ODOT contract 15617 bid tabulation

I-84: corbett interchange - multnomah falls phase 2. Let by Oregon DOT on October 2, 2025, Region 1. 5 bids received.

Owner
Oregon DOT
Letting
02 OCT 2025
Pay items
38
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
ODOT contract 15617: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5
1Temporary water management facility at MP 20.41 (0245-0100000A)LS1$8,000.00$9,400.00$3,300.00$15,400$53,238
2Railroad flagger services (0223-0170000E)EACH35$1,600.00$1,725.00$1,592.50$2,850.00$1,549.00
3Bypass pump monitoring (0245-0101000U)DAY15$50.00$2,025.00$256.00$3,190.00$2,531.00
4Sequential arrow signs (0222-0162000E)EACH4$1,200.00$1,100.00$1,125.00$4,210.00$825.00
5Temporary water management facility at MP 22.34 (0245-0100000A)LS1$7,500.00$9,400.00$3,300.00$1,790.00$53,238
6Health and safety plan (0294-0100000A)LS1$1,500.00$2,830.00$4,375.00$1,550.00$5,000.00
7Soil sample collection and analytical testing (0294-0700000E)EACH5$2,200.00$2,830.00$1,875.00$1,900.00$4,444.00
8Portable changeable message signs (0222-0164000E)EACH2$4,500.00$3,350.00$3,250.00$6,030.00$1,478.00
9Temporary water management facility at MP 22.52 (0245-0100000A)LS1$7,500.00$9,400.00$3,300.00$15,400$53,238
10Cipp liner, 18 inch (0413-0100000F)LF144$300.00$315.00$327.50$260.00$430.00
11Temporary barricades, type III (0224-0105000E)EACH10$225.00$102.00$218.75$845.00$98.00
12Contaminated asbestos material disposal (0294-0600000A)LS1$20,000$11,250$24,925$6,330.00$37,125
13Permanent seeding (1030-0108000R)ACRE1$8,500.00$6,500.00$7,250.00$19,000$5,902.00
14Pollution control plan (0290-0100000A)LS1$1,500.00$565.00$1,875.00$1,550.00$5,000.00
15Repair temporary impact attenuator, truck mounted (0226-0141400E)EACH3$1,700.00$5,660.00$125.00$12,500$402.00
16Cipp liner, 12 inch (0413-0100000F)LF64$525.00$545.00$558.75$405.00$863.00
17Temporary plastic drums (0224-0145000E)EACH450$72.00$28.00$10.00$60.00$37.00
18Temporary impact attenuator, truck mounted (0226-0138000E)EACH2$10,000$15,250$11,250$9,000.00$5,597.00
19Cipp liner, 24 inch (0413-0100000F)LF635$275.00$297.00$301.25$230.00$408.00
20Check dam, type 2 (0280-0106020E)EACH4$250.00$365.00$406.25$1,450.00$331.00
21Temporary mulching, straw (0280-0104020R)ACRE1$2,000.00$3,850.00$4,250.00$16,000$3,460.00
22Remove and reinstall existing guardrail, MP 20.41 (1999-9Z90000A)LS1$2,000.00$4,500.00$1,150.00$5,500.00$13,228
23Temporary signs (0222-0102000J)SF840$32.00$29.00$23.00$25.50$15.00
24Contaminated soil disposal (0294-0200010M)TON30.80$325.00$175.00$170.00$1,640.00$710.00
25Traffic control supervisor (0223-0169000E)EACH35$550.00$135.00$1,100.00$2,470.00$1,467.00
26Remove and reinstall existing guardrail, MP 22.42 (1999-9Z90000A)LS1$2,000.00$4,500.00$1,150.00$5,500.00$13,228
27Turbidity monitoring (0290-0200000A)LS1$1,500.00$1,620.00$4,270.00$7,840.00$5,000.00
28Culvert drainage markers, type 2 (0842-0202000E)EACH9$175.00$145.00$376.00$380.00$209.00
29Remove and reinstall existing guardrail, MP 22.52 (1999-9Z90000A)LS1$2,000.00$4,500.00$1,150.00$5,500.00$13,228
30Remove and reinstall existing guardrail, MP 21.34 (1999-9Z90000A)LS1$2,000.00$4,500.00$1,150.00$5,500.00$26,457
31Loose riprap, class 50 (0390-0105000K)CY38.50$425.00$252.00$510.00$1,400.00$1,139.00
32Temporary water management facility at MP 21.34 (0245-0100000A)LS1$7,500.00$9,400.00$3,300.00$15,400$53,238
33Mainline video inspection (0415-0100000F)LF1,686$21.00$14.00$23.00$19.00$12.00
34Temporary water management facility at MP 22.42 (0245-0100000A)LS1$7,500.00$9,400.00$3,300.00$15,400$53,238
35Clearing and grubbing (0320-0100000A)ACRE0.50$30,000$32,500$29,400$129,600$216,710
36General excavation (0330-0105000K)CY33$160.00$110.00$550.00$1,140.00$741.00
37Riprap geotextile, type 1 (0350-0103000J)SY59$15.00$2.05$13.00$110.00$12.00
38Remove and reinstall existing guardrail, MP 22.34 (1999-9Z90000A)LS1$2,000.00$4,500.00$1,150.00$1,270.00$13,228
ODOT contract 15617: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of October 2, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way