ODOT contract 15640 bid tabulation

I-5:n umpqua r & corp nb & sb bridges (winchester). Let by Oregon DOT on January 15, 2026, Region 3. 7 bids received.

Owner
Oregon DOT
Letting
15 JAN 2026
Pay items
67
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
6
7
ODOT contract 15640: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5Rank 6
1Replace surface mounted tubular markers (0224-0143000E)EACH21$70.00$125.00$50.00$185.00$200.00$292.00
2Reflective barrier panels (0226-0141100E)EACH1,868$15.00$27.50$10.00$15.00$10.00$15.00
3Precompressed foam silicone joint seal (0585-0215000A)LF164$91.46$96.95$91.46$73.17$91.46$89.02
4Precompressed foam silicone joint seal (0585-0215000A)LF148$101.35$97.30$94.59$74.32$101.35$91.22
5Amg cold plane pavement removal (0621-0100000J)SY3,425$9.00$15.30$7.00$20.00$5.00$24.80
6Delineators, type 1 (0840-0100000E)EACH6$90.00$90.00$100.00$150.00$100.00$150.00
7Mono-directional white type iar markers, recessed (0855-0106100E)EACH20$35.00$35.00$35.00$35.00$40.00$35.00
8Permanent reflective barrier panels (1999-9Z90000E)EACH110$32.00$38.80$20.00$20.00$30.00$38.80
9Constructing elastomeric concrete nosing (0584-0104000J)SF371$75.00$137.00$110.00$105.00$125.00$134.00
10Temporary work access system (0253-0106000A)LS1$10,000$60,000$40,000$2,500.00$5,000.00$7,500.00
11Temporary work access system (0253-0106000A)LS1$10,000$55,000$40,000$5,000.00$5,000.00$7,500.00
12Repair temporary impact attenuator, truck mounted (0226-0141400E)EACH4$1,000.00$13.63$0.01$150.00$1.00$6,460.00
13Level 4, 1/2 inch ACP (0745-0402000M)TON436$185.00$184.00$150.00$184.00$185.00$184.00
14Continuous rumble strips (0857-0101000L)MI0.11$35,000$35,000$20,000$35,000$40,000$75,000
15Temporary barrier (0226-0126100F)LF21,200$12.50$1.00$0.01$6.25$5.00$12.50
16Pollution control plan (0290-0100000A)LS1$2,000.00$746.00$2,000.00$500.00$500.00$5,960.00
17Aggregate shoulders (0640-0101000M)TON35$149.00$171.00$100.00$140.00$145.00$578.00
18Bridge removal work (0501-0100000A)SF10$2,000.00$12,681$2,500.00$300.00$2,500.00$7,770.00
19Gap pattern rumble strips (0857-0101500L)MI0.11$35,000$35,000$20,000$35,000$40,000$75,000
20Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J)SY2,332$10.00$30.90$30.00$60.00$11.50$39.30
21Pavement marking tape, grooved, patterned, wet weather, with black contrast (0865-0127100F)LF4,090$10.60$10.60$10.50$10.60$11.00$10.60
22Type "F" concrete rail, rectangular tube retrofit (0587-0125000A)LF3,254$107.56$102.34$153.66$92.19$111.40$121.39
23Elastomeric concrete nosing material (0584-0103000C)CF76$230.00$123.00$100.00$93.00$100.00$178.00
24Surface texturing (0540-0401000J)SY4,999$6.00$5.15$2.00$6.00$5.50$8.45
25Concrete repair (0542-0102001J)SF10$700.00$1,280.00$1,000.00$500.00$600.00$579.00
26PG 70-22ER asphalt in level 4 1/2 inch ACP (0745-0640100M)TON26$1.00$1.00$0.01$1.00$1.00$1.00
27Temporary impact attenuator, narrow site system (0226-0134000E)EACH1$6,500.00$4,000.00$20,000$5,000.00$6,500.00$6,500.00
28Cold plane pavement removal, 2 inches deep (0620-0120000J)SY1,775$7.00$8.00$5.00$19.82$2.25$4.55
29Construct hesc overlay (0558-0100000J)SY5,399$30.00$40.80$65.00$45.00$65.00$46.40
30Type "F" concrete rail, rectangular tube retrofit (0587-0125000A)LF3,280$106.71$100.61$152.44$91.46$110.52$120.43
31Constructing elastomeric concrete nosing (0584-0104000J)SF403$75.00$137.00$110.00$104.00$105.00$125.00
32Temporary barricades, type III (0224-0105000E)EACH10$165.00$165.00$300.00$250.00$165.00$499.00
33Temporary signs (0222-0102000J)SF1,155$22.00$22.00$24.00$35.00$22.00$63.70
34Temporary plastic drums (0224-0145000E)EACH170$45.00$45.00$100.00$75.00$55.00$156.00
35Temporary removable tape (0225-0150000F)LF59,800$4.50$5.35$2.00$5.35$5.35$5.35
36Work containment plan (0290-0102000A)LS1$2,000.00$5,400.00$5,000.00$5,000.00$10,000$17,900
37Surface texturing (0540-0401000J)SY4,856$6.00$5.15$2.00$6.00$5.50$8.45
38Poured joint seal (0585-0206100A)LF123$81.30$51.22$48.78$38.50$48.78$53.50
39Delineators, type 5 (0840-0105000E)EACH162$16.00$41.00$20.00$16.00$25.00$16.00
40Temporary non-reflective tape (0225-0152000F)LF7,500$4.50$5.90$2.00$5.90$5.90$5.90
41Portable changeable message signs (0222-0164000E)EACH4$6,000.00$3,600.00$20,000$2,200.00$6,000.00$20,000
422 foot type CL protective fence (0587-0140000F)LF1,644$45.00$77.10$50.00$58.00$40.00$58.00
43Construct hesc overlay (0558-0100000J)SY5,561$30.00$39.60$65.00$50.00$65.00$46.80
44Radar speed trailer (0222-0167500E)EACH1$5,000.00$3,000.00$15,000$5,000.00$4,000.00$22,000
45Elastomeric concrete nosing material (0584-0103000C)CF69$230.00$123.00$100.00$93.00$112.00$186.00
46Selective hydrodemolition (0505-0101000J)SY5,399$60.00$53.40$85.00$100.00$85.00$95.00
47Furnish high early strength concrete (0558-0100000K)CY354$1,300.00$1,740.00$1,200.00$1,275.00$1,400.00$1,850.00
48Temporary impact attenuator, truck mounted (0226-0138000E)EACH1$20,772$10,000$100,000$8,000.00$30,000$55,000
49PG 64-22 asphalt in level 2, 1/2 inch ACP (0745-0620000M)TON13$1.00$1.00$0.01$1.00$1.00$1.00
50Moving temporary impact attenuators, narrow site system (0226-0137000E)EACH9$950.00$1,850.00$200.00$950.00$1,000.00$950.00
51Traffic control supervisor (0223-0169000E)EACH200$620.00$200.00$50.00$188.00$150.00$1,900.00
52Surface mounted tubular markers (0224-0142000E)EACH204$70.00$185.00$30.00$185.00$125.00$185.00
53Sequential arrow signs (0222-0162000E)EACH1$2,000.00$1,200.00$10,000$3,500.00$6,000.00$8,500.00
54Furnish high early strength concrete (0558-0100000K)CY422$1,300.00$1,730.00$1,200.00$1,275.00$1,400.00$1,850.00
55Concrete deck micro-milling, 2 inch depth (0505-0100000J)SY3,064$11.00$37.90$35.00$50.00$11.50$39.90
56Mono-directional white type iar markers (0855-0101100E)EACH81$35.00$35.00$35.00$35.00$35.00$35.00
57Temporary reflective pavement markers (0225-0148000E)EACH5,980$2.00$8.50$8.00$8.50$8.50$8.50
58Pavement marking tape, grooved, patterned, wet weather (0865-0127100F)LF5,060$8.15$8.15$8.00$8.15$8.25$8.15
59Poured joint seal (0585-0206100A)LF89$112.36$58.99$56.18$44.94$56.18$66.07
60Bridge identification markers (0842-0401000E)EACH3$249.00$250.00$150.00$200.00$300.00$200.00
61Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J)SY5,561$10.00$30.90$30.00$59.00$10.00$22.60
62Level 2, 1/2 inch ACP in temporary (0745-0241000M)TON210$210.00$205.00$150.00$205.00$205.00$205.00
632 foot type CL protective fence (0587-0140000F)LF1,625$45.00$77.10$50.00$58.00$40.00$58.00
64Selective hydrodemolition (0505-0101000J)SY5,561$60.00$53.40$85.00$100.00$85.00$95.00
65Bridge removal work (0501-0100000A)SF308$64.94$411.73$81.17$16.56$413.96$252.27
66Repair temporary impact attenuator, narrow site system (0226-0141300E)EACH8$10,000$4,150.00$0.01$7,500.00$7,500.00$7,500.00
67Adjusting inlets (0490-0105000E)EACH1$2,500.00$1,340.00$3,000.00$744.00$2,000.00$7,920.00
ODOT contract 15640: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy