NYSDOT contract D265673 bid tabulation
PAVEMENT RESURFACING - Mill & Overlay of NY 954D. Let by New York State DOT on January 8, 2026, Erie, Region 05. 1 bid received; low bid $10,523,301 by Concrete Applied Technologies Corp/DBA:Catco.
- Owner
- New York State DOT
- Letting
- 08 JAN 2026
- Pay items
- 237
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Applied Technologies Corp/DBA:Catco | $10,523,301 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Applied Technologies Corp/DBA:Catco |
|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $40,000 |
| 2 | Embankment In Place (203.03) | CY | 1 | $500.00 |
| 3 | Select Granular Fill (203.07) | CY | 38 | $300.00 |
| 4 | (205.0201) | LS | 1 | $100.00 |
| 5 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $120.00 |
| 6 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $280.00 |
| 7 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $200.00 |
| 8 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $60.00 |
| 9 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $30.00 |
| 10 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $100.00 |
| 11 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $113.00 |
| 12 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $98.00 |
| 13 | (205.050201) | TON | 24 | $120.00 |
| 14 | Trench and Culvert Excavation (206.0201) | CY | 68 | $265.00 |
| 15 | (206.03050005) | 3,194 | $160.00 | |
| 16 | (206.03060005) | 3,308 | $75.00 | |
| 17 | Test Pit Excavation (206.05) | EACH | 116 | $50.00 |
| 18 | Subbase Course, Type 2 (304.12) | CY | 6 | $400.00 |
| 19 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 |
| 20 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 202 | $105.00 |
| 21 | (404.0962) | TON | 4,126 | $170.00 |
| 22 | (404.0982) | TON | 376 | $350.00 |
| 23 | (404.1289) | TON | 2 | $1,500.00 |
| 24 | (404.3789) | TON | 7 | $500.00 |
| 25 | Diluted Tack Coat (407.0102) | GAL | 5,369 | $5.00 |
| 26 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 50,809 | $0.05 |
| 27 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 52,184 | $4.50 |
| 28 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,754 | $20.00 |
| 29 | Shields and Shoring (552.17) | SF | 1,189 | $1.00 |
| 30 | (601.01000018) | 238 | $150.00 | |
| 31 | (603.6102) | LF | 12 | $325.00 |
| 32 | Concrete Collars (603.77) | EACH | 4 | $2,000.00 |
| 33 | (603.9812) | LF | 8 | $300.00 |
| 34 | (604.070501) | EACH | 10 | $500.00 |
| 35 | (604.070502) | EACH | 2 | $1,000.00 |
| 36 | (604.300673) | LF | 6 | $1,800.00 |
| 37 | (604.4072) | LF | 8 | $2,000.00 |
| 38 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $105.00 |
| 39 | (608.01010205) | 30 | $100.00 | |
| 40 | (608.01060415) | 8,397 | $42.00 | |
| 41 | (608.01070415) | 9,486 | $50.00 | |
| 42 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 3 | $2,000.00 |
| 43 | (608.21000003) | 19 | $600.00 | |
| 44 | (609.10010309) | 626 | $275.00 | |
| 45 | Compost (610.10) | CY | 22 | $184.00 |
| 46 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 3 | $186.00 |
| 47 | Weed Removal (610.13) | SY | 22 | $100.00 |
| 48 | Topsoil - Roadside (610.1402) | CY | 26 | $200.00 |
| 49 | Turf Establishment -Lawns (610.1602) | SY | 172 | $10.00 |
| 50 | Watering Vegetation (610.19) | 1,000 GALLONS | 29 | $200.00 |
| 51 | (611.0151) | EACH | 20 | $1,700.00 |
| 52 | (611.0281) | EACH | 23 | $1,500.00 |
| 53 | (611.0432) | EACH | 30 | $200.00 |
| 54 | Portable Drip Irrigation System (611.17) | EACH | 43 | $90.00 |
| 55 | (611.19010024) | 20 | $61.00 | |
| 56 | (611.19020024) | 23 | $51.00 | |
| 57 | (611.19040024) | 30 | $22.00 | |
| 58 | Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411) | EACH | 14 | $500.00 |
| 59 | Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421) | EACH | 7 | $600.00 |
| 60 | (614.060104) | EACH | 6 | $700.00 |
| 61 | (614.060204) | EACH | 1 | $800.00 |
| 62 | (614.060304) | EACH | 1 | $1,600.00 |
| 63 | (614.060404) | EACH | 1 | $3,000.00 |
| 64 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 5 | $1,000.00 |
| 65 | Tree Root Zone Treatment (Vertical Mulching/Aeration) (614.08) | SY | 39 | $95.00 |
| 66 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $800,000 |
| 67 | Type III Construction Barricades (619.04) | EACH | 1,314 | $5.00 |
| 68 | (619.100101) | LF | 4,973 | $1.50 |
| 69 | (619.111113) | EACH | 7 | $15,000 |
| 70 | (619.130201) | EACH | 1 | $1.00 |
| 71 | (619.130202) | EACH | 1 | $1.00 |
| 72 | (619.130203) | EACH | 1 | $1.00 |
| 73 | (619.130204) | EACH | 1 | $1.00 |
| 74 | (619.130205) | EACH | 1 | $1.00 |
| 75 | (619.130206) | EACH | 1 | $1.00 |
| 76 | (619.130207) | EACH | 1 | $1.00 |
| 77 | (619.130208) | EACH | 1 | $1.00 |
| 78 | (619.130209) | EACH | 1 | $1.00 |
| 79 | (619.130210) | EACH | 1 | $1.00 |
| 80 | (619.130211) | EACH | 1 | $1.00 |
| 81 | (619.130212) | EACH | 1 | $1.00 |
| 82 | (619.130213) | EACH | 1 | $1.00 |
| 83 | (619.130214) | EACH | 1 | $1.00 |
| 84 | (619.130215) | EACH | 1 | $1.00 |
| 85 | (619.130216) | EACH | 1 | $1.00 |
| 86 | (619.130217) | EACH | 1 | $1.00 |
| 87 | (619.130218) | EACH | 1 | $1.00 |
| 88 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 360 | $20.00 |
| 89 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $10,000 |
| 90 | Pavement Patching (Tonnage) (619.2602) | TON | 24 | $1,500.00 |
| 91 | Cleaning Closed Drainage Systems (621.03) | LF | 9,899 | $3.50 |
| 92 | Cleaning Drainage Structures (621.04) | EACH | 163 | $154.00 |
| 93 | Survey Operations (625.01) | LS | 1 | $200,000 |
| 94 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 25 | $400.00 |
| 95 | (627.50140008) | 61 | $20.00 | |
| 96 | Cleaning, Sealing and/or Filling Cracks (633.12) | LS | 1 | $1,000.00 |
| 97 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 126 | $150.00 |
| 98 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 285 | $100.00 |
| 99 | (635.01030011) | 4,125 | $1.93 | |
| 100 | (635.03030011) | 1 | $223.00 | |
| 101 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,500.00 |
| 102 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 17 | $2,500.00 |
| 103 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 |
| 104 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 |
| 105 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 12,991 | $0.44 |
| 106 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 9,004 | $0.44 |
| 107 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 177 | $38.00 |
| 108 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 2,333 | $44.00 |
| 109 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 37 | $41.00 |
| 110 | Overhead Sign Panels (645.61) | SF | 638 | $85.00 |
| 111 | Type A Sign Posts (645.81) | EACH | 396 | $276.00 |
| 112 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 6 | $1,388.00 |
| 113 | (645.81090003) | 110 | $84.00 | |
| 114 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 47 | $182.00 |
| 115 | Reference Marker Panel (646.21) | EACH | 21 | $45.00 |
| 116 | Steel Post, 2.0 lb/ft (646.32) | EACH | 21 | $68.00 |
| 117 | Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25) | EACH | 25 | $200.00 |
| 118 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $149.00 |
| 119 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 127 | $40.00 |
| 120 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 166 | $48.00 |
| 121 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 2 | $96.00 |
| 122 | (647.83001002) | 41 | $12.00 | |
| 123 | (655.05010010) | 17 | $3,500.00 | |
| 124 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 2 | $3,200.00 |
| 125 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 1 | $1,500.00 |
| 126 | (662.60000108) | 2,500 | $1.00 | |
| 127 | (662.60000208) | 2,500 | $1.00 | |
| 128 | (662.60000308) | 2,500 | $1.00 | |
| 129 | (662.60000408) | 2,500 | $1.00 | |
| 130 | (662.60000508) | 2,500 | $1.00 | |
| 131 | (662.60000608) | 2,500 | $1.00 | |
| 132 | (662.60000708) | 2,500 | $1.00 | |
| 133 | (662.61060008) | 12 | $3,500.00 | |
| 134 | Adjust Existing Valve Box Elevation (663.33) | EACH | 2 | $1,000.00 |
| 135 | (670.0112) | EACH | 12 | $6,000.00 |
| 136 | (670.1530) | EACH | 12 | $2,600.00 |
| 137 | (670.1706) | EACH | 12 | $2,500.00 |
| 138 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 12 | $1,500.00 |
| 139 | (670.7007) | LF | 572 | $6.50 |
| 140 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $5.57 |
| 141 | (680.05010007) | 18 | $27,000 | |
| 142 | (680.05020007) | 19 | $6,700.00 | |
| 143 | (680.05040004) | 1 | $4,000.00 | |
| 144 | (680.11120814) | 39 | $10,500 | |
| 145 | (680.11131014) | 36 | $7,000.00 | |
| 146 | Pole Excavation and Concrete Foundation (680.5001) | CY | 122 | $3,500.00 |
| 147 | Concrete Base for Controller Cabinet (680.5002) | EACH | 15 | $3,000.00 |
| 148 | (680.50500005) | 98 | $1.00 | |
| 149 | (680.510201) | EACH | 15 | $2,200.00 |
| 150 | (680.510301) | EACH | 79 | $2,500.00 |
| 151 | (680.520105) | LF | 224 | $30.00 |
| 152 | (680.520506) | LF | 1,097 | $12.00 |
| 153 | (680.520508) | LF | 13,051 | $28.00 |
| 154 | (680.621731) | EACH | 1 | $13,000 |
| 155 | (680.622019) | EACH | 1 | $11,900 |
| 156 | (680.622023) | EACH | 1 | $11,900 |
| 157 | (680.622026) | EACH | 1 | $12,100 |
| 158 | (680.622033) | EACH | 1 | $12,900 |
| 159 | (680.622034) | EACH | 2 | $12,900 |
| 160 | (680.622035) | EACH | 1 | $13,100 |
| 161 | (680.622037) | EACH | 1 | $14,000 |
| 162 | (680.622039) | EACH | 2 | $14,000 |
| 163 | (680.622041) | EACH | 2 | $14,000 |
| 164 | (680.622042) | EACH | 1 | $15,290 |
| 165 | (680.622044) | EACH | 1 | $15,400 |
| 166 | (680.622045) | EACH | 1 | $16,170 |
| 167 | (680.622046) | EACH | 2 | $16,170 |
| 168 | (680.622047) | EACH | 2 | $16,830 |
| 169 | (680.622053) | EACH | 1 | $27,000 |
| 170 | (680.622056) | EACH | 1 | $28,500 |
| 171 | (680.622057) | EACH | 1 | $29,000 |
| 172 | (680.632049) | EACH | 2 | $23,000 |
| 173 | (680.632050) | EACH | 1 | $24,000 |
| 174 | (680.632054) | EACH | 1 | $27,000 |
| 175 | (680.632055) | EACH | 2 | $28,000 |
| 176 | (680.632059) | EACH | 2 | $29,000 |
| 177 | (680.6712) | EACH | 1 | $2,000.00 |
| 178 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 3 | $1,200.00 |
| 179 | (680.730514) | LF | 29,704 | $5.95 |
| 180 | (680.730714) | LF | 281 | $10.00 |
| 181 | (680.78010005) | 15 | $1,000.00 | |
| 182 | (680.78020005) | 1 | $1,000.00 | |
| 183 | (680.78040005) | 16 | $4,000.00 | |
| 184 | (680.79000105) | 1 | $9,000.00 | |
| 185 | (680.79000205) | 1 | $9,000.00 | |
| 186 | (680.79000305) | 1 | $9,000.00 | |
| 187 | (680.79000405) | 1 | $9,000.00 | |
| 188 | (680.79000505) | 1 | $9,000.00 | |
| 189 | (680.79000605) | 1 | $9,000.00 | |
| 190 | (680.79000705) | 1 | $9,000.00 | |
| 191 | (680.79000805) | 1 | $9,000.00 | |
| 192 | (680.79000905) | 1 | $9,000.00 | |
| 193 | (680.79001005) | 1 | $9,000.00 | |
| 194 | (680.79001105) | 1 | $9,000.00 | |
| 195 | (680.79001205) | 1 | $9,000.00 | |
| 196 | (680.79001305) | 1 | $9,000.00 | |
| 197 | (680.79001405) | 1 | $9,000.00 | |
| 198 | (680.79001505) | 1 | $9,000.00 | |
| 199 | (680.79001605) | 1 | $9,000.00 | |
| 200 | (680.79001705) | 1 | $9,000.00 | |
| 201 | (680.79001805) | 1 | $9,000.00 | |
| 202 | (680.80324515) | 15 | $5,000.00 | |
| 203 | (680.80324708) | 15 | $2,300.00 | |
| 204 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 98 | $175.00 |
| 205 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 1 | $175.00 |
| 206 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 98 | $175.00 |
| 207 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 2 | $175.00 |
| 208 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 98 | $175.00 |
| 209 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 1 | $225.00 |
| 210 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 298 | $300.00 |
| 211 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 99 | $450.00 |
| 212 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 8 | $270.00 |
| 213 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 16 | $275.00 |
| 214 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 6 | $350.00 |
| 215 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 2 | $400.00 |
| 216 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 8 | $260.00 |
| 217 | (680.8151) | EACH | 8 | $1,200.00 |
| 218 | Backplates for Traffic Signal Heads (680.8199) | EACH | 99 | $260.00 |
| 219 | (680.8205) | EACH | 93 | $1,000.00 |
| 220 | Breakaway Transformer Base (680.8223) | EACH | 1 | $1,500.00 |
| 221 | (680.82250801) | 99 | $700.00 | |
| 222 | Meter Pan (680.9402) | EACH | 4 | $1,000.00 |
| 223 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 13 | $1,500.00 |
| 224 | (680.950106) | LF | 1,639 | $4.00 |
| 225 | (680.95110001) | 5 | $16,500 | |
| 226 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $15.00 |
| 227 | (685.07200910) | 32 | $193.00 | |
| 228 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 15,457 | $1.87 |
| 229 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 9,166 | $1.87 |
| 230 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 89,288 | $3.52 |
| 231 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 112 | $82.50 |
| 232 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 136 | $302.00 |
| 233 | Field Change Payment (FCP) (697.03) | DOL | 440,000 | $1.00 |
| 234 | Asphalt Price Adjustment (698.04) | DOL | 12,043 | $1.00 |
| 235 | Fuel Price Adjustment (698.05) | DOL | 3,102 | $1.00 |
| 236 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 |
| 237 | Mobilization (699.040001) | LS | 1 | $400,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.