NYSDOT contract D265546 bid tabulation
TRAFFIC SIGNAL REPLACEMENTS; SFY 25/26 - CITY OF BUFFALO. Let by New York State DOT on August 21, 2025, Erie, Region 05. 3 bids received; low bid $3,357,101 by McLaughlin Construction Corp/DBA Edbauer Construction.
- Owner
- New York State DOT
- Letting
- 21 AUG 2025
- Pay items
- 124
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McLaughlin Construction Corp/DBA Edbauer Construction | $3,357,101 | Low |
| 2 | Millennium Construction Inc | $3,847,000 | +15% |
| 3 | Concrete Applied Technologies Corp/DBA:Catco | $3,882,323 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McLaughlin Construction Corp/DBA Edbauer Construction | 2. Millennium Construction Inc | 3. Concrete Applied Technologies Corp/DBA:Catco |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $5,000.00 | $5,000.00 | $10,000 |
| 2 | (205.0201) | LS | 1 | $100.00 | $500.00 | $2,500.00 |
| 3 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $10.00 | $100.00 | $114.00 |
| 4 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $10.00 | $250.00 | $300.00 |
| 5 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $20.00 | $250.00 | $200.00 |
| 6 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $5.00 | $100.00 | $60.00 |
| 7 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $5.00 | $100.00 | $30.00 |
| 8 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $5.00 | $100.00 | $100.00 |
| 9 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $10.00 | $100.00 | $110.00 |
| 10 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $12.00 | $100.00 | $100.00 |
| 11 | (205.050201) | TON | 24 | $25.00 | $100.00 | $100.00 |
| 12 | (206.03050005) | 2,172 | $84.00 | $92.00 | $100.00 | |
| 13 | (206.03060005) | 1,771 | $40.00 | $44.00 | $55.00 | |
| 14 | Test Pit Excavation (206.05) | EACH | 34 | $2,000.00 | $1,000.00 | $2,000.00 |
| 15 | (608.01060415) | 6,337 | $25.50 | $53.50 | $30.00 | |
| 16 | (608.01060615) | 34 | $54.00 | $53.50 | $40.00 | |
| 17 | (608.01070415) | 6,566 | $51.00 | $53.50 | $45.00 | |
| 18 | (608.01070615) | 67 | $62.00 | $53.50 | $60.00 | |
| 19 | (608.03040008) | 17 | $75.00 | $500.00 | $300.00 | |
| 20 | (608.21000003) | 3 | $634.00 | $625.00 | $600.00 | |
| 21 | (609.10010109) | 366 | $165.00 | $120.00 | $150.00 | |
| 22 | (609.10010309) | 274 | $239.00 | $225.00 | $160.00 | |
| 23 | (618.78100115) | 1 | $3,992.00 | $7,500.00 | $3,000.00 | |
| 24 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 96 | $10.00 | $76.50 | $10.00 |
| 25 | Survey Operations (625.01) | LS | 1 | $51,000 | $15,835 | $98,000 |
| 26 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 17 | $375.00 | $550.00 | $350.00 |
| 27 | (635.01030011) | 31,189 | $1.34 | $1.55 | $1.38 | |
| 28 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $100.00 | $2,500.00 | $3,500.00 |
| 29 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 156 | $53.00 | $40.00 | $54.00 |
| 30 | Overhead Sign Panels (645.61) | SF | 643 | $33.00 | $118.00 | $70.00 |
| 31 | Type A Sign Posts (645.81) | EACH | 11 | $342.00 | $211.00 | $348.00 |
| 32 | (645.81090003) | 8 | $184.00 | $93.00 | $187.00 | |
| 33 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 20 | $398.00 | $186.00 | $404.00 |
| 34 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $1,036.00 | $186.00 | $195.00 |
| 35 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 36 | (662.60000208) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 37 | (662.60000308) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 38 | (662.60000408) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 39 | (662.60000508) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 40 | (662.60000608) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 41 | (662.60000708) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 42 | (662.60000808) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 43 | (662.61060008) | 4 | $2,500.00 | $2,500.00 | $2,500.00 | |
| 44 | (670.1530) | EACH | 4 | $2,926.00 | $3,200.00 | $3,000.00 |
| 45 | (670.1706) | EACH | 4 | $910.00 | $1,000.00 | $1,100.00 |
| 46 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 4 | $820.00 | $900.00 | $1,150.00 |
| 47 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $5.57 | $5.57 | $5.57 |
| 48 | (680.05010007) | 8 | $22,210 | $24,200 | $23,000 | |
| 49 | (680.05020007) | 8 | $3,930.00 | $4,300.00 | $4,800.00 | |
| 50 | (680.11120814) | 10 | $7,810.00 | $8,500.00 | $7,600.00 | |
| 51 | (680.11131014) | 21 | $4,870.00 | $5,790.00 | $6,800.00 | |
| 52 | Pole Excavation and Concrete Foundation (680.5001) | CY | 92 | $2,450.00 | $2,605.00 | $3,500.00 |
| 53 | Concrete Base for Controller Cabinet (680.5002) | EACH | 8 | $4,943.00 | $5,390.00 | $3,600.00 |
| 54 | (680.50500005) | 40 | $342.00 | $375.00 | $10.00 | |
| 55 | (680.510201) | EACH | 8 | $2,052.00 | $2,550.00 | $2,100.00 |
| 56 | (680.510301) | EACH | 38 | $2,150.00 | $2,615.00 | $2,400.00 |
| 57 | (680.520105) | LF | 100 | $27.00 | $31.50 | $31.50 |
| 58 | (680.520506) | LF | 451 | $11.00 | $13.00 | $15.00 |
| 59 | (680.520508) | LF | 8,415 | $5.40 | $6.00 | $16.50 |
| 60 | (680.622025) | EACH | 1 | $9,826.00 | $17,400 | $12,900 |
| 61 | (680.622027) | EACH | 1 | $10,113 | $1,760.00 | $13,000 |
| 62 | (680.622033) | EACH | 2 | $11,947 | $18,400 | $15,750 |
| 63 | (680.622034) | EACH | 1 | $12,123 | $18,450 | $15,900 |
| 64 | (680.622035) | EACH | 1 | $12,768 | $18,500 | $16,100 |
| 65 | (680.622041) | EACH | 2 | $16,194 | $23,000 | $17,750 |
| 66 | (680.622042) | EACH | 1 | $16,318 | $23,000 | $18,750 |
| 67 | (680.622043) | EACH | 1 | $16,722 | $23,000 | $18,760 |
| 68 | (680.622044) | EACH | 2 | $17,028 | $23,100 | $17,500 |
| 69 | (680.622045) | EACH | 1 | $17,277 | $23,100 | $19,500 |
| 70 | (680.622047) | EACH | 1 | $17,433 | $23,350 | $19,900 |
| 71 | (680.622048) | EACH | 1 | $17,596 | $23,400 | $19,900 |
| 72 | (680.622049) | EACH | 2 | $17,943 | $23,500 | $18,650 |
| 73 | (680.622050) | EACH | 2 | $23,553 | $23,500 | $19,000 |
| 74 | (680.622051) | EACH | 3 | $23,742 | $27,100 | $20,700 |
| 75 | (680.622053) | EACH | 1 | $24,127 | $27,200 | $21,000 |
| 76 | (680.622056) | EACH | 1 | $24,564 | $27,400 | $24,100 |
| 77 | (680.622058) | EACH | 2 | $26,534 | $27,400 | $24,000 |
| 78 | (680.622059) | EACH | 1 | $26,789 | $27,500 | $24,200 |
| 79 | (680.622060) | EACH | 2 | $27,930 | $28,500 | $24,800 |
| 80 | (680.632050) | EACH | 1 | $30,820 | $35,650 | $27,500 |
| 81 | (680.671002) | EACH | 1 | $1,800.00 | $2,000.00 | $7,000.00 |
| 82 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 2 | $1,624.00 | $1,775.00 | $1,100.00 |
| 83 | (680.730514) | LF | 20,675 | $2.38 | $2.70 | $7.95 |
| 84 | (680.730714) | LF | 2,933 | $3.70 | $4.00 | $6.00 |
| 85 | (680.78010005) | 4 | $1,050.00 | $1,165.00 | $1,000.00 | |
| 86 | (680.78040005) | 2 | $2,518.00 | $2,750.00 | $2,500.00 | |
| 87 | (680.79000105) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 88 | (680.79000205) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 89 | (680.79000305) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 90 | (680.79000405) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 91 | (680.79000505) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 92 | (680.79000605) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 93 | (680.79000705) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 94 | (680.79000805) | 1 | $4,040.00 | $4,400.00 | $4,000.00 | |
| 95 | (680.80324515) | 8 | $2,040.00 | $2,235.00 | $3,700.00 | |
| 96 | (680.80324708) | 8 | $1,120.00 | $1,225.00 | $1,600.00 | |
| 97 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 69 | $62.00 | $67.50 | $125.00 |
| 98 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 15 | $71.00 | $77.50 | $125.00 |
| 99 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 69 | $67.00 | $74.00 | $125.00 |
| 100 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 29 | $78.00 | $87.00 | $125.00 |
| 101 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 69 | $55.00 | $62.50 | $125.00 |
| 102 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 20 | $79.00 | $89.00 | $125.00 |
| 103 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 271 | $107.00 | $120.00 | $140.00 |
| 104 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 84 | $750.00 | $820.00 | $400.00 |
| 105 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 18 | $142.00 | $160.00 | $250.00 |
| 106 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 36 | $175.00 | $195.00 | $260.00 |
| 107 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 18 | $182.00 | $200.00 | $300.00 |
| 108 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 18 | $182.00 | $200.00 | $270.00 |
| 109 | (680.8151) | EACH | 18 | $1,534.00 | $1,675.00 | $1,100.00 |
| 110 | Backplates for Traffic Signal Heads (680.8199) | EACH | 83 | $134.00 | $150.00 | $230.00 |
| 111 | (680.8205) | EACH | 31 | $539.00 | $590.00 | $875.00 |
| 112 | (680.82250801) | 77 | $238.00 | $265.00 | $375.00 | |
| 113 | Meter Pan (680.9402) | EACH | 2 | $1,632.00 | $1,780.00 | $750.00 |
| 114 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 2 | $1,435.00 | $1,570.00 | $550.00 |
| 115 | (680.950106) | LF | 1,265 | $5.22 | $5.70 | $4.00 |
| 116 | (680.95110001) | 2 | $10,498 | $11,425 | $9,000.00 | |
| 117 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 |
| 118 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 27,292 | $4.00 | $4.65 | $4.13 |
| 119 | White Preformed Reflectorized Pavement Stripes (688.01) | LF | 9,898 | $4.00 | $4.65 | $4.13 |
| 120 | Field Change Payment (FCP) (697.03) | DOL | 149,000 | $1.00 | $1.00 | $1.00 |
| 121 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 122 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 123 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 124 | Mobilization (699.040001) | LS | 1 | $128,000 | $140,970 | $148,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 21, 2025. Compiled by Mirage Metrics.