NYSDOT contract D265645 bid tabulation
SIGNAL IMPROVEMENTS PROJECT 2026-2027. Let by New York State DOT on December 4, 2025, Essex, Jefferson, St. Lawrence, Region 01, 07. 2 bids received; low bid $2,521,074 by Tadcon Electric LLC.
- Owner
- New York State DOT
- Letting
- 04 DEC 2025
- Pay items
- 133
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Tadcon Electric LLC | $2,521,074 | Low |
| 2 | Binghamton Road Electric LLC | $2,627,779 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Tadcon Electric LLC | 2. Binghamton Road Electric LLC |
|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 423 | $84.46 | $154.00 |
| 2 | Embankment In Place (203.03) | CY | 170 | $46.89 | $107.00 |
| 3 | Select Granular Fill (203.07) | CY | 20 | $164.71 | $142.00 |
| 4 | (203.24010017) | 35 | $127.05 | $77.00 | |
| 5 | (205.0201) | LS | 1 | $2,029.00 | $1,790.00 |
| 6 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 30 | $142.00 | $202.00 |
| 7 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 4 | $331.20 | $567.00 |
| 8 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $1,020.00 | $1,770.00 |
| 9 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $36.00 | $65.00 |
| 10 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $19.20 | $45.00 |
| 11 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 4 | $115.31 | $217.00 |
| 12 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 4 | $139.31 | $141.00 |
| 13 | (205.050201) | TON | 16 | $234.97 | $167.00 |
| 14 | Trench and Culvert Excavation (206.0201) | CY | 35 | $63.30 | $117.00 |
| 15 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 1,057 | $51.77 | $55.00 |
| 16 | Test Pit Excavation (206.05) | EACH | 19 | $1,494.93 | $1,700.00 |
| 17 | Geotextile Separation (207.21) | SY | 65 | $12.34 | $19.00 |
| 18 | Seed and Mulch – Temporary (209.1003) | SY | 628 | $3.77 | $4.00 |
| 19 | Check Dam, Prefabricated – Temporary (209.1105) | LF | 20 | $21.32 | $179.00 |
| 20 | Silt Fence - Temporary (209.13) | LF | 120 | $14.37 | $17.00 |
| 21 | Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703) | LF | 32 | $42.96 | $82.00 |
| 22 | Subbase Course, Type 2 (304.12) | CY | 265 | $648.28 | $217.00 |
| 23 | (404.0001) | TON | 10 | $80.00 | $80.00 |
| 24 | (404.0983) | TON | 49 | $301.75 | $470.00 |
| 25 | (404.1989) | TON | 73 | $311.67 | $404.00 |
| 26 | (404.2589) | TON | 4 | $453.41 | $404.00 |
| 27 | (404.3789) | TON | 60 | $199.70 | $317.00 |
| 28 | Diluted Tack Coat (407.0102) | GAL | 68 | $32.27 | $7.00 |
| 29 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 940 | $4.03 | $10.00 |
| 30 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 75 | $46.82 | $117.00 |
| 31 | (520.60900002) | 10 | $150.42 | $49.00 | |
| 32 | (603.171216) | EACH | 2 | $952.92 | $527.00 |
| 33 | (603.9815) | LF | 100 | $34.66 | $59.00 |
| 34 | (604.070701) | EACH | 1 | $1,831.67 | $1,300.00 |
| 35 | Underdrain Filter, Type II (605.1001) | CY | 16 | $80.20 | $177.00 |
| 36 | (605.1701) | LF | 200 | $2.04 | $3.50 |
| 37 | Concrete Sidewalks and Driveways (608.0101) | CY | 40 | $3,438.66 | $2,970.00 |
| 38 | (608.21000003) | 21 | $467.58 | $417.00 | |
| 39 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 75 | $153.16 | $167.00 |
| 40 | (609.0401) | LF | 409 | $159.99 | $207.00 |
| 41 | Resetting Existing Curb (609.15) | LF | 80 | $119.01 | $159.00 |
| 42 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 25 | $151.31 | $270.00 |
| 43 | (610.11040409) | 12 | $430.83 | $470.00 | |
| 44 | Turf Establishment – Performance (610.1605) | SY | 699 | $3.89 | $27.00 |
| 45 | (611.0741) | EACH | 10 | $49.23 | $125.00 |
| 46 | Transplanting Herbaceous Plants (611.16) | EACH | 9 | $1,004.56 | $600.00 |
| 47 | (614.060303) | EACH | 2 | $1,317.33 | $1,990.00 |
| 48 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $178,153 | $322,000 |
| 49 | Type III Construction Barricades (619.04) | EACH | 34 | $300.00 | $135.00 |
| 50 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 16 | $267.44 | $300.00 |
| 51 | Stone Filling (Light) (620.03) | CY | 8 | $294.65 | $697.00 |
| 52 | Survey Operations (625.01) | LS | 1 | $15,000 | $61,700 |
| 53 | (627.50140008) | 1,010 | $1.41 | $8.40 | |
| 54 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 2,610 | $4.29 | $2.70 |
| 55 | Cleaning and Preparation of Pavement Surfaces-Letters (635.0203) | EACH | 20 | $120.00 | $120.00 |
| 56 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 5 | $240.00 | $240.00 |
| 57 | Concrete Cylinder Curing Equipment (637.04) | EACH | 5 | $288.17 | $2,700.00 |
| 58 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 24 | $2,662.92 | $2,750.00 |
| 59 | Office Technology and Supplies (637.34) | DOL | 3,000 | $1.00 | $1.00 |
| 60 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 61 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 17 | $349.32 | $67.00 |
| 62 | Type A Sign Posts (645.81) | EACH | 12 | $548.36 | $297.00 |
| 63 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 2 | $282.30 | $197.00 |
| 64 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 7 | $280.59 | $370.00 |
| 65 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 8 | $108.17 | $37.00 |
| 66 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 6 | $34.94 | $57.00 |
| 67 | (662.60010004) | 5,000 | $1.00 | $1.00 | |
| 68 | (680.05010007) | 5 | $22,670 | $24,200 | |
| 69 | (680.05020007) | 3 | $3,897.67 | $3,900.00 | |
| 70 | Pole Excavation and Concrete Foundation (680.5001) | CY | 80.20 | $2,160.17 | $2,305.00 |
| 71 | Concrete Base for Controller Cabinet (680.5002) | EACH | 5 | $2,945.82 | $2,797.00 |
| 72 | (680.50500005) | 148.50 | $12.00 | $377.00 | |
| 73 | (680.510501) | EACH | 30 | $2,693.28 | $1,870.00 |
| 74 | (680.520506) | LF | 229 | $13.80 | $13.00 |
| 75 | (680.520508) | LF | 3,155 | $11.32 | $29.00 |
| 76 | Trenchless Installation Method for Conduit (680.5301) | LF | 825 | $143.91 | $137.00 |
| 77 | (680.621926) | EACH | 1 | $12,997 | $10,197 |
| 78 | (680.621928) | EACH | 1 | $13,129 | $10,257 |
| 79 | (680.621934) | EACH | 1 | $15,852 | $11,077 |
| 80 | (680.621938) | EACH | 1 | $17,306 | $12,337 |
| 81 | (680.621940) | EACH | 1 | $14,407 | $12,647 |
| 82 | (680.621941) | EACH | 1 | $17,495 | $13,577 |
| 83 | (680.622022) | EACH | 1 | $12,396 | $10,170 |
| 84 | (680.622030) | EACH | 1 | $16,794 | $10,770 |
| 85 | (680.622034) | EACH | 1 | $16,285 | $10,877 |
| 86 | (680.622035) | EACH | 1 | $17,698 | $11,170 |
| 87 | (680.622036) | EACH | 1 | $16,601 | $11,700 |
| 88 | (680.622040) | EACH | 1 | $19,035 | $12,717 |
| 89 | (680.622136) | EACH | 1 | $20,036 | $11,727 |
| 90 | (680.622138) | EACH | 1 | $17,058 | $11,970 |
| 91 | (680.622155) | EACH | 1 | $31,189 | $18,799 |
| 92 | (680.622160) | EACH | 1 | $28,989 | $20,227 |
| 93 | (680.622162) | EACH | 1 | $29,150 | $22,217 |
| 94 | (680.62226815) | 1 | $36,287 | $23,870 | |
| 95 | (680.622362) | EACH | 1 | $29,711 | $22,470 |
| 96 | (680.6708) | EACH | 15 | $1,224.00 | $1,487.00 |
| 97 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 5 | $991.20 | $907.00 |
| 98 | Shielded Lead-in Cable (680.71) | LF | 2,970 | $3.05 | $2.70 |
| 99 | (680.730514) | LF | 11,221 | $4.28 | $3.00 |
| 100 | (680.730714) | LF | 1,863 | $10.50 | $4.00 |
| 101 | (680.79010008) | LS | 1 | $10,626 | $5,714.00 |
| 102 | (680.79020008) | LS | 1 | $10,626 | $5,714.00 |
| 103 | (680.79030008) | LS | 1 | $10,626 | $5,714.00 |
| 104 | (680.79040008) | LS | 1 | $10,626 | $5,714.00 |
| 105 | (680.80324515) | 5 | $1,688.99 | $3,107.00 | |
| 106 | (680.80324603) | 5 | $968.10 | $1,297.00 | |
| 107 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 147 | $27.37 | $39.00 |
| 108 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 147 | $226.68 | $187.00 |
| 109 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 3 | $527.75 | $537.00 |
| 110 | (680.81230008) | 46 | $614.92 | $587.00 | |
| 111 | Install Pedestrian Signal Module (680.813104) | EACH | 40 | $81.83 | $39.00 |
| 112 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 36 | $384.36 | $267.00 |
| 113 | Pedestrian Signal Section - Polycarbonate, Type I, for 16-inch by 18-inch LED module (680.813109) | EACH | 4 | $481.29 | $317.00 |
| 114 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 6 | $465.00 | $567.00 |
| 115 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 16 | $453.79 | $337.00 |
| 116 | (680.8151) | EACH | 16 | $1,211.40 | $1,247.00 |
| 117 | Backplates for Traffic Signal Heads (680.8199) | EACH | 49 | $181.63 | $237.00 |
| 118 | (680.8207) | EACH | 14 | $474.07 | $817.00 |
| 119 | (680.8452) | EACH | 6 | $4,836.13 | $2,247.00 |
| 120 | (680.94000008) | 5 | $1,970.99 | $1,777.00 | |
| 121 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 5 | $1,936.50 | $377.00 |
| 122 | (680.950106) | LF | 1,597 | $4.98 | $4.70 |
| 123 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $12.50 | $12.50 |
| 124 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 325 | $6.00 | $6.00 |
| 125 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 50 | $6.00 | $6.00 |
| 126 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 4,161 | $5.18 | $4.45 |
| 127 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 12 | $420.00 | $120.00 |
| 128 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 5 | $726.00 | $290.00 |
| 129 | Field Change Payment (FCP) (697.03) | DOL | 138,000 | $1.00 | $1.00 |
| 130 | Asphalt Price Adjustment (698.04) | DOL | 137 | $1.00 | $1.00 |
| 131 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 |
| 132 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 133 | Mobilization (699.040001) | LS | 1 | $96,964 | $100,230 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.