ODOT contract 250338 bid tabulation

ATH-US 50-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on July 17, 2025, ATH. 1 bid received; low bid $4,042,008 by Shelly & Sands Inc.

Owner
Ohio DOT
Letting
17 JUL 2025
Pay items
24
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Shelly & Sands Inc$4,042,008Low
ODOT contract 250338: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Shelly & Sands Inc
1Preparing subgrade for shoulder paving (209E72050)MI23.12$1,800.00
2Pavement repair (253E02000)CY869$350.00
3Pavement planing, asphalt concrete 0.5" (254E01000)SY159,361$1.40
4Patching planed surface (254E01600)SY1,523$5.25
5Non-tracking tack coat (407E20000)GAL17,466$3.30
6Prime coat (408E10000)GAL10,853$4.75
7Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000)CY8,151$260.00
8Asphalt concrete intermediate course, 19 MM, type A (448) (442E20200)CY2,269$225.00
9Compacted aggregate (617E10100)CY758$110.00
10Rumble stripes, center line (asphalt concrete) (618E43000)MI9.09$800.00
11Longitudinal joint preparation (874E21000)MI9.09$14,500
12RPM (621E00100)EACH1,261$34.50
13Raised pavement marker removed (621E54000)EACH1,261$12.00
14Edge line, 6", type 1 (642E00104)MI23.12$870.00
15Center line, type 1 (642E00300)MI11.56$1,130.00
16Stop line (644E00500)FT410$13.75
17Work zone marking sign (614E12460)EACH96$85.00
18Work zone center line, class I, 642 paint (614E21100)MI23.12$1,225.50
19Work zone center line, class II, 642 paint (614E21500)MI23.12$260.00
20Work zone stop line, class III, 642 paint (614E26610)FT18$8.50
21Premium for contract performance bond and for payment bond (103E05000)LS1$13,500
22Maintaining traffic (614E11000)LS1$245,000
23Construction layout stakes and surveying, as per plan (623E10001)LS1$5,100.00
24Mobilization (624E10000)LS1$100,000
ODOT contract 250338: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy