NYSDOT contract D265789 bid tabulation
NY-26 - Mill & Resurface with Rehab of CIN 530053. Let by New York State DOT on May 7, 2026, Erie, Region 05. 2 bids received; low bid $5,248,142 by Concrete Applied Technologies Corp/DBA:Catco.
- Owner
- New York State DOT
- Letting
- 07 MAY 2026
- Pay items
- 157
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Applied Technologies Corp/DBA:Catco | $5,248,142 | Low |
| 2 | Occhino Corp | $5,363,383 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Applied Technologies Corp/DBA:Catco | 2. Occhino Corp |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $13,000 | $14,292 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 68 | $150.00 | $88.78 |
| 3 | Trench and Culvert Excavation (206.0201) | CY | 80 | $80.00 | $96.50 |
| 4 | (206.03060005) | 139 | $170.00 | $57.75 | |
| 5 | Seed and Mulch – Temporary (209.1003) | SY | 91 | $2.00 | $12.03 |
| 6 | Stabilized Construction Access (209.22) | SY | 955 | $30.00 | $51.89 |
| 7 | (209.23010009) | 800 | $8.00 | $6.22 | |
| 8 | (304.15010005) | 45 | $230.00 | $80.63 | |
| 9 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 | $105.00 |
| 10 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 362 | $105.00 | $105.00 |
| 11 | (406.0962) | TON | 9,555 | $135.00 | $116.04 |
| 12 | Diluted Tack Coat (407.0102) | GAL | 10,772 | $5.00 | $5.33 |
| 13 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 88,096 | $0.02 | $0.42 |
| 14 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 105,793 | $3.00 | $3.09 |
| 15 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,919 | $14.00 | $12.43 |
| 16 | (553.030001) | EACH | 1 | $1,000.00 | $40,000 |
| 17 | (574.030001) | SF | 42 | $220.00 | $220.00 |
| 18 | Structural Paving of Inverts with Portland Cement Concrete (602.2002) | SF | 3,630 | $100.00 | $88.00 |
| 19 | (604.070501) | EACH | 25 | $900.00 | $1,453.30 |
| 20 | (604.070502) | EACH | 30 | $3,000.00 | $6,030.05 |
| 21 | (604.070503) | EACH | 9 | $4,000.00 | $7,093.44 |
| 22 | (604.070504) | EACH | 2 | $6,000.00 | $13,618 |
| 23 | (604.070505) | EACH | 2 | $8,000.00 | $8,383.63 |
| 24 | Box Beam Guide Railing (606.10) | LF | 1,128 | $68.00 | $97.68 |
| 25 | Box Beam Median Barrier (606.11) | LF | 1,362 | $95.00 | $117.04 |
| 26 | Box Beam Median Barrier (Shop Bent or Shop Mitered) (606.110002) | LF | 366 | $105.00 | $209.00 |
| 27 | Box Beam End Piece (606.120101) | EACH | 3 | $1,000.00 | $1,020.80 |
| 28 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $6,500.00 | $7,480.00 |
| 29 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $9,500.00 | $7,370.00 |
| 30 | Box Beam Median Barrier End Assembly, Type A (606.1401) | EACH | 1 | $2,700.00 | $10,340 |
| 31 | Box Beam Median Barrier End Assembly, Type C (606.1403) | EACH | 3 | $11,000 | $10,890 |
| 32 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 320 | $7.00 | $9.79 |
| 33 | Removing and Disposing Corrugated Beam Median Barrier (606.72) | LF | 2,506 | $7.00 | $6.05 |
| 34 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 440 | $8.00 | $17.60 |
| 35 | Removing and Disposing Concrete Barrier (606.75) | LF | 44 | $75.00 | $100.00 |
| 36 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 6 | $800.00 | $4,665.15 |
| 37 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $800.00 | $4,000.00 |
| 38 | Transition Between Box Beam Median Barrier and Single Slope Concrete Median Barrier (606.8805) | EACH | 2 | $17,000 | $29,480 |
| 39 | Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001) | EACH | 2 | $17,000 | $21,230 |
| 40 | (607.41010010) | 1,100 | $8.00 | $5.76 | |
| 41 | (608.01060415) | 100 | $70.00 | $154.79 | |
| 42 | (608.01070415) | 1,041 | $75.00 | $36.97 | |
| 43 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 42 | $300.00 | $231.08 |
| 44 | (608.21000003) | 10 | $600.00 | $639.30 | |
| 45 | (609.10010109) | 100 | $250.00 | $1,905.72 | |
| 46 | Compost (610.10) | CY | 4 | $165.00 | $1,242.93 |
| 47 | Topsoil - Roadside (610.1402) | CY | 22 | $150.00 | $246.14 |
| 48 | Turf Establishment - Roadside (610.1601) | SY | 184 | $10.00 | $20.15 |
| 49 | Watering Vegetation (610.19) | 1,000 GALLONS | 10 | $300.00 | $189.41 |
| 50 | (611.0151) | EACH | 15 | $1,500.00 | $792.00 |
| 51 | Portable Drip Irrigation System (611.17) | EACH | 15 | $100.00 | $55.00 |
| 52 | (611.19010024) | 9 | $600.00 | $55.00 | |
| 53 | Rodent Guard (611.21) | EACH | 15 | $40.00 | $33.00 |
| 54 | (614.060104) | EACH | 10 | $600.00 | $528.00 |
| 55 | (614.060304) | EACH | 10 | $1,300.00 | $1,485.00 |
| 56 | (614.060404) | EACH | 1 | $2,500.00 | $1,870.00 |
| 57 | (617.10000024) | 20 | $90.00 | $69.58 | |
| 58 | (617.11000024) | LS | 1 | $1,500.00 | $550.00 |
| 59 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $432,000 | $193,970 |
| 60 | (619.0901) | LF | 58,663 | $0.43 | $0.43 |
| 61 | (619.111113) | EACH | 8 | $10,000 | $2,750.00 |
| 62 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 72 | $10.00 | $11.00 |
| 63 | Stone Filling (Heavy) (620.05) | CY | 71 | $200.00 | $266.05 |
| 64 | Bedding Material, Type 1 (620.0801) | CY | 9 | $200.00 | $100.00 |
| 65 | Cleaning Drainage Structures (621.04) | EACH | 55 | $285.00 | $455.60 |
| 66 | Survey Operations (625.01) | LS | 1 | $75,000 | $35,304 |
| 67 | (627.50140008) | 10 | $50.00 | $6.60 | |
| 68 | Cleaning, Sealing and/or Filling Joints (633.13) | LF | 1,585 | $8.00 | $2.20 |
| 69 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 359 | $100.00 | $147.34 |
| 70 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 359 | $80.00 | $119.79 |
| 71 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 359 | $75.00 | $81.00 |
| 72 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 952 | $150.00 | $65.97 |
| 73 | (635.01030011) | 5,889 | $1.70 | $1.65 | |
| 74 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,700.00 | $5,368.00 |
| 75 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $3,000.00 | $4,950.00 |
| 76 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 |
| 77 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 30,586 | $0.43 | $0.43 |
| 78 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 28,886 | $0.43 | $0.43 |
| 79 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 33 | $38.00 | $35.20 |
| 80 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,444 | $41.00 | $39.60 |
| 81 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 104 | $41.00 | $38.50 |
| 82 | Type A Sign Posts (645.81) | EACH | 244 | $219.00 | $206.80 |
| 83 | (645.81090003) | 82 | $78.00 | $78.10 | |
| 84 | (645.830402) | EACH | 2 | $4,100.00 | $4,455.00 |
| 85 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 2 | $194.00 | $166.10 |
| 86 | Reference Marker Panel (646.21) | EACH | 46 | $54.00 | $44.00 |
| 87 | Steel Post, 2.0 lb/ft (646.32) | EACH | 46 | $133.00 | $92.40 |
| 88 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 146 | $55.00 | $42.90 |
| 89 | (647.83001002) | 46 | $39.00 | $15.40 | |
| 90 | Parallel Bar Frame 12 PCB & Parallel Bar Grate 12 PCB (655.0903) | EACH | 2 | $1,700.00 | $1,210.00 |
| 91 | (662.60000108) | 2,500 | $1.00 | $1.00 | |
| 92 | (680.05010007) | 4 | $28,000 | $32,450 | |
| 93 | (680.05020007) | 6 | $5,200.00 | $5,500.00 | |
| 94 | (680.05040004) | 12 | $5,200.00 | $6,050.00 | |
| 95 | (680.11131014) | 1 | $8,000.00 | $14,300 | |
| 96 | Concrete Base for Controller Cabinet (680.5002) | EACH | 1 | $4,200.00 | $3,850.00 |
| 97 | (680.50500005) | 1 | $1,000.00 | $550.00 | |
| 98 | (680.510201) | EACH | 2 | $2,500.00 | $2,475.00 |
| 99 | (680.510301) | EACH | 1 | $2,800.00 | $2,750.00 |
| 100 | (680.51100010) | 5 | $500.00 | $550.00 | |
| 101 | (680.520105) | LF | 47 | $60.00 | $22.00 |
| 102 | (680.520506) | LF | 31 | $30.00 | $16.50 |
| 103 | (680.520508) | LF | 195 | $50.00 | $22.00 |
| 104 | Single Span Wire Assembly (680.7001) | EACH | 6 | $4,200.00 | $4,400.00 |
| 105 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 3 | $5,000.00 | $8,800.00 |
| 106 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 1 | $1,500.00 | $1,100.00 |
| 107 | (680.730514) | LF | 10,916 | $5.00 | $6.05 |
| 108 | (680.730714) | LF | 1,003 | $6.50 | $6.38 |
| 109 | (680.77000105) | 1 | $3,000.00 | $5,500.00 | |
| 110 | (680.77000205) | 1 | $3,000.00 | $5,500.00 | |
| 111 | (680.77000305) | 1 | $3,000.00 | $5,500.00 | |
| 112 | (680.77000405) | 1 | $3,000.00 | $8,250.00 | |
| 113 | (680.77000505) | 1 | $3,000.00 | $4,400.00 | |
| 114 | (680.77000605) | 1 | $3,000.00 | $4,400.00 | |
| 115 | (680.78010005) | 2 | $1,000.00 | $550.00 | |
| 116 | (680.78020005) | 1 | $1,200.00 | $2,200.00 | |
| 117 | (680.78040005) | 1 | $2,800.00 | $3,300.00 | |
| 118 | (680.79000105) | 1 | $3,200.00 | $5,500.00 | |
| 119 | (680.79000205) | 1 | $3,200.00 | $5,500.00 | |
| 120 | (680.79000305) | 1 | $3,200.00 | $5,500.00 | |
| 121 | (680.79000405) | 1 | $3,200.00 | $8,250.00 | |
| 122 | (680.79000505) | 1 | $3,200.00 | $4,400.00 | |
| 123 | (680.79000605) | 1 | $3,200.00 | $4,400.00 | |
| 124 | (680.80324515) | 4 | $3,500.00 | $5,500.00 | |
| 125 | (680.80324708) | 4 | $1,500.00 | $2,200.00 | |
| 126 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 49 | $150.00 | $165.00 |
| 127 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 12 | $150.00 | $165.00 |
| 128 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 49 | $150.00 | $165.00 |
| 129 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 18 | $150.00 | $165.00 |
| 130 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 49 | $150.00 | $165.00 |
| 131 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 14 | $150.00 | $165.00 |
| 132 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 191 | $175.00 | $330.00 |
| 133 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 61 | $400.00 | $676.50 |
| 134 | Traffic Signal Disconnect Hanger (680.8120) | EACH | 61 | $500.00 | $896.50 |
| 135 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 21 | $260.00 | $286.00 |
| 136 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 42 | $260.00 | $286.00 |
| 137 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 19 | $550.00 | $616.00 |
| 138 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 21 | $260.00 | $357.50 |
| 139 | (680.8203) | EACH | 7 | $1,000.00 | $1,265.00 |
| 140 | (680.82250801) | 28 | $500.00 | $660.00 | |
| 141 | (680.83010005) | 502 | $0.75 | $5.50 | |
| 142 | Meter Pan (680.9402) | EACH | 1 | $1,200.00 | $1,100.00 |
| 143 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $1,200.00 | $1,100.00 |
| 144 | (680.95010105) | 2 | $3,200.00 | $11,000 | |
| 145 | (680.950102) | LF | 1,041 | $7.50 | $4.68 |
| 146 | (680.950106) | LF | 261 | $5.00 | $3.30 |
| 147 | (680.95110001) | 1 | $14,000 | $20,350 | |
| 148 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 37,164 | $0.53 | $0.53 |
| 149 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 28,886 | $0.53 | $0.53 |
| 150 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 18,195 | $3.75 | $3.72 |
| 151 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 1,986 | $3.75 | $3.72 |
| 152 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 36 | $327.00 | $324.50 |
| 153 | Field Change Payment (FCP) (697.03) | DOL | 193,000 | $1.00 | $1.00 |
| 154 | Asphalt Price Adjustment (698.04) | DOL | 8,980 | $1.00 | $1.00 |
| 155 | Fuel Price Adjustment (698.05) | DOL | 194 | $1.00 | $1.00 |
| 156 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 157 | Mobilization (699.040001) | LS | 1 | $201,000 | $177,758 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.