ODOT contract 15617 bid tabulation
I-84: corbett interchange - multnomah falls phase 2. Let by Oregon DOT on October 2, 2025, Region 1. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 02 OCT 2025
- Pay items
- 38
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Temporary water management facility at MP 20.41 (0245-0100000A) | LS | 1 | $8,000.00 | $9,400.00 | $3,300.00 | $15,400 | $53,238 |
| 2 | Railroad flagger services (0223-0170000E) | EACH | 35 | $1,600.00 | $1,725.00 | $1,592.50 | $2,850.00 | $1,549.00 |
| 3 | Bypass pump monitoring (0245-0101000U) | DAY | 15 | $50.00 | $2,025.00 | $256.00 | $3,190.00 | $2,531.00 |
| 4 | Sequential arrow signs (0222-0162000E) | EACH | 4 | $1,200.00 | $1,100.00 | $1,125.00 | $4,210.00 | $825.00 |
| 5 | Temporary water management facility at MP 22.34 (0245-0100000A) | LS | 1 | $7,500.00 | $9,400.00 | $3,300.00 | $1,790.00 | $53,238 |
| 6 | Health and safety plan (0294-0100000A) | LS | 1 | $1,500.00 | $2,830.00 | $4,375.00 | $1,550.00 | $5,000.00 |
| 7 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 5 | $2,200.00 | $2,830.00 | $1,875.00 | $1,900.00 | $4,444.00 |
| 8 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $4,500.00 | $3,350.00 | $3,250.00 | $6,030.00 | $1,478.00 |
| 9 | Temporary water management facility at MP 22.52 (0245-0100000A) | LS | 1 | $7,500.00 | $9,400.00 | $3,300.00 | $15,400 | $53,238 |
| 10 | Cipp liner, 18 inch (0413-0100000F) | LF | 144 | $300.00 | $315.00 | $327.50 | $260.00 | $430.00 |
| 11 | Temporary barricades, type III (0224-0105000E) | EACH | 10 | $225.00 | $102.00 | $218.75 | $845.00 | $98.00 |
| 12 | Contaminated asbestos material disposal (0294-0600000A) | LS | 1 | $20,000 | $11,250 | $24,925 | $6,330.00 | $37,125 |
| 13 | Permanent seeding (1030-0108000R) | ACRE | 1 | $8,500.00 | $6,500.00 | $7,250.00 | $19,000 | $5,902.00 |
| 14 | Pollution control plan (0290-0100000A) | LS | 1 | $1,500.00 | $565.00 | $1,875.00 | $1,550.00 | $5,000.00 |
| 15 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 3 | $1,700.00 | $5,660.00 | $125.00 | $12,500 | $402.00 |
| 16 | Cipp liner, 12 inch (0413-0100000F) | LF | 64 | $525.00 | $545.00 | $558.75 | $405.00 | $863.00 |
| 17 | Temporary plastic drums (0224-0145000E) | EACH | 450 | $72.00 | $28.00 | $10.00 | $60.00 | $37.00 |
| 18 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $10,000 | $15,250 | $11,250 | $9,000.00 | $5,597.00 |
| 19 | Cipp liner, 24 inch (0413-0100000F) | LF | 635 | $275.00 | $297.00 | $301.25 | $230.00 | $408.00 |
| 20 | Check dam, type 2 (0280-0106020E) | EACH | 4 | $250.00 | $365.00 | $406.25 | $1,450.00 | $331.00 |
| 21 | Temporary mulching, straw (0280-0104020R) | ACRE | 1 | $2,000.00 | $3,850.00 | $4,250.00 | $16,000 | $3,460.00 |
| 22 | Remove and reinstall existing guardrail, MP 20.41 (1999-9Z90000A) | LS | 1 | $2,000.00 | $4,500.00 | $1,150.00 | $5,500.00 | $13,228 |
| 23 | Temporary signs (0222-0102000J) | SF | 840 | $32.00 | $29.00 | $23.00 | $25.50 | $15.00 |
| 24 | Contaminated soil disposal (0294-0200010M) | TON | 30.80 | $325.00 | $175.00 | $170.00 | $1,640.00 | $710.00 |
| 25 | Traffic control supervisor (0223-0169000E) | EACH | 35 | $550.00 | $135.00 | $1,100.00 | $2,470.00 | $1,467.00 |
| 26 | Remove and reinstall existing guardrail, MP 22.42 (1999-9Z90000A) | LS | 1 | $2,000.00 | $4,500.00 | $1,150.00 | $5,500.00 | $13,228 |
| 27 | Turbidity monitoring (0290-0200000A) | LS | 1 | $1,500.00 | $1,620.00 | $4,270.00 | $7,840.00 | $5,000.00 |
| 28 | Culvert drainage markers, type 2 (0842-0202000E) | EACH | 9 | $175.00 | $145.00 | $376.00 | $380.00 | $209.00 |
| 29 | Remove and reinstall existing guardrail, MP 22.52 (1999-9Z90000A) | LS | 1 | $2,000.00 | $4,500.00 | $1,150.00 | $5,500.00 | $13,228 |
| 30 | Remove and reinstall existing guardrail, MP 21.34 (1999-9Z90000A) | LS | 1 | $2,000.00 | $4,500.00 | $1,150.00 | $5,500.00 | $26,457 |
| 31 | Loose riprap, class 50 (0390-0105000K) | CY | 38.50 | $425.00 | $252.00 | $510.00 | $1,400.00 | $1,139.00 |
| 32 | Temporary water management facility at MP 21.34 (0245-0100000A) | LS | 1 | $7,500.00 | $9,400.00 | $3,300.00 | $15,400 | $53,238 |
| 33 | Mainline video inspection (0415-0100000F) | LF | 1,686 | $21.00 | $14.00 | $23.00 | $19.00 | $12.00 |
| 34 | Temporary water management facility at MP 22.42 (0245-0100000A) | LS | 1 | $7,500.00 | $9,400.00 | $3,300.00 | $15,400 | $53,238 |
| 35 | Clearing and grubbing (0320-0100000A) | ACRE | 0.50 | $30,000 | $32,500 | $29,400 | $129,600 | $216,710 |
| 36 | General excavation (0330-0105000K) | CY | 33 | $160.00 | $110.00 | $550.00 | $1,140.00 | $741.00 |
| 37 | Riprap geotextile, type 1 (0350-0103000J) | SY | 59 | $15.00 | $2.05 | $13.00 | $110.00 | $12.00 |
| 38 | Remove and reinstall existing guardrail, MP 22.34 (1999-9Z90000A) | LS | 1 | $2,000.00 | $4,500.00 | $1,150.00 | $1,270.00 | $13,228 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of October 2, 2025. Compiled by Mirage Metrics.