ODOT contract 250522 bid tabulation

GAL-SR 325-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on November 13, 2025, GAL. 1 bid received; low bid $4,288,519 by Shelly Company, -0.6% against the engineer's estimate of $4,316,000.

Owner
Ohio DOT
Letting
13 NOV 2025
Pay items
53
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$4,288,519Low-1.0%
ODOT contract 250522: bids by rank

Engineer's estimate: $4,316,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company
1Walk removed (202E30000)SF1,332$10.00
2Curb removed (202E32000)FT60$20.00
3Excavation (203E10000)CY326$61.00
4Subgrade compaction (204E10000)SY845$2.75
5Ditch cleanout (209E10000)FT1,590$2.55
6Linear grading (209E60500)MI0.30$2,400.00
7Preparing subgrade for shoulder paving (209E72050)MI8.14$1,425.00
84" concrete walk (608E10000)SF601$22.00
9Curb ramp (608E52000)SF1,026$22.00
10Seeding and mulching, as per plan (659E10001)SY739$5.00
11Catch basin adjusted to grade (611E98630)EACH1$1,225.00
12Manhole adjusted to grade (611E99654)EACH6$1,225.00
13Full depth pavement sawing (252E01500)FT871$3.80
14Pavement repair (253E02000)CY1,468$382.00
15Pavement planing, asphalt concrete 1.50" (254E01000)SY76,070$2.10
16Pavement planing, asphalt concrete 3.75" (254E01000)SY39,375$4.25
17Asphalt concrete base, PG64-22, (449) (301E56000)CY104$259.00
18Aggregate base (304E20000)CY135$170.00
19Non-tracking tack coat (407E20000)GAL6,357$4.10
20Non-tracking tack coat (407E20000)GAL8,308$4.10
21Prime coat (408E10000)GAL4,150$4.50
22Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100)CY4,989.19$225.25
23Asphalt concrete intermediate course, 19 MM, type A (448) (442E20200)CY6,538$216.25
24Curb, type 6 (609E26000)FT97$40.00
25Compacted aggregate (617E10100)CY331$109.00
26Valve box adjusted to grade (638E10800)EACH3$420.00
27Special - gas valve box adjusted to grade (611E99700)EACH2$420.00
28RPM (621E00100)EACH706$29.63
29Raised pavement marker removed (621E54000)EACH661$4.00
30Ground mounted support, no. 3 post (630E03100)FT32$25.00
31Breakaway structural beam connection (630E09000)EACH2$200.00
32Sign, flat sheet (630E80100)SF54$25.00
33Ground mounted structural beam support foundation (630E84500)EACH2$1,000.00
34Removal of ground mounted sign and reerection (630E85100)EACH1$200.00
35Removal of ground mounted post support and disposal (630E86002)EACH2$50.00
36Removal of ground mounted structural beam support (630E86102)EACH2$500.00
37Edge line, 6", type 1 (642E00104)MI14.52$855.00
38Center line, type 1 (642E00300)MI7.26$1,275.00
39Crosswalk line, 12", type 1 (642E00620)FT134$4.00
40Stop line (644E00500)FT403$12.95
41Crosswalk line, 12" (644E00620)FT134$4.50
42Crosswalk line, 24" (644E00630)FT162$9.50
43School symbol marking, 96" (644E01110)EACH2$880.00
44Lane arrow (644E01300)EACH4$110.00
45Work zone marking sign (614E12460)EACH82$90.00
46Work zone center line, class I, 642 paint (614E21100)MI21.78$1,325.00
47Work zone center line, class II, 642 paint (614E21500)MI21.78$325.00
48Premium for contract performance bond and for payment bond (103E05000)LS1$12,000
49Maintaining traffic (614E11000)LS1$360,000
50Construction layout stakes and surveying (623E10000)LS1$9,500.00
51Mobilization (624E10000)LS1$100,000
100Erosion control (832E30000)EACH1,000$1.00
101Ground mounted structural beam support, S4X7.7 (630E06400)FT27.60$28.00
ODOT contract 250522: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy