NYSDOT contract D265497 bid tabulation

SAFETY ENHANCEMENTS PROJECT - NY Route 101. Let by New York State DOT on June 26, 2025, Nassau, Region 10. 6 bids received; low bid $3,544,811 by Posillico Civil Inc.

Owner
New York State DOT
Letting
26 JUN 2025
Pay items
138
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Posillico Civil Inc$3,544,811Low
2Pratt Brothers Inc$3,625,000+2.0%
3H & L Contracting LLC$3,972,000+12%
4Stasi General Contracting LLC$5,669,950+60%
5Triumph Construction Corp$6,254,850+76%
6Fos Development Corp$6,500,383+83%
NYSDOT contract D265497: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Posillico Civil Inc2. Pratt Brothers Inc3. H & L Contracting LLC4. Stasi General Contracting LLC5. Triumph Construction Corp6. Fos Development Corp
1Clearing and Grubbing (201.06)LS1$10,000$25,000$29,344$150,000$7,270.00$19,872
2Unclassified Excavation and Disposal (203.02)CY900$50.00$100.00$170.00$120.00$262.00$212.87
3Embankment In Place (203.03)CY5$205.00$30.00$1.44$1,000.00$447.00$99.42
4Select Granular Fill (203.07)CY120$50.00$40.00$50.00$100.00$147.00$80.70
5Trench and Culvert Excavation (206.0201)CY150$1.00$10.00$30.00$100.00$716.00$76.03
6 (206.03100010)130$135.00$100.00$145.62$125.00$73.00$511.23
7 (209.11010024)22$455.00$125.00$690.00$250.00$359.00$2,229.51
8Silt Fence - Temporary (209.13)LF870$25.00$12.00$25.87$14.00$14.00$10.48
9Removal and Disposal of Underground Pipe ACM (BV14) (210.3111)LF200$245.00$185.00$250.00$300.00$182.00$435.80
10 (304.10119917)330$215.00$145.00$155.00$185.00$199.00$304.10
11 (404.0001)TON167$125.00$125.00$125.00$125.00$125.00$125.00
12Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1$125.00$125.00$125.00$125.00$125.00$125.00
13Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT9$125.00$125.00$125.00$125.00$125.00$125.00
14 (404.0189)TON860$170.00$175.00$120.00$150.00$298.00$274.86
15 (404.0961)TON1,704$170.00$151.00$140.00$180.00$300.00$204.68
16 (404.1989)TON254$170.00$345.00$450.00$200.00$237.00$672.53
17 (404.2589)TON508$170.00$345.00$380.00$200.00$238.00$409.36
18 (404.4289)TON63$170.00$400.00$460.00$200.00$371.00$385.97
19Diluted Tack Coat (407.0102)GAL846$50.00$9.00$3.95$5.00$44.00$23.39
20Asphalt Pavement Joint Adhesive (418.7603)LF4,542$5.00$2.00$1.28$8.00$2.00$9.36
21Production Cold Milling of Bituminous Concrete (490.10)SY14,080$3.00$10.00$9.35$9.00$13.00$12.28
22 (502.10010018)LS1$2,000.00$1,500.00$5,500.00$20,000$11,189$12,076
23 (510.02210018)3$1,775.00$4,000.00$6,000.00$4,000.00$10,368$5,178.38
24 (510.20000018)11$450.00$25.00$1,140.00$1,000.00$1,645.00$1,205.90
25 (520.05000010)4,172$4.95$5.50$4.95$6.00$7.00$9.81
26 (520.09000010)615$3.00$5.00$3.00$6.00$4.00$10.33
27Temporary Timber Sheeting (552.12)SF2,000$1.00$4.00$0.16$65.00$21.00$1.17
28 (603.6002)LF42$130.00$195.00$165.00$700.00$33.00$198.83
29 (603.6003)LF61$165.00$200.00$169.00$800.00$38.00$224.57
30 (603.6005)LF62$185.00$215.00$180.00$425.00$60.00$274.86
31 (604.07200110)3$2,500.00$1,500.00$3,300.00$6,000.00$2,325.00$1,502.95
32 (604.07210110)15$2,550.00$1,500.00$3,300.00$500.00$230.00$1,502.95
33 (604.07240110)3$4,500.00$4,000.00$5,200.00$5,000.00$5,791.00$5,848.06
34 (604.501012)LF22$100.00$2,400.00$1,850.00$3,000.00$1,879.00$3,216.43
35Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT7$125.00$125.00$125.00$125.00$125.00$125.00
36Concrete Sidewalks and Driveways (608.0101)CY60$785.00$1,200.00$785.00$1,800.00$560.00$1,257.34
37 (608.01020005)9$2,850.00$4,000.00$2,850.00$2,000.00$2,096.00$3,536.97
38 (608.01050010)54$1,375.00$1,100.00$1,300.00$1,800.00$900.00$1,227.83
39 (608.01050109)1$4,850.00$8,000.00$6,500.00$17,000$3,833.00$1,391.85
40 (608.01050209)3$5,750.00$12,000$7,500.00$18,000$957.00$1,391.85
41 (608.01051209)2$22,000$20,000$16,000$18,500$1,704.00$1,391.85
42 (608.01051409)1$4,350.00$7,500.00$6,500.00$12,000$3,043.00$1,391.85
43 (608.02010015)7$1,500.00$765.00$100.00$125.00$496.00$309.95
44 (609.04010510)1,844$80.00$65.00$60.00$55.00$62.00$28.02
45 (609.04050510)243$90.00$85.00$65.00$60.00$54.00$89.80
46 (609.06000008)1,152$18.00$9.00$25.00$10.00$20.00$11.70
47Fertilizer (610.0501)LB50$4.00$4.00$4.00$100.00$6.00$4.68
48Limestone (610.06)LB40$4.00$4.00$4.00$100.00$6.00$4.68
49Mycorrhizal Fungi (610.0701)LB2$25.00$25.00$25.00$100.00$36.00$29.24
50Moisture Retention Additive (610.08)LB6$20.00$20.00$20.00$100.00$29.00$23.39
51Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY5$100.00$120.00$100.00$125.00$145.00$116.96
52Topsoil - Roadside (610.1402)CY56$98.00$125.00$98.00$125.00$142.00$114.62
53Topsoil - Lawns (610.1403)CY20$98.00$125.00$98.00$140.00$142.00$114.62
54Turf Establishment - Roadside (610.1601)SY481$5.00$7.00$5.00$30.00$7.00$5.85
55Turf Establishment -Lawns (610.1602)SY111$10.00$13.00$10.00$30.00$15.00$11.70
56Watering Vegetation (610.19)1,000 GALLONS10$100.00$100.00$100.00$400.00$145.00$116.96
57 (611.0421)EACH60$110.00$110.00$110.00$2,500.00$160.00$128.66
58 (611.0522)EACH20$110.00$110.00$110.00$2,000.00$160.00$128.66
59Post-Planting Care (611.19)EACH30$20.00$20.00$20.00$500.00$29.00$23.39
60 (615.02050124)3$1,000.00$1,000.00$296.75$1,000.00$727.00$2,159.66
61Basic Work Zone Traffic Control (619.01)LS1$400,000$295,000$524,022$150,000$793,125$1,742,722
62Type III Construction Barricades (619.04)EACH12$235.00$125.00$55.00$7,000.00$362.00$365.50
63Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF5,700$3.62$3.50$3.62$4.00$4.00$3.33
64 (619.0904)LF19,579$2.94$2.85$2.94$4.00$4.00$2.92
65 (619.10050020)720$40.00$75.00$5.00$500.00$36.00$61.53
66 (619.111133)EACH3$8,300.00$25,000$12,000$25,000$43,046$39,733
67Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH3$3,000.00$1,600.00$3,000.00$6,500.00$1,749.00$1,407.04
68Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF4,140$75.00$50.00$85.00$45.00$173.00$114.88
69Warning Lights on Temporary Positive Barriers (619.1719)EACH414$30.00$150.00$135.00$100.00$73.00$48.86
70Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH8$13,225$9,000.00$12,500$10,000$13,271$10,667
71Nighttime Operations (Entire Project) (619.24)LS1$150,000$135,611$75,000$150,000$155,432$261,586
72Traffic Control Supervisor (619.25)MONTH12$100.00$1,000.00$150.00$15,000$31,638$22,162
73Cleaning Closed Drainage Systems (621.03)LF1,885$6.00$5.00$9.05$7.00$28.00$28.07
74Cleaning Drainage Structures (621.04)EACH18$1,150.00$1,200.00$1,300.00$1,000.00$1,288.00$584.81
75Survey Operations (625.01)LS1$70,000$55,000$115,000$50,000$171,562$70,177
76 (625.09010015)LS1$7,000.00$21,000$2,500.00$50,000$175,924$35,088
77Cleaning Existing Pavement and/or Shoulder (633.11)SY14,080$0.30$0.20$0.15$30.00$2.00$1.17
78Cleaning, Sealing and/or Filling Cracks (633.12)LS1$18,000$25,000$13,036$95,000$24,717$17,544
79 (634.10010015)LS1$10,000$16,000$10,000$50,000$10,000$11,696
80Concrete Cylinder Curing Equipment (637.04)EACH1$5,000.00$2,000.00$3,500.00$5,000.00$4,892.00$2,924.03
81Engineer’s Field Office – Type 3 (637.13)MONTH14$10,000$7,000.00$8,000.00$4,000.00$15,759$10,937
82Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
83Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
84Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
85 (637.41000115)14$112.00$250.00$227.51$5,000.00$815.00$258.99
86 (637.41000215)14$112.00$250.00$227.51$5,000.00$815.00$258.99
87 (637.41000315)14$112.00$250.00$227.51$5,000.00$815.00$258.99
88 (637.41000415)14$112.00$250.00$227.51$5,000.00$815.00$258.99
89 (637.41000515)14$112.00$250.00$227.51$5,000.00$815.00$258.99
90Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF58$103.50$104.00$103.50$500.00$150.00$71.55
91Type A Sign Posts (645.81)EACH21$305.00$305.00$305.00$500.00$443.00$665.12
92Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24)EACH1$95.00$95.00$95.00$1,500.00$138.00$254.90
93Steel Post, 1.1 lb/ft (646.31)EACH1$150.00$150.00$150.00$1,800.00$218.00$254.90
94Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH15$554.00$555.00$554.00$2,500.00$805.00$664.34
95Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH1$75.00$75.00$75.00$3,000.00$109.00$1,180.66
96Remove and Dispose High Capacity Type A Ground Mounted Sign Support and Foundation (647.64)EACH14$800.00$800.00$800.00$3,000.00$1,163.00$337.34
97 (655.05010010)9$3,400.00$2,300.00$3,400.00$1,000.00$1,680.00$1,228.09
98 (655.07030010)3$2,840.00$2,300.00$2,472.72$5,000.00$3,801.00$2,561.45
99Manhole Frame & Cover (655.1202)EACH3$2,840.00$1,200.00$1,400.00$3,000.00$833.00$935.69
100 (655.16000011)3$700.00$2,000.00$800.00$1,000.00$853.00$247.96
101 (662.62000010)1$755.00$7,500.00$3,300.00$1,000.00$1,680.00$1,518.16
102Adjust Existing Valve Box Elevation (663.33)EACH12$135.00$100.00$175.00$500.00$215.00$415.21
103 (670.14480010)4$955.00$900.00$900.00$800.00$727.00$1,035.11
104 (680.05010007)1$25,000$26,000$27,000$50,000$36,758$29,570
105Pole Excavation and Concrete Foundation (680.5001)CY4$4,500.00$2,200.00$5,500.00$2,000.00$5,386.00$844.46
106 (680.51050010)2$3,500.00$4,600.00$1,900.00$2,800.00$4,607.00$3,706.50
107 (680.520106)LF60$26.00$112.00$26.00$35.00$162.00$130.30
108 (680.520108)LF75$62.00$122.00$62.00$80.00$177.00$142.34
109 (680.6708)EACH3$2,500.00$2,800.00$2,500.00$3,500.00$3,312.00$2,664.38
110 (680.730214)LF185$3.00$5.90$3.00$6.00$9.00$6.90
111 (680.730514)LF1,265$4.00$6.40$4.00$10.00$9.00$7.49
112 (680.79400010)1$7,500.00$740.00$1,200.00$1,500.00$1,076.00$865.51
113 (680.80324515)1$2,500.00$5,225.00$2,500.00$2,500.00$7,569.00$6,088.99
114Traffic Signal Module - 12-inch, Red Ball, LED (680.810101)EACH1$180.00$340.00$180.00$2,500.00$491.00$395.33
115Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103)EACH1$180.00$345.00$180.00$2,000.00$500.00$402.34
116Traffic Signal Module - 12-inch, Green Ball, LED (680.810105)EACH1$180.00$345.00$180.00$2,000.00$500.00$402.34
117Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH3$500.00$525.00$500.00$1,000.00$762.00$612.88
118Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH1$300.00$725.00$300.00$800.00$1,053.00$846.80
119Pedestrian Signal Section, Aluminum, Type I, for 16 inches by 18 inches LED module (680.813108)EACH7$550.00$775.00$550.00$800.00$1,124.00$904.11
120Pedestrian Signal Bracket Mount Assembly (680.8141)EACH2$400.00$485.00$400.00$800.00$701.00$563.76
121Pedestrian Signal Post Top Mount Assembly (680.8142)EACH5$550.00$685.00$550.00$800.00$994.00$800.01
122Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002)EACH7$900.00$660.00$900.00$1,200.00$955.00$768.43
123 (680.8151)EACH3$1,200.00$1,550.00$1,200.00$1,800.00$2,242.00$1,803.54
124 (680.8152)EACH4$2,200.00$3,100.00$2,200.00$3,000.00$4,448.00$3,577.84
125 (680.83200010)LS1$5,000.00$10,000$5,000.00$10,000$4,197.00$5,614.13
126Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$11.00$11.00$11.00$11.00$11.00$11.00
127 (680.99050010)1$3,000.00$2,890.00$2,887.00$5,000.00$6,979.00$3,376.67
128 (685.07200110)3,092$0.60$0.80$0.81$4.00$2.00$1.93
129 (685.07200310)20$159.58$155.00$159.58$800.00$138.00$111.11
130 (685.07200410)4,121$0.60$2.20$2.24$4.00$2.00$1.93
131 (685.07200510)1,985$2.77$2.70$2.77$4.00$2.00$1.93
132 (685.07200610)2,539$0.60$0.80$0.81$4.00$2.00$1.93
133 (685.07200710)120$2.24$2.20$2.24$4.00$2.00$1.93
134Field Change Payment (FCP) (697.03)DOL250,000$1.00$1.00$1.00$1.00$1.00$1.00
135Asphalt Price Adjustment (698.04)DOL4,236$1.00$1.00$1.00$1.00$1.00$1.00
136Fuel Price Adjustment (698.05)DOL1,066$1.00$1.00$1.00$1.00$1.00$1.00
137Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
138Mobilization (699.040001)LS1$136,339$135,000$150,000$100,000$238,500$178,290
NYSDOT contract D265497: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of June 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy