ODOT contract 15572 bid tabulation
Sisters and bend curb ramps. Let by Oregon DOT on June 5, 2025, Region 4. 3 bids received.
- Owner
- Oregon DOT
- Letting
- 05 JUN 2025
- Pay items
- 58
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 |
|---|---|---|---|---|---|---|
| 1 | Sign support footings (0920-0100000A) | CY | 1.60 | $2,187.50 | $3,437.50 | $13,750 |
| 2 | Pedestrian channelizing devices (0228-0141600F) | LF | 400 | $33.00 | $35.00 | $24.00 |
| 3 | Concrete storm sewer manholes (0470-0101000E) | EACH | 1 | $6,000.00 | $6,500.00 | $14,000 |
| 4 | Temporary walks (0228-0167680J) | SF | 375 | $25.00 | $15.00 | $10.00 |
| 5 | Mainline video inspection (0415-0100000F) | LF | 50 | $22.00 | $50.00 | $38.00 |
| 6 | Wood sign posts (0910-0100000K) | FBM | 138 | $26.00 | $20.00 | $20.00 |
| 7 | Inlet protection, type 10 (0280-0114100E) | EACH | 28 | $65.00 | $100.00 | $85.00 |
| 8 | Extra for new curb ramps (0759-0154100E) | EACH | 138 | $300.00 | $2,382.00 | $1,180.00 |
| 9 | Concrete islands (0759-0122000J) | SF | 390 | $40.00 | $26.87 | $16.00 |
| 10 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 7,700 | $28.00 | $68.45 | $41.00 |
| 11 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $33,333 | $25,000 | $85,000 |
| 12 | Pavement bar, type B-HS (0867-0145100J) | SF | 2,100 | $18.00 | $16.00 | $19.00 |
| 13 | Minor adjustment of manholes (0490-0120000E) | EACH | 10 | $900.00 | $350.00 | $440.00 |
| 14 | Temporary barricades, type II (0224-0104000E) | EACH | 100 | $68.00 | $100.00 | $70.00 |
| 15 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 3,900 | $55.00 | $32.61 | $57.00 |
| 16 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $1,500.00 | $16,500 | $4,000.00 |
| 17 | Rock mulch (1040-0196000M) | TON | 200 | $75.00 | $137.00 | $148.00 |
| 18 | Flaggers (0223-0168000T) | HR | 4,000 | $70.00 | $83.00 | $90.00 |
| 19 | Adjusting inlets (0490-0105000E) | EACH | 20 | $750.00 | $450.00 | $800.00 |
| 20 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 4 | $500.00 | $550.00 | $480.00 |
| 21 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 50 | $322.00 | $150.00 | $200.00 |
| 22 | Bar removal (0225-0156000J) | SF | 1,380 | $12.00 | $8.00 | $9.00 |
| 23 | Remove existing signs (0905-0100000A) | LS | 1 | $980.00 | $650.00 | $1,000.00 |
| 24 | Salvage, stockpile, and reinstall pavers (1999-9Z90000J) | SF | 3,300 | $12.00 | $8.00 | $11.00 |
| 25 | Adjusting boxes (0490-0100000E) | EACH | 20 | $555.00 | $2,175.00 | $400.00 |
| 26 | Traffic signal modification, US20 @ purcell BLVD (0990-0102000A) | EACH | 1 | $40,000 | $44,570 | $53,100 |
| 27 | Truncated domes on new surfaces (0759-0510000J) | SF | 2,100 | $49.00 | $54.08 | $52.00 |
| 28 | Sod lawn (1040-0189000J) | SY | 50 | $65.00 | $58.00 | $62.00 |
| 29 | Check dam, type 1 (0280-0106010E) | EACH | 4 | $100.00 | $250.00 | $480.00 |
| 30 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 390 | $9.00 | $3.00 | $4.80 |
| 31 | 4 inch colored concrete surfacing (0759-0138000J) | SF | 1,600 | $24.00 | $13.76 | $18.00 |
| 32 | Temporary barricades, type III (0224-0105000E) | EACH | 6 | $190.00 | $200.00 | $115.00 |
| 33 | Triangular base breakaway sign supports (0930-0112000A) | LB | 513.60 | $1.95 | $7.79 | $15.19 |
| 34 | Sequential arrow signs (0222-0162000E) | EACH | 6 | $1,500.00 | $3,950.00 | $1,800.00 |
| 35 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 15 | $925.00 | $1,500.00 | $1,700.00 |
| 36 | Inlet protection, type 3 (0280-0114030E) | EACH | 44 | $72.00 | $100.00 | $70.00 |
| 37 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $500.00 | $1,000.00 |
| 38 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 589.10 | $11.88 | $25.46 | $18.67 |
| 39 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 16 | $72.00 | $40.00 | $55.00 |
| 40 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 9 | $65.00 | $35.00 | $45.00 |
| 41 | Legend removal (0225-0155100J) | SF | 30 | $30.00 | $20.00 | $11.00 |
| 42 | Connection to existing structures (0490-0104000E) | EACH | 2 | $2,222.00 | $750.00 | $220.00 |
| 43 | Concrete curbs, standard curb (0759-0110000F) | LF | 1,500 | $63.00 | $37.12 | $35.00 |
| 44 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 40 | $300.00 | $160.00 | $295.00 |
| 45 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 2 | $5,200.00 | $3,120.00 | $2,800.00 |
| 46 | Concrete curbs, modified (0759-0102000F) | LF | 530 | $30.00 | $39.61 | $42.00 |
| 47 | Traffic signal modification, US20 @ 27TH ST (0990-0102000A) | EACH | 1 | $33,000 | $44,570 | $48,000 |
| 48 | Aggregate base (0640-0100000M) | TON | 2,900 | $69.00 | $26.00 | $82.00 |
| 49 | Concrete washout facility (0280-0112500E) | EACH | 3 | $1,000.00 | $1,000.00 | $2,100.00 |
| 50 | Asphalt pavement sawcutting, 10 inches deep (0310-0119100F) | LF | 5,700 | $4.00 | $6.00 | $9.00 |
| 51 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 920 | $300.00 | $165.00 | $330.00 |
| 52 | Crosswalk closure supports (0902-0101000E) | EACH | 3 | $1,500.00 | $1,750.00 | $1,400.00 |
| 53 | CL-6 chain link fence (1050-0135000F) | LF | 25 | $290.00 | $165.00 | $220.00 |
| 54 | Temporary plastic drums (0224-0145000E) | EACH | 140 | $48.00 | $50.00 | $55.00 |
| 55 | Temporary signs (0222-0102000J) | SF | 2,050 | $10.00 | $35.00 | $14.00 |
| 56 | Flagger station lighting (0223-0168100E) | EACH | 10 | $1,500.00 | $2,000.00 | $1,100.00 |
| 57 | Stripe removal (0225-0154000F) | LF | 190 | $10.00 | $10.00 | $5.00 |
| 58 | Concrete walks (0759-0128000J) | SF | 28,000 | $13.00 | $13.25 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.