NYSDOT contract D265487 bid tabulation
ADA Compliance and Signal Upgrades. Let by New York State DOT on April 10, 2025, Erie, Niagara, Region 05. 2 bids received; low bid $1,957,819 by Concrete Applied Technologies Corp/DBA:Catco.
- Owner
- New York State DOT
- Letting
- 10 APR 2025
- Pay items
- 79
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Applied Technologies Corp/DBA:Catco | $1,957,819 | Low |
| 2 | McLaughlin Construction Corp/DBA Edbauer Construction | $2,129,378 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Applied Technologies Corp/DBA:Catco | 2. McLaughlin Construction Corp/DBA Edbauer Construction |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $5,000.00 | $5,000.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 220 | $175.00 | $155.00 |
| 3 | (205.0201) | LS | 1 | $2,500.00 | $100.00 |
| 4 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $116.00 | $10.00 |
| 5 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $290.00 | $10.00 |
| 6 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $205.00 | $10.00 |
| 7 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $60.00 | $10.00 |
| 8 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $30.00 | $10.00 |
| 9 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $100.00 | $10.00 |
| 10 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $115.00 | $10.00 |
| 11 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $99.00 | $10.00 |
| 12 | (205.050201) | TON | 24 | $78.00 | $100.00 |
| 13 | (206.03060005) | 317 | $50.00 | $41.00 | |
| 14 | Seed and Mulch – Temporary (209.1003) | SY | 136 | $1.00 | $0.01 |
| 15 | Subbase Course, Type 2 (304.12) | CY | 114 | $175.00 | $125.00 |
| 16 | (601.01110001) | 506 | $80.00 | $57.00 | |
| 17 | (604.070501) | EACH | 1 | $3,500.00 | $2,000.00 |
| 18 | Concrete Sidewalks and Driveways (608.0101) | CY | 56 | $1,400.00 | $1,038.00 |
| 19 | (608.01060415) | 3,435 | $42.00 | $40.00 | |
| 20 | (608.01060615) | 435 | $45.00 | $55.00 | |
| 21 | (608.01070415) | 10,000 | $45.00 | $40.00 | |
| 22 | (608.01070615) | 165 | $60.00 | $40.00 | |
| 23 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 23 | $500.00 | $700.00 |
| 24 | (608.03040008) | 27 | $350.00 | $120.00 | |
| 25 | (608.21000003) | 19 | $500.00 | $615.00 | |
| 26 | (609.10010109) | 2,585 | $130.00 | $176.00 | |
| 27 | Fertilizer (610.0501) | LB | 25 | $10.00 | $8.00 |
| 28 | Topsoil - Roadside (610.1402) | CY | 44 | $200.00 | $130.00 |
| 29 | Turf Establishment -Lawns (610.1602) | SY | 215 | $10.00 | $0.01 |
| 30 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $183,000 | $226,313 |
| 31 | Type III Construction Barricades (619.04) | EACH | 8 | $250.00 | $250.00 |
| 32 | (619.100101) | LF | 7,070 | $0.10 | $0.50 |
| 33 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 72 | $1.00 | $11.00 |
| 34 | Survey Operations (625.01) | LS | 1 | $60,000 | $18,000 |
| 35 | (625.09010015) | LS | 1 | $100.00 | $0.01 |
| 36 | (627.50140008) | 110 | $10.00 | $20.00 | |
| 37 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 8,585 | $3.75 | $3.50 |
| 38 | (635.01030011) | 10,630 | $0.10 | $4.20 | |
| 39 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 15 | $2,500.00 | $1,700.00 |
| 40 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 |
| 41 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 2,460 | $2.75 | $2.58 |
| 42 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,240 | $2.75 | $2.58 |
| 43 | White Paint Reflectorized Pavement Symbols - 20 mils (640.23) | EACH | 33 | $250.00 | $232.00 |
| 44 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 18 | $59.00 | $58.00 |
| 45 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 649 | $38.00 | $37.00 |
| 46 | Type A Sign Posts (645.81) | EACH | 99 | $225.00 | $220.00 |
| 47 | (645.81090003) | 107 | $77.00 | $84.00 | |
| 48 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 36 | $10.00 | $8.00 |
| 49 | Adjust Existing Valve Box Elevation (663.33) | EACH | 3 | $600.00 | $570.00 |
| 50 | (680.11120814) | 1 | $9,975.00 | $19,700 | |
| 51 | (680.11131014) | 18 | $6,750.00 | $12,850 | |
| 52 | (680.50500005) | 13 | $1.00 | $10.00 | |
| 53 | (680.51000105) | 4 | $800.00 | $770.00 | |
| 54 | (680.520506) | LF | 317 | $20.00 | $15.00 |
| 55 | (680.730514) | LF | 2,901 | $5.50 | $5.00 |
| 56 | (680.77000105) | 1 | $1,500.00 | $1,550.00 | |
| 57 | (680.77000205) | 1 | $1,500.00 | $2,570.00 | |
| 58 | (680.77000305) | 1 | $1,500.00 | $3,100.00 | |
| 59 | (680.77000405) | 1 | $1,500.00 | $1,028.00 | |
| 60 | (680.77000505) | 1 | $1,500.00 | $3,100.00 | |
| 61 | (680.77000605) | 1 | $1,500.00 | $2,570.00 | |
| 62 | (680.78010005) | 13 | $750.00 | $470.00 | |
| 63 | (680.79000105) | 1 | $2,500.00 | $1,550.00 | |
| 64 | (680.79000205) | 1 | $2,500.00 | $2,570.00 | |
| 65 | (680.79000305) | 1 | $2,500.00 | $3,100.00 | |
| 66 | (680.79000505) | 1 | $2,500.00 | $4,110.00 | |
| 67 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 1 | $500.00 | $283.00 |
| 68 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 2 | $500.00 | $275.00 |
| 69 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 1 | $500.00 | $411.00 |
| 70 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 1 | $500.00 | $300.00 |
| 71 | (680.8151) | EACH | 2 | $1,500.00 | $925.00 |
| 72 | (680.82250801) | 15 | $500.00 | $514.00 | |
| 73 | (680.83010005) | 991 | $1.00 | $3.60 | |
| 74 | White Preformed Reflectorized Pavement Stripes (688.01) | LF | 3,885 | $3.60 | $3.40 |
| 75 | Field Change Payment (FCP) (697.03) | DOL | 69,000 | $1.00 | $1.00 |
| 76 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 |
| 77 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 |
| 78 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 79 | Mobilization (699.040001) | LS | 1 | $70,000 | $81,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of April 10, 2025. Compiled by Mirage Metrics.