000.00 | $450.00 | $1,265.00 | $572.00 | |
| 82 | (615.02010224) | 1 | $1,000.00 | $450.00 | $1,535.00 | $572.00 | |
| 83 | (615.02030124) | 3 | $500.00 | $450.00 | $1,435.00 | $572.00 | |
| 84 | (615.99000110) | 8 | $1,000.00 | $1,300.00 | $1,295.00 | $1,676.00 | |
| 85 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $150,000 | $350,000 | $632,000 | $1,230,021 |
| 86 | (619.0901) | LF | 7,500 | $0.40 | $0.93 | $1.10 | $1.00 |
| 87 | (619.110513) | EACH | 6 | $8,000.00 | $8,000.00 | $3,285.00 | $10,000 |
| 88 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 30 | $150.00 | $1.00 | $11.00 | $5.00 |
| 89 | (621.51000015) | 285 | $10.00 | $22.00 | $26.00 | $18.00 | |
| 90 | Crushed Stone (In-Place Measure) (623.12) | CY | 220 | $80.00 | $112.00 | $132.00 | $75.00 |
| 91 | Survey Operations (625.01) | LS | 1 | $50,000 | $80,000 | $101,000 | $350,000 |
| 92 | (627.50140008) | 26,500 | $4.00 | $4.00 | $2.87 | $6.00 | |
| 93 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 19 | $46.00 | $275.00 | $463.00 | $50.00 |
| 94 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 19 | $65.00 | $200.00 | $150.00 | $50.00 |
| 95 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 19 | $70.00 | $125.00 | $97.00 | $50.00 |
| 96 | (634.35000011) | 6,000 | $7.00 | $3.75 | $3.78 | $3.50 | |
| 97 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,400.00 | $3,500.00 | $3,285.00 | $100.00 |
| 98 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 24 | $2,400.00 | $2,500.00 | $4,685.00 | $1,100.00 |
| 99 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 100 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 101 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 13,700 | $0.40 | $0.73 | $0.44 | $0.80 |
| 102 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 13,000 | $0.40 | $0.73 | $0.44 | $0.80 |
| 103 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 13,700 | $0.45 | $0.75 | $0.49 | $0.80 |
| 104 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 13,000 | $0.50 | $0.75 | $0.49 | $0.80 |
| 105 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 2 | $60.00 | $34.00 | $35.00 | $36.00 |
| 106 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,157 | $41.00 | $35.00 | $35.00 | $40.00 |
| 107 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 215 | $45.00 | $35.00 | $35.00 | $42.00 |
| 108 | Type A Sign Posts (645.81) | EACH | 171 | $200.00 | $192.50 | $192.00 | $220.00 |
| 109 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 14 | $1,500.00 | $1,200.00 | $1,200.00 | $1,322.00 |
| 110 | (645.81090003) | 50 | $70.00 | $72.00 | $71.00 | $79.00 | |
| 111 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 2 | $210.00 | $165.00 | $165.00 | $210.00 |
| 112 | Reference Marker Panel (646.21) | EACH | 14 | $50.00 | $38.00 | $38.00 | $42.00 |
| 113 | Steel Post, 2.0 lb/ft (646.32) | EACH | 7 | $90.00 | $82.00 | $82.00 | $90.00 |
| 114 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 2 | $70.00 | $28.00 | $112.00 | $60.00 |
| 115 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 94 | $58.00 | $44.00 | $30.00 | $45.00 |
| 116 | (647.83001002) | 14 | $22.00 | $28.00 | $50.00 | $20.00 | |
| 117 | Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704) | EACH | 4 | $65.00 | $2,300.00 | $2,800.00 | $2,800.00 |
| 118 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 66 | $1,800.00 | $2,600.00 | $2,950.00 | $3,150.00 |
| 119 | Welded Frame & Rectangular Grate 3 (655.1003) | EACH | 1 | $1,200.00 | $1,500.00 | $2,710.00 | $1,600.00 |
| 120 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 2 | $1,900.00 | $1,600.00 | $1,900.00 | $1,800.00 |
| 121 | Manhole Frame & Cover (655.1202) | EACH | 3 | $1,700.00 | $1,700.00 | $1,650.00 | $1,800.00 |
| 122 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 123 | (663.0408) | LF | 100 | $104.00 | $150.00 | $59.00 | $49.00 |
| 124 | (663.0412) | LF | 25 | $175.00 | $250.00 | $147.00 | $145.00 |
| 125 | (663.0603) | LF | 100 | $60.00 | $50.00 | $62.00 | $50.00 |
| 126 | (663.1206) | EACH | 1 | $2,294.00 | $2,750.00 | $3,600.00 | $1,450.00 |
| 127 | (663.1208) | EACH | 3 | $3,924.00 | $3,500.00 | $4,480.00 | $1,850.00 |
| 128 | (663.1212) | EACH | 1 | $6,530.00 | $6,000.00 | $6,860.00 | $3,000.00 |
| 129 | (663.1301) | EACH | 1 | $9,500.00 | $9,500.00 | $6,500.00 | $4,000.00 |
| 130 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 500 | $10.00 | $10.50 | $17.00 | $1.00 |
| 131 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 500 | $12.00 | $12.50 | $31.00 | $2.00 |
| 132 | (663.25010001) | LS | 1 | $300,000 | $300,000 | $300,000 | $300,000 |
| 133 | (663.2603) | EACH | 10 | $1,336.00 | $1,400.00 | $1,500.00 | $250.00 |
| 134 | Adjust Existing Valve Box Elevation (663.33) | EACH | 10 | $400.00 | $800.00 | $835.00 | $825.00 |
| 135 | (663.4108) | LF | 100 | $12.00 | $25.00 | $54.00 | $47.00 |
| 136 | (663.52000004) | 1 | $250.00 | $400.00 | $545.00 | $450.00 | |
| 137 | (670.0106) | EACH | 1 | $2,950.00 | $3,000.00 | $6,575.00 | $6,700.00 |
| 138 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $28.65 | $28.65 | $28.65 | $28.65 |
| 139 | (680.510201) | EACH | 11 | $1,900.00 | $2,400.00 | $2,465.00 | $1,622.00 |
| 140 | (680.520103) | LF | 25 | $22.00 | $15.00 | $15.00 | $16.00 |
| 141 | (680.520105) | LF | 1,548 | $30.00 | $30.00 | $16.50 | $28.00 |
| 142 | Single Span Wire Assembly (680.7001) | EACH | 1 | $2,900.00 | $4,000.00 | $3,013.00 | $4,270.00 |
| 143 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 1 | $1,500.00 | $1,000.00 | $1,095.00 | $1,800.00 |
| 144 | (680.730512) | LF | 50 | $6.00 | $12.00 | $7.65 | $10.00 |
| 145 | (680.730514) | LF | 537 | $5.00 | $8.00 | $5.50 | $7.00 |
| 146 | (680.77000001) | LS | 1 | $3,400.00 | $4,000.00 | $5,480.00 | $3,000.00 |
| 147 | (680.77000105) | 1 | $5,000.00 | $4,000.00 | $5,480.00 | $3,000.00 | |
| 148 | (680.78040005) | 2 | $2,700.00 | $2,200.00 | $3,285.00 | $1,550.00 | |
| 149 | (680.80620215) | 1 | $2,000.00 | $2,000.00 | $6,200.00 | $8,000.00 | |
| 150 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 6 | $120.00 | $250.00 | $165.00 | $100.00 |
| 151 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 6 | $220.00 | $250.00 | $275.00 | $140.00 |
| 152 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 4 | $480.00 | $350.00 | $822.00 | $670.00 |
| 153 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 1 | $590.00 | $500.00 | $1,650.00 | $2,000.00 |
| 154 | Traffic Signal Disconnect Hanger (680.8120) | EACH | 6 | $595.00 | $275.00 | $825.00 | $320.00 |
| 155 | Meter Pan (680.9402) | EACH | 1 | $1,800.00 | $1,100.00 | $1,095.00 | $1,353.00 |
| 156 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $1,350.00 | $1,100.00 | $1,095.00 | $1,353.00 |
| 157 | (680.950106) | LF | 136 | $5.00 | $7.00 | $3.30 | $7.00 |
| 158 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 3,200 | $2.60 | $5.40 | $5.50 | $6.00 |
| 159 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 1,700 | $2.60 | $5.40 | $5.50 | $6.00 |
| 160 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 33 | $240.00 | $325.00 | $330.00 | $340.00 |
| 161 | Field Change Payment (FCP) (697.03) | DOL | 370,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 162 | Asphalt Price Adjustment (698.04) | DOL | 12,305 | $1.00 | $1.00 | $1.00 | $1.00 |
| 163 | Fuel Price Adjustment (698.05) | DOL | 16,505 | $1.00 | $1.00 | $1.00 | $1.00 |
| 164 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 165 | Mobilization (699.040001) | LS | 1 | $326,532 | $327,904 | $318,098 | $415,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 5, 2026. Compiled by Mirage Metrics.