ODOT contract 260504 bid tabulation
KNO-US 62-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on November 12, 2026, KNO. 2 bids received; low bid $4,851,899 by Kokosing Construction Company Inc, -11% against the engineer's estimate of $5,472,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 36
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $4,851,899 | Low | -11% |
| 2 | Shelly Company | $5,815,613 | +20% | +6.0% |
Engineer's estimate: $5,472,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc | 2. Shelly Company |
|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 4,744 | $6.00 | $9.50 |
| 2 | Walk removed (202E30000) | SF | 960 | $5.00 | $18.00 |
| 3 | Preparing subgrade for shoulder paving, as per plan (209E72051) | MI | 28.46 | $1,400.00 | $1,625.00 |
| 4 | Curb ramp (608E52000) | SF | 960 | $22.00 | $36.00 |
| 5 | Topsoil furnished and placed, as per plan (653E10001) | CY | 8 | $95.00 | $400.00 |
| 6 | Seeding and mulching, class 1 (659E00500) | SY | 80 | $6.00 | $9.75 |
| 7 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 8 | Partial depth pavement repair (asphalt concrete base) (251E01042) | CY | 4,500 | $205.00 | $312.75 |
| 9 | Non-tracking tack coat (407E20000) | GAL | 19,199 | $2.90 | $4.30 |
| 10 | Prime coat, as per plan (408E10001) | GAL | 13,359 | $4.95 | $4.85 |
| 11 | Fine graded polymer asphalt concrete, misc.: type (424E80000) | CY | 6,796 | $258.00 | $262.50 |
| 12 | Fine graded polymer asphalt concrete, misc.: type (424E80000) | CY | 2,965 | $280.00 | $266.00 |
| 13 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 167 | $490.00 | $410.00 |
| 14 | 2" deep joint sealer, as per plan (516E31011) | FT | 112 | $31.02 | $30.00 |
| 15 | Compacted aggregate, as per plan (617E10101) | CY | 1,860 | $45.00 | $98.75 |
| 16 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 12 | $575.00 | $575.00 |
| 17 | Longitudinal joint preparation (874E21000) | MI | 14.23 | $2,600.00 | $3,725.00 |
| 18 | Pavement planing, asphalt concrete, class A, 1.50" (897E01010) | SY | 224,894 | $0.85 | $2.18 |
| 19 | RPM (621E00100) | EACH | 952 | $29.00 | $29.00 |
| 20 | Raised pavement marker removed (621E54000) | EACH | 952 | $1.00 | $5.50 |
| 21 | Edge line, 6", type 1 (642E00104) | MI | 28.46 | $795.00 | $795.00 |
| 22 | Center line, type 1 (642E00300) | MI | 14.32 | $990.00 | $990.00 |
| 23 | Stop line (644E00500) | FT | 552 | $10.50 | $10.50 |
| 24 | Crosswalk line, 12" (644E00620) | FT | 652 | $5.65 | $5.65 |
| 25 | Edge line, 6" (646E10010) | MI | 0.18 | $21,740 | $21,740 |
| 26 | Center line (646E10200) | MI | 0.09 | $38,300 | $38,300 |
| 27 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $95.00 | $100.00 |
| 28 | Work zone marking sign (614E12460) | EACH | 93 | $65.00 | $88.00 |
| 29 | Asphalt concrete for maintaining traffic (614E13000) | CY | 3 | $900.00 | $275.00 |
| 30 | Work zone center line, class I, 642 paint (614E21100) | MI | 28.64 | $915.00 | $915.00 |
| 31 | Work zone stop line, class I, 642 paint (614E26200) | FT | 72 | $3.25 | $3.25 |
| 32 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $19,000 | $10,000 |
| 33 | Maintaining traffic (614E11000) | LS | 1 | $316,460 | $437,000 |
| 34 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,500.00 | $3,500.00 |
| 35 | Mobilization (624E10000) | LS | 1 | $235,000 | $127,000 |
| 100 | Field office, type C (619E16020) | MNTH | 12 | $2,200.00 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.