ODOT contract 253000 bid tabulation
BEL-IR 70-09.35 (INTERCHANGE). Let by Ohio DOT on April 18, 2025, BEL. 2 bids received; low bid $27,231,121 by Shelly & Sands Inc, +26% against the engineer's estimate of $21,655,000.
- Owner
- Ohio DOT
- Letting
- 18 APR 2025
- Pay items
- 41
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $27,231,121 | Low | +26% |
| 2 | Beaver Excavating Company | $31,743,969 | +17% | +47% |
Engineer's estimate: $21,655,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Beaver Excavating Company |
|---|---|---|---|---|---|
| 1 | Special - clearing and grubbing (201E99000) | LS | 1 | $205,000 | $100,000 |
| 2 | Special - structure removed (202E99000) | LS | 1 | $90,000 | $350,000 |
| 3 | Special - pavement removed (202E99020) | LS | 1 | $450,000 | $500,000 |
| 4 | Special - earthwork (203E99000) | LS | 1 | $950,000 | $1,400,000 |
| 5 | Special - roadway (690E20240) | LS | 1 | $525,000 | $1,850,000 |
| 6 | Special - permanent erosion control (659E99000) | LS | 1 | $200,000 | $175,000 |
| 7 | Storm water pollution prevention plan (832E15000) | LS | 1 | $10,500 | $4,000.00 |
| 8 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $50,000 | $52,000 |
| 9 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $34,000 | $33,000 |
| 10 | Special - construction erosion control (832E99100) | EACH | 500,000 | $1.00 | $1.00 |
| 11 | Special - drainage (611E97800) | LS | 1 | $2,600,000 | $2,800,000 |
| 12 | Special - flexible pavement (400E99000) | LS | 1 | $725,000 | $585,000 |
| 13 | Special - rigid pavement (450E99000) | LS | 1 | $5,680,000 | $5,025,000 |
| 14 | Special - water works (638E99000) | LS | 1 | $16,000 | $175,000 |
| 15 | Special - sanitary sewer (611E97910) | LS | 1 | $8,500.00 | $350,000 |
| 16 | Special - lighting (625E99000) | LS | 1 | $705,000 | $490,000 |
| 17 | Special - signs and supports (630E99000) | LS | 1 | $92,000 | $95,000 |
| 18 | Special - pavement marking (640E99000) | LS | 1 | $100,000 | $120,000 |
| 19 | Special - ITS (809E99000) | LS | 1 | $65,000 | $20,000 |
| 20 | Special - traffic signals (632E99000) | LS | 1 | $1,150,000 | $1,675,000 |
| 21 | Special - retaining wall (530E99050) | LS | 1 | $1.00 | $1.00 |
| 22 | Special - sealing of concrete (512E99000) | LS | 1 | $25,000 | $23,000 |
| 23 | Special - structures (530E99040) | LS | 1 | $2,500,000 | $3,000,000 |
| 24 | Special - sealing of concrete (512E99000) | LS | 1 | $25,000 | $22,000 |
| 25 | Special - structures (530E99040) | LS | 1 | $3,000,000 | $3,680,000 |
| 26 | Special - utility coordination (107E99010) | EACH | 10 | $8,500.00 | $7,500.00 |
| 27 | Special - as-built construction plans (690E20010) | LS | 1 | $55,000 | $118,000 |
| 28 | Special - field surveys (690E20020) | LS | 1 | $70,000 | $38,500 |
| 29 | Special - preliminary design (690E20040) | LS | 1 | $800,000 | $1,685,000 |
| 30 | Special - final design (690E20050) | LS | 1 | $650,000 | $740,000 |
| 31 | Special - construction plans (690E20220) | LS | 1 | $400,000 | $256,000 |
| 32 | Special - premium for contract performance bond and for payment bond (103E99010) | LS | 1 | $201,000 | $250,000 |
| 33 | Special - CPM progress schedule (108E99000) | LS | 1 | $35,000 | $20,000 |
| 34 | Special - maintaining traffic (614E99000) | LS | 1 | $2,900,000 | $3,150,000 |
| 35 | Field office, type C (619E16020) | MNTH | 42 | $4,410.00 | $4,500.00 |
| 36 | Special - construction layout stakes and surveying (623E99000) | LS | 1 | $600,000 | $215,000 |
| 37 | Special - mobilization (624E99000) | LS | 1 | $1,200,000 | $1,587,198 |
| 100 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 720 | $110.00 | $85.00 |
| 101 | Portable changeable message sign (614E18600) | SNMT | 120 | $800.00 | $1,800.00 |
| 102 | Special - work involving petroleum contaminated soil (690E65016) | TON | 850 | $90.00 | $75.00 |
| 103 | Special - work involving regulated water (690E65024) | GAL | 92,200 | $1.00 | $0.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.