ODOT contract 15587 bid tabulation
Redmond/prineville curb ramps. Let by Oregon DOT on March 6, 2025, Region 4. 4 bids received.
- Owner
- Oregon DOT
- Letting
- 06 MAR 2025
- Pay items
- 84
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 |
|---|---|---|---|---|---|---|---|
| 1 | Traffic signal modification, 97NB at canal (0990-0102000A) | EACH | 1 | $95,100 | $91,000 | $100,088 | $105,000 |
| 2 | Temporary plastic drums (0224-0145000E) | EACH | 34 | $55.00 | $80.00 | $50.00 | $65.00 |
| 3 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 1,450 | $310.00 | $310.00 | $165.00 | $430.00 |
| 4 | Flagpole sleeve (1999-9Z90000E) | EACH | 44 | $14.00 | $225.00 | $75.00 | $100.00 |
| 5 | Truncated domes on new surfaces (0759-0510000J) | SF | 812 | $47.00 | $50.00 | $38.00 | $47.00 |
| 6 | Temporary traffic signal (0227-0158000A) | LS | 1 | $43,000 | $50,360 | $36,821 | $43,000 |
| 7 | Adjusting inlets (0490-0105000E) | EACH | 60 | $600.00 | $1,000.00 | $2,550.00 | $2,000.00 |
| 8 | Bar removal (0225-0156000J) | SF | 6,436 | $5.10 | $8.00 | $6.00 | $5.50 |
| 9 | Concrete islands (0759-0122000J) | SF | 169 | $15.00 | $40.00 | $32.27 | $28.00 |
| 10 | Sign support footings (0920-0100000A) | CY | 2.70 | $6,666.67 | $7,407.41 | $4,666.67 | $5,000.00 |
| 11 | Traffic signal modification, glacier at 11TH (0990-0102000A) | EACH | 1 | $53,700 | $50,000 | $60,846 | $59,400 |
| 12 | Concrete washout facility (0280-0112500E) | EACH | 5 | $3,300.00 | $1,000.00 | $500.00 | $3,000.00 |
| 13 | Inlet protection, type 10 (0280-0114100E) | EACH | 22 | $100.00 | $75.00 | $115.00 | $95.00 |
| 14 | Flaggers (0223-0168000T) | HR | 2,400 | $81.00 | $97.00 | $80.60 | $90.00 |
| 15 | Traffic signal modification, glacier at 5TH (0990-0102000A) | EACH | 1 | $81,200 | $76,000 | $86,879 | $89,800 |
| 16 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 8 | $360.00 | $500.00 | $650.00 | $375.00 |
| 17 | Emulsified asphalt for tack coat (0730-0100000M) | TON | 1.35 | $0.74 | $10.00 | $800.00 | $1.00 |
| 18 | Minor adjustment of manholes (0490-0120000E) | EACH | 4 | $420.00 | $1,500.00 | $350.00 | $1,500.00 |
| 19 | Concrete curbs, standard curb (0759-0110000F) | LF | 2,023 | $27.00 | $53.00 | $44.94 | $46.00 |
| 20 | Pavement bar, type B-HS (0867-0145100J) | SF | 5,925 | $14.00 | $22.00 | $13.00 | $15.00 |
| 21 | Traffic signal modification, highland at 5TH (0990-0102000A) | EACH | 1 | $64,500 | $62,000 | $71,132 | $71,500 |
| 22 | Bollards (0815-0100000E) | EACH | 8 | $750.00 | $2,000.00 | $1,000.00 | $1,500.00 |
| 23 | Traffic signal modification, 6TH at quince (0990-0102000A) | EACH | 1 | $71,200 | $68,000 | $77,469 | $79,000 |
| 24 | Moving existing hydrants (1160-0102000E) | EACH | 1 | $4,500.00 | $4,500.00 | $3,500.00 | $2,500.00 |
| 25 | Traffic signal modification, evergreen (0990-0102000A) | EACH | 1 | $74,200 | $70,000 | $80,280 | $82,100 |
| 26 | Extra for new curb ramps (0759-0154100E) | EACH | 248 | $960.00 | $1,000.00 | $1,746.00 | $2,600.00 |
| 27 | Aggregate base (0640-0100000M) | TON | 4,000 | $88.00 | $77.00 | $0.01 | $54.00 |
| 28 | Unit pavers (0760-0100000J) | SF | 748 | $18.00 | $35.00 | $45.00 | $49.00 |
| 29 | Pollution control plan (0290-0100000A) | LS | 1 | $1,200.00 | $1,500.00 | $500.00 | $1,500.00 |
| 30 | Rock mulch (1040-0196000M) | TON | 11.10 | $300.00 | $300.00 | $10.00 | $320.00 |
| 31 | Temporary barricades, type II (0224-0104000E) | EACH | 59 | $70.00 | $85.00 | $100.00 | $75.00 |
| 32 | Stripe removal (0225-0154000F) | LF | 961 | $1.10 | $3.00 | $3.50 | $1.15 |
| 33 | Temporary walks (0228-0167680J) | SF | 2,130 | $7.00 | $10.00 | $10.00 | $9.00 |
| 34 | Traffic signal modification, highland at 9TH (0990-0102000A) | EACH | 1 | $53,700 | $50,000 | $60,870 | $59,500 |
| 35 | Traffic signal modification, glacier at 9TH (0990-0102000A) | EACH | 1 | $53,000 | $51,000 | $60,168 | $58,600 |
| 36 | Sod lawn (1040-0189000J) | SY | 2.33 | $400.00 | $300.00 | $110.00 | $380.00 |
| 37 | Switching, conduit, and wiring (0970-0105000A) | LF | 225 | $66.89 | $88.89 | $63.36 | $73.78 |
| 38 | Colored concrete surfacing (0759-0147000J) | SF | 45,030 | $10.00 | $14.00 | $20.97 | $12.00 |
| 39 | Clearing and grubbing (0320-0100000A) | ACRE | 0.20 | $20,000 | $40,000 | $37,620 | $100,000 |
| 40 | 6 inch ductile iron pipe with restrained joints and class B backfill (1140-0500000F) | LF | 5 | $500.00 | $400.00 | $400.00 | $360.00 |
| 41 | Traffic signal modification, highland at 6TH (0990-0102000A) | EACH | 1 | $76,600 | $75,000 | $82,519 | $85,000 |
| 42 | Subgrade geotextile (0350-0105000J) | SY | 32 | $25.00 | $20.00 | $5.00 | $5.00 |
| 43 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $2,500.00 | $8,000.00 | $16,500 | $3,500.00 |
| 44 | Concrete curbs, curb and gutter, modified (0759-0105000F) | LF | 6,763 | $51.00 | $70.00 | $71.49 | $70.00 |
| 45 | Traffic signal modification, highland at rimrock (0990-0102000A) | EACH | 1 | $55,200 | $50,000 | $62,280 | $61,000 |
| 46 | Traffic signal modification, highland at 15TH (0990-0102000A) | EACH | 1 | $116,700 | $111,000 | $120,502 | $129,000 |
| 47 | Metal handrail, 3 rails (1069-0100000F) | LF | 69 | $270.00 | $250.00 | $277.00 | $250.00 |
| 48 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 11,443 | $38.00 | $36.00 | $45.00 | $35.00 |
| 49 | Remove existing signs (0905-0100000A) | LS | 1 | $1,000.00 | $500.00 | $1,000.00 | $525.00 |
| 50 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $10,000 | $1,500.00 | $19,000 | $15,000 |
| 51 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 10 | $400.00 | $500.00 | $475.00 | $425.00 |
| 52 | Cast iron truncated domes on new surfaces (1999-9Z90000J) | SF | 2,301 | $55.00 | $60.00 | $50.00 | $63.00 |
| 53 | Sequential arrow signs (0222-0162000E) | EACH | 3 | $3,000.00 | $750.00 | $750.00 | $5,000.00 |
| 54 | Inlet protection, type 3 (0280-0114030E) | EACH | 67 | $70.00 | $65.00 | $115.00 | $75.00 |
| 55 | Emulsified asphalt in fog coat (0705-0101000M) | TON | 1.09 | $2,000.00 | $10.00 | $850.00 | $2,500.00 |
| 56 | Adjusting boxes (0490-0100000E) | EACH | 28 | $200.00 | $500.00 | $500.00 | $225.00 |
| 57 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $80,000 | $10,000 | $45,000 | $66,000 |
| 58 | Legend removal (0225-0155100J) | SF | 475 | $3.80 | $15.00 | $6.00 | $4.20 |
| 59 | Traffic control supervisor (0223-0169000E) | EACH | 280 | $355.00 | $500.00 | $150.00 | $950.00 |
| 60 | Pedestrian channelizing devices (0228-0141600F) | LF | 429 | $23.00 | $22.00 | $40.00 | $32.00 |
| 61 | Flagger station lighting (0223-0168100E) | EACH | 8 | $1,400.00 | $2,000.00 | $3,000.00 | $2,500.00 |
| 62 | Concrete walks (0759-0128000J) | SF | 13,630 | $9.00 | $12.00 | $16.19 | $10.00 |
| 63 | Temporary curb ramp, perpendicular (0228-0167670E) | EACH | 4 | $1,740.00 | $1,400.00 | $500.00 | $2,500.00 |
| 64 | Temporary signs (0222-0102000J) | SF | 1,760 | $14.00 | $12.00 | $35.00 | $29.00 |
| 65 | Concrete curbs, modified (0759-0102000F) | LF | 65.50 | $90.00 | $80.00 | $29.55 | $71.00 |
| 66 | Traffic signal modification, 97 at glacier (0990-0102000A) | EACH | 1 | $58,500 | $55,000 | $65,350 | $64,600 |
| 67 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 8 | $1,740.00 | $1,400.00 | $500.00 | $5,000.00 |
| 68 | Asphalt pavement sawcutting (0310-0119000F) | LF | 9,798 | $4.25 | $3.00 | $3.50 | $3.50 |
| 69 | Aggregate shoulders (0641-0130000M) | TON | 6.44 | $120.00 | $200.00 | $0.01 | $120.00 |
| 70 | Concrete driveways (0759-0126000J) | SF | 134 | $16.00 | $28.00 | $20.71 | $12.00 |
| 71 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,371 | $13.13 | $14.59 | $18.23 | $19.11 |
| 72 | Crosswalk closure supports (0902-0101000E) | EACH | 9 | $480.00 | $1,500.00 | $1,500.00 | $1,450.00 |
| 73 | Pavement legend, type B-HS: yield line triangle (0867-0169100E) | EACH | 18 | $85.00 | $200.00 | $478.00 | $95.00 |
| 74 | Temporary barricades, type III (0224-0105000E) | EACH | 12 | $120.00 | $100.00 | $200.00 | $210.00 |
| 75 | Traffic signal modification, glacier at 6TH (0990-0102000A) | EACH | 1 | $74,500 | $72,000 | $80,623 | $82,500 |
| 76 | Wood sign posts (0910-0100000K) | FBM | 130 | $18.00 | $46.00 | $20.00 | $18.00 |
| 77 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 3 | $280.00 | $500.00 | $180.00 | $300.00 |
| 78 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 260 | $78.00 | $45.00 | $35.00 | $38.00 |
| 79 | Traffic signal modification, 97SB at 6TH (0990-0102000A) | EACH | 1 | $78,000 | $75,000 | $83,934 | $86,500 |
| 80 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 2,645 | $1.90 | $2.00 | $1.50 | $2.00 |
| 81 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 15 | $45.00 | $80.00 | $40.00 | $35.00 |
| 82 | Traffic signal modification, highland at 11TH (0990-0102000A) | EACH | 1 | $62,500 | $60,000 | $69,229 | $69,000 |
| 83 | Traffic signal modification, highland at 27TH (0990-0102000A) | EACH | 1 | $22,400 | $22,000 | $31,231 | $25,000 |
| 84 | Inlet protection, type 7 (0280-0114070E) | EACH | 47 | $85.00 | $75.00 | $115.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of March 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way