ODOT contract 15631 bid tabulation
Verda ln: dearborn av to ascot lane (keizer). Let by Oregon DOT on December 11, 2025, Region 2. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 11 DEC 2025
- Pay items
- 149
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Stripe removal (0225-0154000F) | LF | 17,601 | $0.89 | $1.00 | $0.90 | $1.05 | $0.85 | $1.00 |
| 2 | Concrete manholes, shallow (0470-0105000E) | EACH | 3 | $5,883.56 | $6,550.00 | $8,300.00 | $7,800.00 | $6,500.00 | $6,300.00 |
| 3 | Water quality planter, A-6-2 (1999-9Z90000A) | LS | 1 | $5,349.00 | $5,975.00 | $12,500 | $11,000 | $9,500.00 | $15,750 |
| 4 | Remove and reinstall cluster box units (1070-0103000E) | EACH | 1 | $177.45 | $795.00 | $500.00 | $17,000 | $371.90 | $900.00 |
| 5 | Pavement bar, type B-HS (0867-0145100J) | SF | 915 | $15.07 | $17.00 | $15.00 | $14.50 | $14.35 | $16.00 |
| 6 | Concrete islands (0759-0122000J) | SF | 77 | $13.99 | $32.80 | $26.50 | $46.00 | $35.00 | $44.00 |
| 7 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 3,150 | $32.35 | $29.50 | $45.00 | $34.00 | $38.00 | $43.50 |
| 8 | General excavation (0330-0105000K) | CY | 2,340 | $21.61 | $28.00 | $41.50 | $51.00 | $45.00 | $35.00 |
| 9 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $8,190.00 | $2,900.00 | $625.00 | $2,500.00 | $1,200.00 | $25,000 |
| 10 | Temporary pavement bars (0225-0153200J) | SF | 152 | $7.35 | $8.30 | $7.25 | $7.50 | $7.00 | $8.00 |
| 11 | Extra for asphalt approaches (0749-0100000E) | EACH | 31 | $577.50 | $904.00 | $950.00 | $925.00 | $550.00 | $550.00 |
| 12 | Water quality structure, station SD 10+79.30, 26.23’ right (1010-0100000A) | LS | 1 | $28,295 | $33,800 | $31,500 | $30,000 | $35,000 | $32,600 |
| 13 | Water quality planter, B-8 (1999-9Z90000A) | LS | 1 | $6,353.97 | $6,850.00 | $12,000 | $11,750 | $11,000 | $16,900 |
| 14 | Flaggers (0223-0168000T) | HR | 1,880 | $68.00 | $91.79 | $77.00 | $82.00 | $74.00 | $87.00 |
| 15 | Asphalt pavement sawcutting, six inches deep (0310-0119100F) | LF | 5,810 | $1.46 | $1.40 | $1.85 | $3.50 | $2.25 | $2.50 |
| 16 | Removal of surfacings (0310-0103000J) | SY | 300 | $13.25 | $3.88 | $15.50 | $11.00 | $22.00 | $9.00 |
| 17 | Sediment barrier, type 4 (0280-0115040E) | EACH | 25 | $49.39 | $33.35 | $22.00 | $85.00 | $25.00 | $25.00 |
| 18 | Water quality planter, C-4 (1999-9Z90000A) | LS | 1 | $7,144.62 | $14,700 | $12,850 | $12,750 | $11,000 | $17,900 |
| 19 | Temporary curb ramp, parallel to curb (0228-0167670E) | EACH | 5 | $418.26 | $5,800.00 | $665.00 | $2,000.00 | $5,000.00 | $2,750.00 |
| 20 | Shrubs, #1 container (1040-0153000E) | EACH | 1,744 | $5.25 | $5.90 | $5.00 | $5.00 | $5.00 | $13.50 |
| 21 | Lawn seeding (1030-0138000R) | ACRE | 1 | $8,400.00 | $9,500.00 | $8,300.00 | $8,000.00 | $8,000.00 | $22,000 |
| 22 | Water quality planter, D-7 (1999-9Z90000A) | LS | 1 | $9,714.30 | $9,600.00 | $20,000 | $19,500 | $15,000 | $22,200 |
| 23 | Concrete curbs, standard curb, modified (0759-0112000F) | LF | 16 | $196.88 | $125.00 | $80.00 | $44.00 | $110.00 | $102.00 |
| 24 | Water quality planter, D-9-1 (1999-9Z90000A) | LS | 1 | $4,269.15 | $5,350.00 | $9,600.00 | $9,000.00 | $9,000.00 | $12,400 |
| 25 | Water quality planter, D-3 (1999-9Z90000A) | LS | 1 | $4,178.59 | $5,000.00 | $9,000.00 | $8,500.00 | $8,000.00 | $12,000 |
| 26 | Water quality planter, A-1 (1999-9Z90000A) | LS | 1 | $3,807.89 | $4,750.00 | $8,600.00 | $7,700.00 | $7,500.00 | $11,250 |
| 27 | Bark mulch (1040-0190000K) | CY | 32 | $57.75 | $65.50 | $57.00 | $56.00 | $60.00 | $74.00 |
| 28 | Mailbox concrete collars (1070-0102000E) | EACH | 1 | $2,635.50 | $119.00 | $1,550.00 | $750.00 | $100.00 | $115.00 |
| 29 | Single mailbox supports (1070-0100000E) | EACH | 6 | $606.55 | $536.25 | $260.00 | $900.00 | $450.00 | $500.00 |
| 30 | Valley gutter concrete surfacing (0759-0135000J) | SF | 200 | $10.84 | $25.40 | $37.00 | $42.00 | $22.00 | $29.00 |
| 31 | BI-directional yellow type iar markers (0855-0103100E) | EACH | 99 | $8.93 | $10.00 | $9.00 | $8.50 | $8.50 | $9.50 |
| 32 | Removing and rebuilding fence (1050-0240000F) | LF | 19 | $52.50 | $59.50 | $217.00 | $210.00 | $120.00 | $85.00 |
| 33 | Water quality planter, D-10 (1999-9Z90000A) | LS | 1 | $10,186 | $13,250 | $20,000 | $19,750 | $16,000 | $23,100 |
| 34 | Crosswalk closure supports (0902-0101000E) | EACH | 3 | $843.85 | $1,430.00 | $1,350.00 | $1,300.00 | $1,200.00 | $1,350.00 |
| 35 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 13 | $420.00 | $475.00 | $415.00 | $400.00 | $400.00 | $450.00 |
| 36 | Water quality planter, A-4 (1999-9Z90000A) | LS | 1 | $12,741 | $16,650 | $23,000 | $26,000 | $19,000 | $27,700 |
| 37 | Water quality planter, A-3-1 (1999-9Z90000A) | LS | 1 | $2,711.22 | $3,900.00 | $7,000.00 | $6,400.00 | $6,000.00 | $9,500.00 |
| 38 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 13 | $472.50 | $536.00 | $465.00 | $450.00 | $450.00 | $510.00 |
| 39 | Aggregate base (0641-0102000M) | TON | 3,500 | $36.02 | $35.92 | $34.50 | $40.00 | $52.00 | $79.00 |
| 40 | Temporary striping (0225-0153000F) | LF | 17,380 | $0.37 | $0.40 | $0.40 | $0.56 | $0.35 | $0.40 |
| 41 | Temporary barricades, type III (0224-0105000E) | EACH | 9 | $218.75 | $178.75 | $220.00 | $280.00 | $202.00 | $50.00 |
| 42 | Automated flagger assistance device (0223-0200000E) | EACH | 4 | $4,125.00 | $7,000.00 | $1,320.00 | $8,000.00 | $6,001.00 | $1,100.00 |
| 43 | Retaining wall, prefabricated modular gravity (0596-B002000A) | SF | 495 | $59.36 | $95.05 | $101.01 | $115.15 | $64.65 | $54.55 |
| 44 | Adjusting inlets (0490-0105000E) | EACH | 5 | $124.74 | $660.00 | $1,000.00 | $2,300.00 | $1,500.00 | $1,700.00 |
| 45 | Water quality planter, C-9 (1999-9Z90000A) | LS | 1 | $5,800.33 | $6,400.00 | $13,000 | $11,750 | $11,000 | $16,600 |
| 46 | Weed control (1030-0101000R) | ACRE | 3 | $4,200.00 | $4,750.00 | $4,150.00 | $4,000.00 | $4,000.00 | $1,000.00 |
| 47 | Water quality planter, C-6 (1999-9Z90000A) | LS | 1 | $3,266.91 | $7,150.00 | $7,800.00 | $7,000.00 | $6,000.00 | $10,400 |
| 48 | Water quality planter, B-3 (1999-9Z90000A) | LS | 1 | $6,008.84 | $6,800.00 | $13,385 | $11,750 | $11,000 | $16,800 |
| 49 | Water quality planter, C-8 (1999-9Z90000A) | LS | 1 | $3,355.22 | $4,050.00 | $7,000.00 | $7,300.00 | $6,000.00 | $10,800 |
| 50 | Switching, conduit, and wiring (0970-0105000A) | LF | 30 | $2.45 | $2.78 | $77.67 | $325.00 | $100.00 | $85.00 |
| 51 | Water quality planter, D-5 (1999-9Z90000A) | LS | 1 | $4,182.06 | $5,000.00 | $9,000.00 | $8,500.00 | $8,000.00 | $11,900 |
| 52 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $1,474.20 | $10,000 | $2,900.00 | $3,000.00 | $8,400.00 | $9,500.00 |
| 53 | Legend removal (0225-0155100J) | SF | 32 | $21.00 | $23.80 | $20.75 | $22.00 | $21.00 | $23.00 |
| 54 | Temporary mulching, hydromulch (0280-0104010R) | ACRE | 0.25 | $8,400.00 | $9,500.00 | $8,300.00 | $8,100.00 | $8,000.00 | $6,800.00 |
| 55 | Matting, type E (0280-0105050J) | SY | 956 | $1.88 | $4.75 | $4.00 | $4.00 | $4.00 | $7.00 |
| 56 | 10 inch PVC pipe, 5 FT depth (0445-052010AF) | LF | 133 | $89.52 | $91.60 | $130.00 | $155.00 | $140.00 | $126.00 |
| 57 | Concrete storm sewer manholes (0470-0101000E) | EACH | 5 | $5,983.78 | $8,000.00 | $8,250.00 | $7,200.00 | $8,000.00 | $6,800.00 |
| 58 | Deciduous trees, 2 inch caliper (1040-0130000E) | EACH | 54 | $147.00 | $166.00 | $145.00 | $140.00 | $150.00 | $740.00 |
| 59 | Root barrier (1040-0206000F) | LF | 1,200 | $15.75 | $17.90 | $15.50 | $15.00 | $15.00 | $13.00 |
| 60 | Water quality planter, B-6 (1999-9Z90000A) | LS | 1 | $2,574.48 | $3,785.00 | $5,200.00 | $6,250.00 | $5,000.00 | $7,400.00 |
| 61 | 6 inch drain pipe (0430-0100060F) | LF | 209 | $45.08 | $63.60 | $32.50 | $126.00 | $90.00 | $90.00 |
| 62 | 8 inch concrete surfacing (0759-0142000J) | SF | 6,310 | $14.09 | $11.90 | $16.75 | $12.25 | $14.00 | $14.00 |
| 63 | Concrete walks (0759-0128000J) | SF | 9,550 | $9.13 | $9.30 | $9.00 | $10.25 | $10.50 | $14.00 |
| 64 | Water quality planter, D-1 (1999-9Z90000A) | LS | 1 | $10,294 | $11,850 | $20,650 | $19,750 | $16,000 | $25,700 |
| 65 | Health and safety plan (0294-0100000A) | LS | 1 | $187.50 | $1,300.00 | $625.00 | $2,000.00 | $1,100.00 | $2,500.00 |
| 66 | Contaminated soil disposal (0294-0200010M) | TON | 1,328 | $124.14 | $79.50 | $73.00 | $97.00 | $100.00 | $78.00 |
| 67 | Clearing and grubbing (0320-0100000A) | ACRE | 1 | $4,992.75 | $20,400 | $22,000 | $50,000 | $15,000 | $95,000 |
| 68 | Inlet protection, type 3 (0280-0114030E) | EACH | 10 | $30.66 | $59.50 | $90.00 | $115.00 | $120.00 | $75.00 |
| 69 | 12 inch storm sewer pipe, 10 FT depth (0445-035012BF) | LF | 1,292 | $118.16 | $96.75 | $98.00 | $173.00 | $135.00 | $165.00 |
| 70 | Concrete driveways (0759-0126000J) | SF | 13,000 | $12.13 | $14.50 | $12.00 | $15.00 | $14.00 | $12.00 |
| 71 | Concrete walks, modified (0759-0128000J) | SF | 16,700 | $9.18 | $13.24 | $12.75 | $11.00 | $13.00 | $11.50 |
| 72 | Water quality planter, D-6 (1999-9Z90000A) | LS | 1 | $4,366.05 | $5,690.00 | $9,200.00 | $9,750.00 | $9,000.00 | $12,900 |
| 73 | Water quality planter, D-4 (1999-9Z90000A) | LS | 1 | $4,823.00 | $5,850.00 | $11,700 | $10,250 | $10,000 | $15,500 |
| 74 | Water quality planter, A-7 (1999-9Z90000A) | LS | 1 | $3,787.08 | $4,550.00 | $8,850.00 | $8,000.00 | $8,500.00 | $11,500 |
| 75 | Water quality planter, A-6-1 (1999-9Z90000A) | LS | 1 | $3,459.42 | $4,450.00 | $8,500.00 | $7,500.00 | $7,000.00 | $11,000 |
| 76 | Pavement legend, type B-HS: "xing" (0867-0153100E) | EACH | 2 | $1,312.50 | $1,500.00 | $1,300.00 | $1,300.00 | $1,250.00 | $1,400.00 |
| 77 | Remove existing signs (0905-0100000A) | LS | 1 | $1,145.55 | $1,490.00 | $310.00 | $500.00 | $1,250.00 | $1,450.00 |
| 78 | Water quality planter, A-8 (1999-9Z90000A) | LS | 1 | $6,048.79 | $7,350.00 | $13,500 | $11,500 | $9,500.00 | $17,400 |
| 79 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 274 | $11.43 | $119.00 | $44.00 | $30.00 | $30.00 | $55.00 |
| 80 | PG 64-22 asphalt in level 3, 1/2 inch ACP (0745-0620000M) | TON | 160 | $1.05 | $1.20 | $0.10 | $1.00 | $1.00 | $1.00 |
| 81 | Catch basins, type 1 with sump (0470-0332000E) | EACH | 5 | $2,083.95 | $4,450.00 | $3,650.00 | $5,000.00 | $4,000.00 | $3,375.00 |
| 82 | Sediment barrier, type 3 (0280-0115030F) | LF | 4,500 | $2.51 | $4.77 | $5.65 | $4.75 | $4.00 | $4.00 |
| 83 | Sediment fence (0280-0113000F) | LF | 200 | $3.88 | $3.57 | $4.60 | $3.50 | $3.50 | $4.00 |
| 84 | Compost erosion blanket (0280-0105100J) | SY | 1,011 | $3.68 | $4.10 | $3.65 | $3.50 | $3.50 | $5.00 |
| 85 | Irrigation system (1120-0100000A) | LS | 1 | $115,712 | $90,000 | $80,000 | $90,000 | $80,000 | $75,000 |
| 86 | Temporary signs (0222-0102000J) | SF | 795 | $22.17 | $20.25 | $28.00 | $28.00 | $35.00 | $20.00 |
| 87 | Temporary plastic drums (0224-0145000E) | EACH | 24 | $52.50 | $47.50 | $80.00 | $75.00 | $40.00 | $20.00 |
| 88 | 8 inch PVC pipe, 5 FT depth (0445-052008AF) | LF | 18 | $131.13 | $127.03 | $98.00 | $160.00 | $120.00 | $185.00 |
| 89 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 2 | $487.20 | $1,430.00 | $650.00 | $3,800.00 | $3,500.00 | $2,775.00 |
| 90 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,317 | $4.19 | $8.66 | $5.83 | $5.69 | $7.29 | $8.05 |
| 91 | Thermoplastic, extruded, surface, non-profiled (0865-0116610F) | LF | 17,380 | $1.37 | $1.55 | $1.30 | $1.75 | $1.30 | $1.50 |
| 92 | Level 3, 1/2 inch ACP (0745-0302000M) | TON | 2,670 | $107.61 | $115.38 | $98.50 | $99.00 | $110.00 | $94.00 |
| 93 | Concrete curbs, standard curb (0759-0110000F) | LF | 160 | $26.18 | $77.75 | $48.00 | $31.00 | $43.00 | $61.00 |
| 94 | Mono-directional white type iar markers (0855-0101100E) | EACH | 5 | $8.93 | $10.00 | $9.00 | $8.50 | $8.50 | $9.50 |
| 95 | River rock mulch (1040-0196000M) | TON | 72 | $89.25 | $101.00 | $88.00 | $85.00 | $90.00 | $284.00 |
| 96 | Water quality planter, A-2 (1999-9Z90000A) | LS | 1 | $9,639.46 | $11,250 | $16,875 | $18,200 | $15,000 | $20,000 |
| 97 | Water quality planter, C-7 (1999-9Z90000A) | LS | 1 | $2,749.20 | $3,500.00 | $5,500.00 | $6,200.00 | $5,000.00 | $7,400.00 |
| 98 | Water quality planter, D-9-2 (1999-9Z90000A) | LS | 1 | $4,061.34 | $5,000.00 | $9,300.00 | $8,800.00 | $8,000.00 | $11,700 |
| 99 | Catch basins, type area drain (0470-0332000E) | EACH | 2 | $2,886.56 | $1,600.00 | $3,100.00 | $3,600.00 | $3,000.00 | $3,585.00 |
| 100 | 4 inch PVC pipe, 5 FT depth (0445-052004AF) | LF | 18 | $61.36 | $67.00 | $75.00 | $150.00 | $100.00 | $105.00 |
| 101 | 6 inch storm sewer pipe, 5 FT depth (0445-035006AF) | LF | 1,093 | $61.67 | $53.40 | $72.50 | $76.00 | $90.00 | $83.00 |
| 102 | Pollution control plan (0290-0100000A) | LS | 1 | $187.50 | $1,300.00 | $625.00 | $1,000.00 | $1,100.00 | $2,500.00 |
| 103 | Straw bale (0280-0119000E) | EACH | 3 | $15.75 | $59.50 | $58.00 | $110.00 | $100.00 | $75.00 |
| 104 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 767 | $3.42 | $8.60 | $6.52 | $6.52 | $7.20 | $8.15 |
| 105 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $3,238.20 | $10,050 | $48,500 | $54,000 | $35,000 | $85,000 |
| 106 | Subgrade geotextile (0350-0105000J) | SY | 3,600 | $0.36 | $1.93 | $1.40 | $1.25 | $2.20 | $2.50 |
| 107 | 8 inch storm sewer pipe, 5 FT depth (0445-035008AF) | LF | 220 | $66.07 | $57.60 | $82.00 | $77.00 | $120.00 | $88.00 |
| 108 | Remove and reinstall mailbox supports (1070-0103000E) | EACH | 2 | $379.05 | $715.00 | $1,550.00 | $1,600.00 | $550.00 | $900.00 |
| 109 | Water quality planter, B-11 (1999-9Z90000A) | LS | 1 | $6,510.04 | $8,160.00 | $14,300 | $13,250 | $11,000 | $18,600 |
| 110 | Water quality planter, B-9 (1999-9Z90000A) | LS | 1 | $4,266.52 | $5,100.00 | $11,000 | $8,600.00 | $8,500.00 | $13,400 |
| 111 | Water quality planter, C-2 (1999-9Z90000A) | LS | 1 | $3,389.18 | $4,400.00 | $8,600.00 | $7,800.00 | $7,000.00 | $10,800 |
| 112 | 10 inch drain pipe (0430-0100100F) | LF | 63 | $93.28 | $77.25 | $52.00 | $160.00 | $130.00 | $135.00 |
| 113 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 3 | $4,551.79 | $4,900.00 | $3,900.00 | $3,400.00 | $4,000.00 | $3,500.00 |
| 114 | Concrete curbs, curb and gutter, modified (0759-0105000F) | LF | 2,170 | $35.54 | $67.00 | $66.00 | $58.00 | $67.00 | $54.00 |
| 115 | Connection to existing structures (0490-0104000E) | EACH | 2 | $1,087.80 | $1,800.00 | $1,669.28 | $2,700.00 | $1,000.00 | $2,500.00 |
| 116 | Multiple mailbox supports (1070-0101000E) | EACH | 6 | $1,026.55 | $1,700.00 | $777.00 | $1,500.00 | $1,400.00 | $1,550.00 |
| 117 | Pedestrian channelizing devices (0228-0141600F) | LF | 192 | $20.00 | $20.25 | $15.00 | $40.00 | $25.00 | $20.00 |
| 118 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 9,850 | $4.69 | $5.54 | $2.15 | $6.00 | $2.20 | $5.50 |
| 119 | Minor adjustment of manholes (0490-0120000E) | EACH | 2 | $374.85 | $780.00 | $2,750.00 | $1,500.00 | $1,500.00 | $1,750.00 |
| 120 | Temporary barricades, type II (0224-0104000E) | EACH | 32 | $81.25 | $71.50 | $97.00 | $85.00 | $101.00 | $25.00 |
| 121 | Water quality planter, B-4 (1999-9Z90000A) | LS | 1 | $3,989.54 | $4,890.00 | $8,900.00 | $8,500.00 | $8,000.00 | $11,800 |
| 122 | Manhole slope protectors (0470-0330000E) | EACH | 1 | $3,834.45 | $6,400.00 | $4,000.00 | $3,750.00 | $3,500.00 | $2,700.00 |
| 123 | Flashing beacon installation, verda LN. at alder DR. (0990-0106000A) | EACH | 1 | $25,935 | $29,400 | $26,650 | $26,000 | $30,000 | $29,000 |
| 124 | Shrubs, #SP5 container (1040-0152020E) | EACH | 4,945 | $3.15 | $3.50 | $3.00 | $3.00 | $3.00 | $8.00 |
| 125 | Water quality planter, D-2 (1999-9Z90000A) | LS | 1 | $3,871.09 | $4,450.00 | $8,500.00 | $7,800.00 | $7,000.00 | $11,300 |
| 126 | Pavement legend, type B-HS: "school" (0867-0111100E) | EACH | 2 | $1,522.50 | $1,700.00 | $1,500.00 | $1,450.00 | $1,450.00 | $1,650.00 |
| 127 | Concrete washout facility (0280-0112500E) | EACH | 5 | $187.50 | $169.00 | $525.00 | $800.00 | $1,000.00 | $1,100.00 |
| 128 | Rock mulch (1040-0196000M) | TON | 11 | $89.25 | $101.00 | $88.00 | $85.00 | $90.00 | $284.00 |
| 129 | Mainline video inspection (0415-0100000F) | LF | 1,324 | $3.27 | $4.90 | $9.00 | $10.00 | $9.00 | $10.00 |
| 130 | Water quality planter, B-5 (1999-9Z90000A) | LS | 1 | $3,786.73 | $4,690.00 | $8,600.00 | $8,000.00 | $8,500.00 | $11,400 |
| 131 | Water quality planter, A-5 (1999-9Z90000A) | LS | 1 | $12,687 | $14,450 | $28,000 | $24,000 | $20,000 | $36,600 |
| 132 | Pole foundations (0970-0100000A) | EACH | 1 | $3,504.90 | $4,000.00 | $1,915.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 133 | Temporary flexible pavement markers (0225-0149000E) | EACH | 1,258 | $3.51 | $0.85 | $2.45 | $2.00 | $2.50 | $1.50 |
| 134 | Pilot cars (0223-0172000T) | HR | 180 | $101.14 | $115.00 | $92.00 | $150.00 | $82.00 | $105.00 |
| 135 | Water quality planter, B-10 (1999-9Z90000A) | LS | 1 | $9,684.89 | $11,050 | $19,800 | $19,000 | $15,000 | $25,000 |
| 136 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 207 | $20.68 | $28.60 | $31.00 | $31.00 | $24.00 | $27.00 |
| 137 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $5,808.06 | $1,190.00 | $10,000 | $15,000 | $19,500 | $22,000 |
| 138 | Water quality planter, C-3 (1999-9Z90000A) | LS | 1 | $14,765 | $17,050 | $28,180 | $27,250 | $21,000 | $35,500 |
| 139 | Water quality planter, B-2 (1999-9Z90000A) | LS | 1 | $3,150.94 | $4,000.00 | $7,920.00 | $7,200.00 | $6,000.00 | $10,700 |
| 140 | 10 inch storm sewer pipe, 5 FT depth (0445-035010AF) | LF | 202 | $81.00 | $69.90 | $94.00 | $205.00 | $110.00 | $145.00 |
| 141 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 32 | $128.17 | $80.00 | $110.00 | $195.00 | $110.00 | $195.00 |
| 142 | 3 inch PVC pipe, 5 FT depth (0445-052003AF) | LF | 60 | $67.99 | $50.00 | $58.00 | $58.00 | $55.00 | $45.00 |
| 143 | Topsoil (1040-0101000K) | CY | 150 | $45.15 | $51.24 | $44.50 | $44.00 | $45.00 | $68.00 |
| 144 | Water quality structure, station. SD 10+88.15, 14.71’ left (1010-0100000A) | LS | 1 | $26,203 | $31,500 | $29,650 | $28,000 | $28,000 | $30,200 |
| 145 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $3,150.00 | $8,350.00 | $12,000 | $12,000 | $7,000.00 | $1,300.00 |
| 146 | Flagger station lighting (0223-0168100E) | EACH | 4 | $3,707.70 | $710.00 | $1,450.00 | $4,500.00 | $4,500.00 | $650.00 |
| 147 | Sign support footings (0920-0100000A) | CY | 2.25 | $2,180.27 | $2,766.67 | $7,777.78 | $7,555.56 | $2,322.22 | $2,622.22 |
| 148 | Water quality planter, A-3-2 (1999-9Z90000A) | LS | 1 | $7,110.91 | $7,950.00 | $16,650 | $14,000 | $13,000 | $20,700 |
| 149 | Plastic sheeting (0280-0101000J) | SY | 100 | $1.44 | $14.65 | $3.50 | $5.75 | $5.00 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of December 11, 2025. Compiled by Mirage Metrics.