ODOT contract 260138 bid tabulation

D05-PM FY2026 (B) Fast Dry West (PAVEMENT MARKING). Let by Ohio DOT on March 12, 2026, District 5. 4 bids received; low bid $1,300,000 by The Aero-Mark Company LLC, -26% against the engineer's estimate of $1,763,000.

Owner
Ohio DOT
Letting
12 MAR 2026
Pay items
21
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1The Aero-Mark Company LLC$1,300,000Low-26%
2Daltons Inc$1,328-100%-100%
3Oglesby Construction Inc$1,399,036+8.0%-21%
4Alpha Space Control LLC$1,628,704+25%-8.0%
ODOT contract 260138: bids by rank

Engineer's estimate: $1,763,000.

Bid tabulation

LinePay itemUnitQuantity1. The Aero-Mark Company LLC2. Daltons Inc3. Oglesby Construction Inc4. Alpha Space Control LLC
1Edge line, 6", type 1 (642E00104)MI1,301.48$584.00$0.01$618.00$731.25
2Lane line, 6", type 1 (642E00204)MI139.37$300.00$0.01$285.00$429.58
3Center line, type 1 (642E00300)MI572.66$590.00$0.01$635.00$559.69
4Channelizing line, 8", type 1 (642E00400)FT28,299$0.35$0.01$0.35$0.49
5Channelizing line, 12", type 1 (642E00404)FT47,576$0.40$0.01$0.40$0.55
6Stop line, type 1 (642E00500)FT5,595$3.60$0.01$2.95$5.85
7Crosswalk line, 12", type 1 (642E00620)FT10,783$2.42$0.01$1.40$3.85
8Railroad symbol marking, type 1 (642E01000)EACH24$225.00$0.01$310.00$365.00
9School symbol marking, 96", type 1 (642E01110)EACH24$225.00$0.01$210.00$315.00
10Lane arrow, type 1 (642E01300)EACH383$40.00$0.01$42.00$62.50
11Lane reduction arrow, type 1 (642E01312)EACH10$150.00$0.01$175.00$395.00
12Wrong way arrow, type 1 (642E01322)EACH10$100.00$0.01$80.00$195.00
13Word on pavement, 96", type 1 (642E01410)EACH4$100.00$0.01$80.00$100.00
14Word on pavement, 96", type 1 (642E01410)EACH127$50.00$0.01$75.00$75.00
15Dotted line, 6", type 1 (642E01510)FT37,428$0.60$0.01$0.48$0.45
16Yield line, type 1 (642E20802)FT333$1.00$0.01$3.00$18.50
17Speed measurement marking, as per plan (642E40001)EACH12$250.00$0.01$700.00$750.00
18Law enforcement officer with patrol car for assistance (614E11110)HR150$1.00$0.01$100.00$75.00
19Premium for contract performance bond and for payment bond (103E05000)LS1$5,773.57$0.01$7,000.00$25,000
20Maintaining traffic (614E11000)LS1$5,000.00$0.01$21,000$5,500.00
21Mobilization (624E10000)LS1$13,000$0.01$19,500$52,500
ODOT contract 260138: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy