ODOT contract 15594 bid tabulation
Or141 (sw hall blvd): sw spruce st - sw hemlock st. Let by Oregon DOT on March 27, 2025, Region 1. 4 bids received.
- Owner
- Oregon DOT
- Letting
- 27 MAR 2025
- Pay items
- 87
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 |
|---|---|---|---|---|---|---|---|
| 1 | Lighting poles and arms (0970-0200000A) | EACH | 3 | $6,000.00 | $8,261.67 | $8,333.33 | $7,666.67 |
| 2 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 2 | $3,200.00 | $3,500.00 | $5,000.00 | $3,000.00 |
| 3 | Mainline video with laser profile inspection (0415-0401000F) | LF | 190 | $10.00 | $15.00 | $55.00 | $25.00 |
| 4 | Switching, conduit, and wiring (0970-0105000A) | LF | 310 | $258.06 | $173.87 | $177.42 | $161.29 |
| 5 | 4 inch PVC pipe, 5 FT depth (0445-052004AF) | LF | 110 | $77.00 | $45.00 | $112.00 | $78.00 |
| 6 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 1 | $350.00 | $375.00 | $415.00 | $350.00 |
| 7 | Concrete walks, modified (0759-0128000J) | SF | 670 | $15.00 | $19.00 | $11.00 | $15.00 |
| 8 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 1 | $1,300.00 | $2,250.00 | $9,340.00 | $4,400.00 |
| 9 | Lead compliance plan (0294-0500000A) | LS | 1 | $500.00 | $500.00 | $4,650.00 | $5,000.00 |
| 10 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 1 | $3,200.00 | $3,500.00 | $5,880.00 | $3,500.00 |
| 11 | Extra for new curb ramps (0759-0154100E) | EACH | 11 | $500.00 | $1,535.00 | $1,300.00 | $780.00 |
| 12 | Pipe tees, 4 inch to 3 inch reducing (0445-0650000E) | EACH | 2 | $250.00 | $135.00 | $135.00 | $250.00 |
| 13 | Asphalt pavement sawcutting (0310-0119000F) | LF | 2,400 | $2.00 | $2.70 | $4.00 | $4.00 |
| 14 | Stripe removal (0225-0154000F) | LF | 8,600 | $1.50 | $0.70 | $0.87 | $0.65 |
| 15 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 39 | $46.00 | $41.00 | $52.00 | $45.00 |
| 16 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 170 | $44.00 | $38.50 | $46.00 | $45.00 |
| 17 | Concrete walks (0759-0128000J) | SF | 4,300 | $11.00 | $13.50 | $10.00 | $14.00 |
| 18 | 12 inch ductile iron pipe, 5 FT depth (0445-060012AF) | LF | 72 | $280.00 | $311.00 | $340.00 | $250.00 |
| 19 | Sign support footings (0920-0100000A) | CY | 1.10 | $7,272.73 | $10,591 | $15,455 | $10,000 |
| 20 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 430 | $5.81 | $6.51 | $11.63 | $6.98 |
| 21 | Matting, type A (0280-0105010J) | SY | 810 | $4.00 | $2.50 | $2.60 | $2.50 |
| 22 | Flagger station lighting (0223-0168100E) | EACH | 4 | $850.00 | $1,750.00 | $1,700.00 | $1,500.00 |
| 23 | Inlet protection, type 4 (0280-0114040E) | EACH | 2 | $88.00 | $135.00 | $190.00 | $120.00 |
| 24 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $1,000.00 | $950.00 | $5,000.00 |
| 25 | Adjusting boxes (0490-0100000E) | EACH | 8 | $700.00 | $230.00 | $290.00 | $245.00 |
| 26 | Aggregate base (0641-0102000M) | TON | 330 | $71.00 | $46.00 | $46.00 | $118.00 |
| 27 | Valley gutter concrete surfacing (0759-0135000J) | SF | 55 | $26.00 | $49.00 | $33.00 | $55.00 |
| 28 | Bark mulch (1040-0190000K) | CY | 22 | $190.00 | $115.00 | $115.00 | $108.00 |
| 29 | Removal of pipes (0310-0100000F) | LF | 170 | $65.00 | $30.00 | $111.00 | $72.00 |
| 30 | Pedestrian channelizing devices (0228-0141600F) | LF | 280 | $25.00 | $9.50 | $19.00 | $32.00 |
| 31 | Temporary plastic drums (0224-0145000E) | EACH | 29 | $75.00 | $55.00 | $73.00 | $50.00 |
| 32 | Flaggers (0223-0168000T) | HR | 650 | $75.00 | $76.00 | $75.00 | $80.00 |
| 33 | Flashing beacon installation, hall BLVD. at spruce street (0990-0106000A) | EACH | 1 | $42,000 | $51,725 | $58,500 | $48,000 |
| 34 | Cold plane pavement removal, 0 - 2 inches deep (0620-0104000J) | SY | 10 | $55.00 | $280.00 | $175.00 | $220.00 |
| 35 | Catch basins, type 12 inch NDS (0470-0332000E) | EACH | 2 | $3,200.00 | $1,300.00 | $951.00 | $850.00 |
| 36 | Concrete washout facility (0280-0112500E) | EACH | 6 | $200.00 | $450.00 | $850.00 | $300.00 |
| 37 | Traffic control supervisor (0223-0169000E) | EACH | 52 | $900.00 | $475.00 | $850.00 | $250.00 |
| 38 | Temporary signs (0222-0102000J) | SF | 410 | $26.00 | $17.00 | $30.00 | $35.00 |
| 39 | Portable changeable message signs (0222-0164000E) | EACH | 3 | $1,500.00 | $4,200.00 | $1,730.00 | $12,500 |
| 40 | Automated flagger assistance device (0223-0200000E) | EACH | 2 | $1,000.00 | $500.00 | $8,750.00 | $12,500 |
| 41 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $500.00 | $14,500 | $18,500 | $75,000 |
| 42 | Crosswalk closure supports (0902-0101000E) | EACH | 3 | $1,700.00 | $1,600.00 | $1,700.00 | $2,000.00 |
| 43 | Remove existing signs (0905-0100000A) | LS | 1 | $500.00 | $300.00 | $2,000.00 | $500.00 |
| 44 | Removal of fences (0310-0112000A) | LF | 320 | $9.38 | $3.13 | $20.31 | $7.81 |
| 45 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 1 | $3,500.00 | $3,500.00 | $6,240.00 | $3,200.00 |
| 46 | Contaminated soil disposal (0294-0200010M) | TON | 120 | $125.00 | $140.00 | $205.00 | $144.00 |
| 47 | Temporary striping (0225-0153000F) | LF | 440 | $4.00 | $5.00 | $6.05 | $4.50 |
| 48 | Clearing and grubbing (0320-0100000R) | ACRE | 0.20 | $160,000 | $21,000 | $155,000 | $100,000 |
| 49 | Connection to existing structures (0490-0104000E) | EACH | 3 | $1,500.00 | $1,100.00 | $950.00 | $1,500.00 |
| 50 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $3,000.00 | $3,750.00 | $2,000.00 | $2,000.00 |
| 51 | Flashing beacon installation, hall BLVD. at hemlock street (0990-0106000A) | EACH | 1 | $50,000 | $79,750 | $79,000 | $74,000 |
| 52 | Legend removal (0225-0155100J) | SF | 25 | $25.00 | $15.00 | $18.80 | $14.00 |
| 53 | Permanent seeding (1030-0108000R) | ACRE | 0.02 | $250,000 | $123,920 | $125,000 | $115,000 |
| 54 | Bar removal (0225-0156000J) | SF | 32 | $30.00 | $13.00 | $16.10 | $12.00 |
| 55 | Inlet protection, type 3 (0280-0114030E) | EACH | 9 | $85.00 | $90.00 | $68.00 | $120.00 |
| 56 | Pole foundations (0970-0100000A) | EACH | 3 | $2,000.00 | $2,873.33 | $2,866.67 | $2,666.67 |
| 57 | Removal of inlets (0310-0104000E) | EACH | 3 | $1,100.00 | $550.00 | $2,200.00 | $800.00 |
| 58 | Rock mulch (1040-0196000M) | TON | 21 | $155.00 | $95.00 | $96.00 | $98.00 |
| 59 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 9 | $925.00 | $1,000.00 | $1,300.00 | $2,000.00 |
| 60 | Sediment barrier, type 2 (0280-0115020E) | EACH | 10 | $80.00 | $13.00 | $100.00 | $120.00 |
| 61 | Mono-directional white type iar markers (0855-0101100E) | EACH | 20 | $15.00 | $13.00 | $15.00 | $12.00 |
| 62 | Concrete driveways (0759-0126000J) | SF | 430 | $14.00 | $15.00 | $12.00 | $21.00 |
| 63 | Concrete curbs, standard curb (0759-0110000F) | LF | 350 | $44.00 | $49.50 | $38.00 | $61.00 |
| 64 | Thermoplastic, extruded, surface, profiled (0865-0116600F) | LF | 12,500 | $2.00 | $2.00 | $2.00 | $1.65 |
| 65 | Concrete manholes, shallow (0470-0105000E) | EACH | 2 | $1,800.00 | $11,000 | $12,200 | $7,000.00 |
| 66 | Pipe tees, 4 inch (0445-0650000E) | EACH | 6 | $350.00 | $400.00 | $709.00 | $325.00 |
| 67 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 700 | $40.00 | $22.00 | $15.00 | $24.00 |
| 68 | 3 inch PVC pipe, 5 FT depth (0445-052003AF) | LF | 10 | $55.00 | $64.00 | $142.00 | $80.00 |
| 69 | Filling abandoned structures (0490-0117000E) | EACH | 1 | $9,000.00 | $5,000.00 | $15,000 | $1,600.00 |
| 70 | Adjusting inlets (0490-0105000E) | EACH | 1 | $950.00 | $1,050.00 | $6,300.00 | $820.00 |
| 71 | General excavation (0330-0105000K) | CY | 300 | $101.00 | $125.00 | $155.00 | $125.00 |
| 72 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 730 | $5.48 | $6.20 | $13.22 | $9.59 |
| 73 | Pavement bar, type B-HS (0867-0145100J) | SF | 130 | $35.00 | $24.00 | $26.00 | $22.00 |
| 74 | Temporary barricades, type III (0224-0105000E) | EACH | 7 | $155.00 | $110.00 | $370.00 | $150.00 |
| 75 | Temporary barricades, type II (0224-0104000E) | EACH | 11 | $155.00 | $55.00 | $63.00 | $150.00 |
| 76 | Minor adjustment of manholes (0490-0120000E) | EACH | 2 | $1,500.00 | $3,200.00 | $7,500.00 | $1,400.00 |
| 77 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 140 | $365.00 | $245.00 | $190.00 | $266.00 |
| 78 | Concrete inlets, type D (modified) (0470-0312000E) | EACH | 1 | $3,300.00 | $4,000.00 | $11,300 | $3,500.00 |
| 79 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 350 | $60.00 | $76.50 | $60.00 | $61.00 |
| 80 | Straw bale (0280-0119000E) | EACH | 1 | $500.00 | $75.00 | $195.00 | $265.00 |
| 81 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 3 | $500.00 | $610.00 | $666.67 | $566.67 |
| 82 | Sediment barrier, type 3 (0280-0115030F) | LF | 580 | $5.00 | $5.00 | $5.00 | $4.50 |
| 83 | Wood sign posts (0910-0100000K) | FBM | 140 | $30.00 | $32.00 | $36.00 | $20.00 |
| 84 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 8 | $350.00 | $375.00 | $415.00 | $350.00 |
| 85 | Asphalt walks (0749-0114000J) | SF | 140 | $34.00 | $14.00 | $42.00 | $27.00 |
| 86 | Truncated domes on new surfaces (0759-0510000J) | SF | 120 | $33.00 | $40.00 | $33.00 | $37.50 |
| 87 | Temporary walks (0228-0167680J) | SF | 660 | $9.00 | $20.00 | $5.50 | $14.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.