ODOT contract 15634 bid tabulation

Us101: culverts (mp 73.46 - 136.29). Let by Oregon DOT on December 18, 2025, Region 2. 6 bids received.

Owner
Oregon DOT
Letting
18 DEC 2025
Pay items
61
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
6
ODOT contract 15634: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5Rank 6
1Temporary signs (0222-0102000J)SF730$22.00$32.00$51.00$14.85$41.00$65.00
224 inch culvert pipe, 10 FT depth (0445-010024BF)LF51$300.00$756.00$370.00$752.41$840.00$510.00
3Facility field markers, type S1 red (0842-0102001E)EACH1$210.00$60.00$370.00$140.25$170.00$210.00
4Bar removal (0225-0156000J)SF24$7.00$7.00$8.00$75.00$25.00$45.00
5Portable changeable message signs (0222-0164000E)EACH2$7,000.00$15,000$7,520.00$9,112.50$7,280.00$19,900
6Flaggers (0223-0168000T)HR1,000$88.00$97.50$115.00$105.00$90.00$105.00
7Temporary barricades, type II (0224-0104000E)EACH4$90.00$100.00$750.00$89.09$60.00$275.00
8Temporary water management facility at station "RW4" 855+63 (0245-0100000A)LS1$36,000$100,000$16,500$8,330.58$28,000$174,500
9Thermoplastic, extruded, surface, non-profiled (0865-0116610F)LF2,600$2.30$2.30$2.70$9.79$3.00$7.00
10Embankment in place (0330-0123000K)CY5$402.00$324.00$670.00$38.00$320.00$400.00
11Loose riprap, class 100 (0390-0108000K)CY8$192.00$540.00$280.00$250.00$1,230.00$600.00
12Ditch excavation (0330-0101000K)CY9$222.00$270.00$200.00$38.00$430.00$255.00
13Removing and rebuilding fence (1050-0240000F)LF10$125.00$200.00$320.00$150.00$100.00$300.00
14Culvert drainage markers, type 1 (0842-0201000E)EACH16$275.00$86.00$175.00$125.00$150.00$200.00
15Contaminated soil disposal (0294-0200010M)TON115$125.00$150.00$1,190.00$450.00$190.00$160.00
16Temporary plastic drums (0224-0145000E)EACH12$45.00$45.00$735.00$150.00$45.82$95.00
17Automated flagger assistance device (0223-0200000E)EACH2$4,000.00$2,700.00$7,870.00$4,500.00$5,600.00$19,500
18Concrete inlets, type D (0470-0311000E)EACH7$15,000$5,400.00$7,900.00$2,173.75$8,240.00$5,100.00
19Filling abandoned structures (0490-0117000E)EACH1$10,000$4,800.00$6,610.00$8,500.00$4,990.00$4,900.00
20Mainline video inspection (0415-0100000F)LF1,201$10.00$9.50$45.00$22.00$10.00$95.00
21Temporary water management facility at station "RW6" 510+90 (0245-0100000A)LS1$20,000$24,000$9,490.00$14,438$28,000$36,500
22Paved culvert end slopes (0460-0100000J)SF464$90.00$64.80$74.50$44.75$210.00$70.00
23Segregate and stockpile contaminated soil (0294-0600000A)LS1$20,000$6,000.00$34,100$1,500.00$21,800$6,000.00
24Facility field markers, type S2 (0842-0103001E)EACH1$210.00$250.00$440.00$140.25$170.00$210.00
25Compost erosion blanket (0280-0105100J)SY328$6.00$6.00$30.00$3.63$6.00$7.00
26Matting, type E (0280-0105050J)SY328$11.00$11.00$23.50$5.80$11.00$12.00
27Sloped end sections, 18 inch (0445-0700180E)EACH13$1,200.00$2,160.00$4,930.00$1,348.50$2,890.00$2,100.00
28Temporary pavement bars (0225-0153200J)SF24$7.00$7.00$8.00$75.00$25.00$95.00
29Flagger station lighting (0223-0168100E)EACH2$2,500.00$2,500.00$4,730.00$2,615.63$5,350.00$24,600
30Temporary water management facility at station "RW5" 567+19 (0245-0100000A)LS1$20,000$22,000$13,500$12,244$28,000$33,000
31Permanent seeding (1030-0108000R)ACRE0.30$24,000$23,500$31,900$36,250$23,900$36,450
32Straw bale (0280-0119000E)EACH4$25.00$50.00$280.00$28.00$22.00$55.00
33Turbidity monitoring (0290-0200000A)LS1$15,000$1,500.00$7,180.00$1,250.00$1.00$3,750.00
3418 inch culvert pipe, 10 FT depth (0445-010018BF)LF530$250.00$540.00$365.00$630.66$710.00$420.00
35Rehabilitate, 18 inch X 18 inch pipe, sta. "RW" 491+10.00 (0410-0100000F)LF58$445.00$847.00$525.00$490.00$830.00$650.00
3618 inch culvert pipe, 5 FT depth (0445-010018AF)LF10$500.00$1,080.00$625.00$550.00$1,570.00$510.00
37Bypass pump monitoring (0245-0101000U)DAY12$1,900.00$1,300.00$345.00$850.00$1,500.00$2,105.00
38Check dam, type 3 (0280-0106030E)EACH5$165.00$165.00$585.00$250.00$210.00$170.00
39Rehabilitate, 36 inch X 36 inch pipe (0410-0100000F)LF172$400.00$445.00$410.00$682.50$540.00$550.00
40Rehabilitate, 18 inch X 18 inch pipe, sta. "6B" 1107+38.28 (0410-0100000F)LF26$760.00$639.00$890.00$686.00$1,610.00$950.00
41Clearing and grubbing (0320-0100000A)ACRE0.50$90,000$130,000$39,000$17,000$39,400$75,000
42Facility field markers, type S1 green (0842-0101001E)EACH1$210.00$60.00$370.00$140.25$170.00$210.00
43Sediment barrier, type 3 (0280-0115030F)LF240$6.50$6.50$21.50$20.30$15.00$7.00
44Culvert drainage markers, type 2 (0842-0202000E)EACH16$210.00$220.00$440.00$319.00$170.00$300.00
45Trench resurfacing (0495-0100000J)SY197$250.00$512.00$175.00$274.95$370.00$550.00
46Check dam, type 6 (0280-0106060E)EACH3$430.00$430.00$940.00$358.00$410.00$431.00
47Repair temporary impact attenuator, truck mounted (0226-0141400E)EACH1$1.00$10.00$1.00$1,620.00$1,020.00$1.00
48Rehabilitate, 18 inch X 18 inch pipe, sta. "6B" 1107+38.00 (0410-0100000F)LF47$410.00$576.00$635.00$476.00$880.00$650.00
49Temporary impact attenuator, truck mounted (0226-0138000E)EACH1$15,000$10,000$22,300$11,340$16,900$31,750
50Asphalt pavement sawcutting, 8 inches deep (0310-0119100F)LF696$12.00$20.00$9.00$10.90$8.00$25.00
51Temporary water management facility at station "RW" 483+69.5 (0245-0100000A)LS1$7,500.00$25,000$12,700$13,253$28,000$30,000
52Temporary type 1 fence (0270-0100000F)LF47$40.00$55.00$23.00$5.80$51.00$60.00
53Removal of pipes (0310-0100000F)LF192$52.00$75.00$57.50$45.00$93.00$85.00
54Temporary transverse rumble strips, portable (0225-0153810F)LF132$40.00$125.00$250.00$135.00$10.00$350.00
55Sloped end sections, 24 inch (0445-0700240E)EACH2$1,200.00$2,160.00$6,440.00$1,972.00$4,260.00$2,100.00
56Water quality swale, D00486 (1012-0100000A)LS1$25,000$34,000$25,100$28,500$12,900$43,500
57Matting, type C (0280-0105030J)SY60$10.00$10.00$21.50$3.26$1.00$11.00
58Pollution control plan (0290-0100000A)LS1$2,500.00$500.00$3,230.00$5,200.00$1.00$3,760.00
59Lead compliance plan (0294-0500000A)LS1$2,500.00$1,500.00$8,550.00$5,200.00$1,500.00$4,970.00
60Temporary water management facility at station "RW8" 469+85 (0245-0100000A)LS1$20,000$66,000$25,200$28,500$28,000$84,300
61Temporary barricades, type III (0224-0105000E)EACH4$180.00$180.00$850.00$245.00$150.00$300.00
ODOT contract 15634: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy