NYSDOT contract D265746 bid tabulation
CULVERT MAINTENACE & REHAB/REPAIR - I-84, Town of Greenville. Let by New York State DOT on February 26, 2026, Orange, Region 08. 3 bids received; low bid $421,310 by Ferraro Construction Corp.
- Owner
- New York State DOT
- Letting
- 26 FEB 2026
- Pay items
- 26
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ferraro Construction Corp | $421,310 | Low |
| 2 | Ground Control Excavating Inc. | $443,525 | +5.0% |
| 3 | Jorrey Excavating Inc | $513,383 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ferraro Construction Corp | 2. Ground Control Excavating Inc. | 3. Jorrey Excavating Inc |
|---|---|---|---|---|---|---|
| 1 | (201.07000004) | 460 | $68.00 | $45.00 | $20.00 | |
| 2 | Embankment In Place (203.03) | CY | 95 | $123.00 | $125.00 | $100.00 |
| 3 | Trench and Culvert Excavation (206.0201) | CY | 113 | $210.00 | $125.00 | $51.00 |
| 4 | Geotextile Bedding (207.20) | SY | 30 | $78.00 | $25.00 | $3.00 |
| 5 | Mulch – Temporary (209.100101) | SY | 150 | $28.00 | $26.67 | $1.00 |
| 6 | Seed and Mulch – Temporary (209.1003) | SY | 150 | $28.00 | $26.67 | $1.00 |
| 7 | Silt Fence - Temporary (209.13) | LF | 250 | $12.85 | $12.00 | $4.00 |
| 8 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 43 | $56.00 | $125.00 | $60.00 |
| 9 | Stabilized Construction Access (209.22) | SY | 700 | $24.00 | $125.00 | $8.00 |
| 10 | (553.030001) | EACH | 1 | $4,200.00 | $10,000 | $150.00 |
| 11 | (602.3624) | LF | 459 | $350.00 | $360.00 | $400.00 |
| 12 | (603.171416) | EACH | 2 | $5,200.00 | $500.00 | $300.00 |
| 13 | (604.07210008) | 8 | $1,150.00 | $500.00 | $100.00 | |
| 14 | Turf Establishment – Performance (610.1605) | SY | 100 | $68.00 | $42.00 | $5.00 |
| 15 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $28,000 | $20,000 | $198,000 |
| 16 | (619.110511) | EACH | 2 | $8,800.00 | $700.00 | $5,000.00 |
| 17 | Stone Filling (Medium) (620.04) | CY | 20 | $325.00 | $150.00 | $100.00 |
| 18 | Cleaning Drainage Structures (621.04) | EACH | 8 | $850.00 | $1,500.00 | $300.00 |
| 19 | Survey Operations (625.01) | LS | 1 | $7,200.00 | $10,000 | $4,000.00 |
| 20 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 8 | $1,450.00 | $1,000.00 | $3,000.00 |
| 21 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 22 | Field Change Payment (FCP) (697.03) | DOL | 34,000 | $1.00 | $1.00 | $1.00 |
| 23 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 24 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 25 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 26 | Mobilization (699.040001) | LS | 1 | $16,204 | $17,059 | $17,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.