NYSDOT contract D265756 bid tabulation
Gowanus Expy - Corrective Repairs & Preventative Maintenance. Let by New York State DOT on March 5, 2026, Kings, Region 11. 4 bids received; low bid $62,856,334 by FCS Group LLC.
- Owner
- New York State DOT
- Letting
- 05 MAR 2026
- Pay items
- 151
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | FCS Group LLC | $62,856,334 | Low |
| 2 | Es II Enterprises LLC /DBA El Sol Enterprises | $64,876,000 | +3.0% |
| 3 | Ahern Painting Contractors Inc/Ne Structural Steel Inc JV | $77,475,539 | +23% |
| 4 | Gccom Construction Co., Inc. | $78,912,389 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. FCS Group LLC | 2. Es II Enterprises LLC /DBA El Sol Enterprises | 3. Ahern Painting Contractors Inc/Ne Structural Steel Inc JV | 4. Gccom Construction Co., Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $50,000 | $5,000.00 | $42,353 | $450,000 |
| 2 | Removal of Steel Supported Structural Slabs (without shear connectors) – Type B (202.2302) | SF | 500 | $30.00 | $150.00 | $212.00 | $250.00 |
| 3 | Select Structural Fill (203.21) | CY | 93 | $100.00 | $350.00 | $220.00 | $350.00 |
| 4 | Sand Backfill (203.25) | CY | 10 | $200.00 | $350.00 | $444.00 | $350.00 |
| 5 | Structure Excavation (206.01) | CY | 85 | $250.00 | $350.00 | $357.00 | $250.00 |
| 6 | (206.03120011) | 75 | $200.00 | $225.00 | $124.00 | $260.00 | |
| 7 | Subbase Course, Type 1 (304.11) | CY | 10 | $1,000.00 | $500.00 | $425.00 | $4,000.00 |
| 8 | (404.1281) | TON | 10 | $1,000.00 | $600.00 | $778.00 | $1,300.00 |
| 9 | (404.4189) | TON | 2 | $1,000.00 | $600.00 | $791.00 | $3,000.00 |
| 10 | Diluted Tack Coat (407.0102) | GAL | 2 | $1,000.00 | $5.00 | $124.00 | $50.00 |
| 11 | PCC Foundation for Pavement, HES Concrete (503.1012) | CY | 4 | $2,000.00 | $1,500.00 | $2,323.00 | $1,500.00 |
| 12 | (510.81000018) | 30 | $150.00 | $100.00 | $65.00 | $120.00 | |
| 13 | (520.05000010) | 1,050 | $50.00 | $10.00 | $22.00 | $20.00 | |
| 14 | Concrete for Structures, Performance (555.0021) | CY | 39 | $1,400.00 | $1,750.00 | $5,340.00 | $5,500.00 |
| 15 | (555.20012011) | 1 | $5,000.00 | $40,000 | $19,740 | $110,000 | |
| 16 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $8.00 | $8.00 | $8.00 | $8.00 |
| 17 | Epoxy-Coated Steel Fabric Reinforcement (556.0102) | SY | 1 | $1,000.00 | $20.00 | $1,219.00 | $100.00 |
| 18 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 30 | $250.00 | $15.00 | $32.00 | $300.00 |
| 19 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 2,019 | $15.00 | $15.00 | $12.00 | $25.00 |
| 20 | (557.04020011) | 30 | $1,000.00 | $2,700.00 | $1,849.00 | $2,000.00 | |
| 21 | (557.05010011) | 450 | $300.00 | $500.00 | $201.00 | $1,200.00 | |
| 22 | Protective Sealing of New Structural Concrete (559.02) | SF | 1,150 | $15.00 | $10.00 | $4.00 | $6.00 |
| 23 | (559.23000011) | 400 | $15.00 | $15.00 | $80.00 | $15.00 | |
| 24 | (559.30000011) | 16,000 | $7.00 | $6.00 | $4.00 | $1.00 | |
| 25 | (560.04010008) | 100 | $75.00 | $100.00 | $248.00 | $200.00 | |
| 26 | (564.05000111) | LS | 1 | $50,000 | $30,000 | $293,561 | $300,000 |
| 27 | (564.05000211) | LS | 1 | $50,000 | $165,000 | $27,501 | $200,000 |
| 28 | (564.05000311) | 1 | $50,000 | $30,000 | $292,933 | $200,000 | |
| 29 | (564.1001) | 22,778 | $47.00 | $25.00 | $22.00 | $35.00 | |
| 30 | (564.10010011) | 20,000 | $9.00 | $7.00 | $10.00 | $12.00 | |
| 31 | (564.10020011) | 20,000 | $25.00 | $45.00 | $41.00 | $50.00 | |
| 32 | (564.510001) | LB | 386,492 | $20.00 | $34.00 | $26.50 | $23.00 |
| 33 | (564.510002) | LB | 48,248 | $34.00 | $45.00 | $30.00 | $25.00 |
| 34 | (564.510003) | LB | 79,179 | $28.00 | $40.00 | $24.00 | $18.00 |
| 35 | (564.510004) | LB | 19,647 | $42.00 | $35.00 | $29.00 | $20.00 |
| 36 | (564.510005) | LB | 44,667 | $16.00 | $45.00 | $34.00 | $22.00 |
| 37 | (564.510006) | LB | 39,995 | $17.00 | $45.00 | $38.00 | $32.00 |
| 38 | (564.510007) | LB | 127,682 | $16.00 | $45.00 | $27.00 | $23.00 |
| 39 | (564.510010) | LB | 1,282 | $66.00 | $60.00 | $48.00 | $23.00 |
| 40 | (564.510011) | LB | 1,696 | $24.00 | $40.00 | $23.00 | $40.00 |
| 41 | (564.510012) | LB | 30,000 | $10.00 | $30.00 | $23.00 | $17.00 |
| 42 | (564.700001) | EACH | 16 | $19,920 | $3,000.00 | $4,600.00 | $3,000.00 |
| 43 | (564.700002) | EACH | 5 | $27,300 | $10,000 | $27,000 | $3,500.00 |
| 44 | (564.700003) | EACH | 1,079 | $120.00 | $150.00 | $48.00 | $60.00 |
| 45 | (564.700005) | EACH | 3 | $318.00 | $500.00 | $85.00 | $60.00 |
| 46 | (564.700006) | EACH | 5 | $25,200 | $10,000 | $9,800.00 | $7,000.00 |
| 47 | (564.700007) | EACH | 10 | $12,000 | $2,500.00 | $14,355 | $2,000.00 |
| 48 | (564.700008) | EACH | 5 | $21,840 | $5,000.00 | $2,500.00 | $2,000.00 |
| 49 | (564.75000001) | 6 | $3,600.00 | $2,200.00 | $573.00 | $1,750.00 | |
| 50 | (564.75000011) | 120 | $330.00 | $150.00 | $24.00 | $35.00 | |
| 51 | (565.13210115) | 5 | $7,440.00 | $7,000.00 | $3,358.00 | $5,000.00 | |
| 52 | (565.13210215) | 6 | $7,440.00 | $7,000.00 | $4,113.00 | $6,800.00 | |
| 53 | (565.13210315) | 6 | $9,600.00 | $7,000.00 | $5,038.00 | $8,400.00 | |
| 54 | (565.13210415) | 5 | $6,000.00 | $7,000.00 | $3,745.00 | $6,500.00 | |
| 55 | (565.13210515) | 1 | $6,000.00 | $7,000.00 | $4,830.00 | $8,400.00 | |
| 56 | (565.13210615) | 15 | $7,680.00 | $7,000.00 | $3,745.00 | $5,300.00 | |
| 57 | (565.13210715) | 30 | $9,600.00 | $7,000.00 | $4,700.00 | $7,500.00 | |
| 58 | (565.13210815) | 1 | $9,600.00 | $7,000.00 | $4,700.00 | $6,400.00 | |
| 59 | (565.13210915) | 18 | $14,400 | $7,000.00 | $3,086.00 | $8,000.00 | |
| 60 | (565.13211015) | 1 | $14,400 | $7,000.00 | $3,500.00 | $8,000.00 | |
| 61 | (565.13211115) | 5 | $14,400 | $7,000.00 | $3,500.00 | $8,000.00 | |
| 62 | (565.13211215) | 1 | $14,400 | $7,000.00 | $4,628.00 | $8,000.00 | |
| 63 | (565.13211315) | 1 | $14,400 | $7,000.00 | $7,586.00 | $8,000.00 | |
| 64 | Type M.R. Fixed Bearing (451 to 675 k) (565.1723) | EACH | 4 | $21,600 | $12,500 | $7,868.00 | $8,200.00 |
| 65 | (565.43010011) | 85 | $1,250.00 | $800.00 | $2,516.00 | $1,000.00 | |
| 66 | (565.43020015) | 5 | $3,500.00 | $7,500.00 | $9,033.00 | $1,000.00 | |
| 67 | Bridge Joint Header (567.62) | CF | 41 | $4,480.00 | $550.00 | $1,300.00 | $3,300.00 |
| 68 | (567.64000116) | 200 | $750.00 | $150.00 | $179.00 | $300.00 | |
| 69 | (567.80000011) | 34,808 | $80.00 | $50.00 | $180.00 | $130.00 | |
| 70 | (567.93010102) | 100 | $672.00 | $160.00 | $270.00 | $300.00 | |
| 71 | (567.93010202) | 100 | $716.80 | $160.00 | $270.00 | $400.00 | |
| 72 | Performance Concrete Quality Adjustment (567.99) | QUALITY UNIT | 1 | $40.54 | $40.54 | $40.54 | $40.54 |
| 73 | Lead-Exposure Control Plan (570.01) | LS | 1 | $1,000.00 | $15,000 | $50,000 | $10,000 |
| 74 | Medical Testing (570.02) | DOL | 9,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 75 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 37,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 76 | Decontamination Facilities (570.04) | CALENDAR WEEK | 124 | $30.00 | $500.00 | $728.00 | $100.00 |
| 77 | (570.090001) | LS | 1 | $5,000.00 | $15,000 | $75,000 | $20,000 |
| 78 | (570.160001) | LS | 1 | $35,000 | $50,000 | $75,000 | $675,000 |
| 79 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 1,000 | $1.00 | $0.75 | $5.00 | $5.00 |
| 80 | Disposal of Non-Hazardous Industrial Solid Paint Removal Waste (571.04) | LB | 2,500 | $1.00 | $0.25 | $2.00 | $10.00 |
| 81 | (574.030001) | SF | 31,149 | $125.00 | $140.00 | $146.00 | $170.00 |
| 82 | (574.030002) | SF | 660 | $250.00 | $295.00 | $59.00 | $350.00 |
| 83 | (576.03210011) | 34 | $450.00 | $650.00 | $466.00 | $600.00 | |
| 84 | (576.11220011) | 50 | $500.00 | $750.00 | $279.00 | $1,250.00 | |
| 85 | Downspout System (Ductile Iron) (576.2001) | LF | 225 | $850.00 | $850.00 | $1,000.00 | $1,100.00 |
| 86 | (576.22900011) | 225 | $80.00 | $120.00 | $144.00 | $160.00 | |
| 87 | (576.32040011) | 450 | $150.00 | $215.00 | $1,275.00 | $1,200.00 | |
| 88 | Removal of Structural Concrete (580.01) | CY | 39 | $600.00 | $1,200.00 | $4,884.00 | $5,000.00 |
| 89 | Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061) | SF | 25 | $600.00 | $500.00 | $1,194.00 | $500.00 |
| 90 | (585.01) | EACH | 846 | $4,200.00 | $3,600.00 | $8,260.00 | $7,000.00 |
| 91 | (585.02) | EACH | 129 | $30,000 | $6,500.00 | $13,250 | $10,000 |
| 92 | (585.03) | EACH | 104 | $15,400 | $1,500.00 | $40,000 | $25,000 |
| 93 | (585.04) | EACH | 8 | $24,000 | $12,000 | $33,650 | $10,000 |
| 94 | (585.05) | EACH | 11 | $24,000 | $7,500.00 | $60,599 | $10,000 |
| 95 | (585.06) | EACH | 4 | $36,000 | $50,000 | $5,205.00 | $50,000 |
| 96 | (585.07) | EACH | 2 | $36,000 | $100,000 | $10,453 | $50,000 |
| 97 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 940 | $80.00 | $60.00 | $79.00 | $50.00 |
| 98 | Drilling and Grouting Bolts or Reinforcing Bars (with Non-Destructive Investigation) (586.0202) | EACH | 28 | $200.00 | $85.00 | $98.00 | $300.00 |
| 99 | Removal of Rivets-Replacement with High Strength Bolts (586.05) | EACH | 31,505 | $60.00 | $50.00 | $80.00 | $130.00 |
| 100 | Field Drill Holes in Existing Structural Steel (586.10) | EACH | 56,380 | $60.00 | $35.00 | $53.00 | $85.00 |
| 101 | (589.010001) | LB | 136,971 | $6.00 | $5.00 | $11.00 | $10.00 |
| 102 | (589.010002) | LB | 1,000 | $6.00 | $10.00 | $14.00 | $20.00 |
| 103 | (589.010003) | LB | 350 | $6.00 | $5.00 | $30.00 | $10.00 |
| 104 | (589.520001) | EACH | 10 | $2,400.00 | $800.00 | $1,432.00 | $1,000.00 |
| 105 | (589.520011) | EACH | 95 | $1,800.00 | $500.00 | $1,995.00 | $1,500.00 |
| 106 | Weak-Post, Corrugated Beam Guide Rail (606.18) | LF | 80 | $250.00 | $200.00 | $207.00 | $300.00 |
| 107 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 80 | $200.00 | $75.00 | $99.00 | $120.00 |
| 108 | (607.06400016) | 80 | $60.00 | $275.00 | $369.00 | $120.00 | |
| 109 | (609.06000008) | 120 | $90.00 | $40.00 | $57.00 | $75.00 | |
| 110 | (609.26520011) | 120 | $120.00 | $104.30 | $186.00 | $200.00 | |
| 111 | (613.70020011) | 100 | $60.00 | $60.00 | $40.00 | $75.00 | |
| 112 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $7,100,000 | $4,484,637 | $5,901,839 | $6,200,000 |
| 113 | (619.01940111) | 200 | $1,000.00 | $500.00 | $1,000.00 | $4,600.00 | |
| 114 | (619.01940211) | 200 | $1,000.00 | $500.00 | $2,000.00 | $5,900.00 | |
| 115 | (619.01940411) | 200 | $1,000.00 | $1,500.00 | $400.00 | $3,500.00 | |
| 116 | Type III Construction Barricades (619.04) | EACH | 1,500 | $30.00 | $15.00 | $248.00 | $60.00 |
| 117 | (619.080102) | LF | 38,000 | $1.50 | $2.00 | $2.00 | $2.00 |
| 118 | (619.100101) | LF | 27,000 | $1.50 | $1.50 | $1.00 | $2.00 |
| 119 | (619.10050020) | 1,816 | $40.00 | $40.00 | $10.00 | $45.00 | |
| 120 | (619.110512) | EACH | 6 | $800.00 | $7,250.00 | $25,000 | $65,000 |
| 121 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 6,000 | $66.00 | $15.00 | $45.00 | $100.00 |
| 122 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 1,226 | $25.00 | $25.00 | $101.00 | $25.00 |
| 123 | (619.22970011) | 75,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 124 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $832,500 | $500,000 | $777,340 | $600,000 |
| 125 | (619.60750011) | 5,756 | $20.00 | $8.00 | $51.00 | $40.00 | |
| 126 | (619.70030011) | 5,000 | $40.00 | $87.05 | $46.00 | $175.00 | |
| 127 | (624.0113) | SF | 134 | $100.00 | $225.00 | $82.00 | $500.00 |
| 128 | Survey Operations (625.01) | LS | 1 | $50,000 | $340,000 | $100,000 | $500,000 |
| 129 | (627.50140008) | 50 | $350.00 | $10.00 | $58.00 | $15.00 | |
| 130 | (634.20010111) | 1,000 | $40.00 | $50.00 | $43.00 | $150.00 | |
| 131 | Concrete Cylinder Curing Equipment (637.04) | EACH | 5 | $5,000.00 | $500.00 | $2,500.00 | $2,000.00 |
| 132 | Engineer’s Field Office – Type 5 (637.15) | MONTH | 31 | $12,000 | $12,500 | $18,000 | $30,000 |
| 133 | (637.31020020) | 62 | $1,000.00 | $900.00 | $1,000.00 | $1,000.00 | |
| 134 | Office Technology and Supplies (637.34) | DOL | 12,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 135 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 136 | (639.21010011) | LS | 1 | $200,000 | $300,000 | $200,000 | $200,000 |
| 137 | (641.51012316) | 5 | $5,000.00 | $20,000 | $20,597 | $40,000 | |
| 138 | (642.16010001) | 5 | $5,000.00 | $5,000.00 | $13,840 | $9,000.00 | |
| 139 | (655.00050011) | 5 | $10,000 | $5,000.00 | $3,000.00 | $2,500.00 | |
| 140 | (655.00060011) | 5 | $10,000 | $5,000.00 | $745.00 | $700.00 | |
| 141 | Miscellaneous Metals (656.01) | LB | 57 | $350.00 | $25.00 | $25.00 | $125.00 |
| 142 | (683.08010105) | 5 | $10,000 | $5,000.00 | $12,414 | $20,000 | |
| 143 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 18,312 | $1.50 | $1.75 | $1.00 | $4.00 |
| 144 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 18,312 | $1.50 | $1.75 | $1.00 | $4.00 |
| 145 | (691.04000020) | 303,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 146 | (695.33110105) | LS | 1 | $10,000 | $50,000 | $100,000 | $85,000 |
| 147 | Field Change Payment (FCP) (697.03) | DOL | 4,630,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 148 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 149 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 150 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 151 | Mobilization (699.040001) | LS | 1 | $2,400,000 | $2,400,000 | $2,978,000 | $3,000,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.