ODOT contract 15640 bid tabulation
I-5:n umpqua r & corp nb & sb bridges (winchester). Let by Oregon DOT on January 15, 2026, Region 3. 7 bids received.
- Owner
- Oregon DOT
- Letting
- 15 JAN 2026
- Pay items
- 67
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Replace surface mounted tubular markers (0224-0143000E) | EACH | 21 | $70.00 | $125.00 | $50.00 | $185.00 | $200.00 | $292.00 |
| 2 | Reflective barrier panels (0226-0141100E) | EACH | 1,868 | $15.00 | $27.50 | $10.00 | $15.00 | $10.00 | $15.00 |
| 3 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 164 | $91.46 | $96.95 | $91.46 | $73.17 | $91.46 | $89.02 |
| 4 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 148 | $101.35 | $97.30 | $94.59 | $74.32 | $101.35 | $91.22 |
| 5 | Amg cold plane pavement removal (0621-0100000J) | SY | 3,425 | $9.00 | $15.30 | $7.00 | $20.00 | $5.00 | $24.80 |
| 6 | Delineators, type 1 (0840-0100000E) | EACH | 6 | $90.00 | $90.00 | $100.00 | $150.00 | $100.00 | $150.00 |
| 7 | Mono-directional white type iar markers, recessed (0855-0106100E) | EACH | 20 | $35.00 | $35.00 | $35.00 | $35.00 | $40.00 | $35.00 |
| 8 | Permanent reflective barrier panels (1999-9Z90000E) | EACH | 110 | $32.00 | $38.80 | $20.00 | $20.00 | $30.00 | $38.80 |
| 9 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 371 | $75.00 | $137.00 | $110.00 | $105.00 | $125.00 | $134.00 |
| 10 | Temporary work access system (0253-0106000A) | LS | 1 | $10,000 | $60,000 | $40,000 | $2,500.00 | $5,000.00 | $7,500.00 |
| 11 | Temporary work access system (0253-0106000A) | LS | 1 | $10,000 | $55,000 | $40,000 | $5,000.00 | $5,000.00 | $7,500.00 |
| 12 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 4 | $1,000.00 | $13.63 | $0.01 | $150.00 | $1.00 | $6,460.00 |
| 13 | Level 4, 1/2 inch ACP (0745-0402000M) | TON | 436 | $185.00 | $184.00 | $150.00 | $184.00 | $185.00 | $184.00 |
| 14 | Continuous rumble strips (0857-0101000L) | MI | 0.11 | $35,000 | $35,000 | $20,000 | $35,000 | $40,000 | $75,000 |
| 15 | Temporary barrier (0226-0126100F) | LF | 21,200 | $12.50 | $1.00 | $0.01 | $6.25 | $5.00 | $12.50 |
| 16 | Pollution control plan (0290-0100000A) | LS | 1 | $2,000.00 | $746.00 | $2,000.00 | $500.00 | $500.00 | $5,960.00 |
| 17 | Aggregate shoulders (0640-0101000M) | TON | 35 | $149.00 | $171.00 | $100.00 | $140.00 | $145.00 | $578.00 |
| 18 | Bridge removal work (0501-0100000A) | SF | 10 | $2,000.00 | $12,681 | $2,500.00 | $300.00 | $2,500.00 | $7,770.00 |
| 19 | Gap pattern rumble strips (0857-0101500L) | MI | 0.11 | $35,000 | $35,000 | $20,000 | $35,000 | $40,000 | $75,000 |
| 20 | Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J) | SY | 2,332 | $10.00 | $30.90 | $30.00 | $60.00 | $11.50 | $39.30 |
| 21 | Pavement marking tape, grooved, patterned, wet weather, with black contrast (0865-0127100F) | LF | 4,090 | $10.60 | $10.60 | $10.50 | $10.60 | $11.00 | $10.60 |
| 22 | Type "F" concrete rail, rectangular tube retrofit (0587-0125000A) | LF | 3,254 | $107.56 | $102.34 | $153.66 | $92.19 | $111.40 | $121.39 |
| 23 | Elastomeric concrete nosing material (0584-0103000C) | CF | 76 | $230.00 | $123.00 | $100.00 | $93.00 | $100.00 | $178.00 |
| 24 | Surface texturing (0540-0401000J) | SY | 4,999 | $6.00 | $5.15 | $2.00 | $6.00 | $5.50 | $8.45 |
| 25 | Concrete repair (0542-0102001J) | SF | 10 | $700.00 | $1,280.00 | $1,000.00 | $500.00 | $600.00 | $579.00 |
| 26 | PG 70-22ER asphalt in level 4 1/2 inch ACP (0745-0640100M) | TON | 26 | $1.00 | $1.00 | $0.01 | $1.00 | $1.00 | $1.00 |
| 27 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 1 | $6,500.00 | $4,000.00 | $20,000 | $5,000.00 | $6,500.00 | $6,500.00 |
| 28 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 1,775 | $7.00 | $8.00 | $5.00 | $19.82 | $2.25 | $4.55 |
| 29 | Construct hesc overlay (0558-0100000J) | SY | 5,399 | $30.00 | $40.80 | $65.00 | $45.00 | $65.00 | $46.40 |
| 30 | Type "F" concrete rail, rectangular tube retrofit (0587-0125000A) | LF | 3,280 | $106.71 | $100.61 | $152.44 | $91.46 | $110.52 | $120.43 |
| 31 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 403 | $75.00 | $137.00 | $110.00 | $104.00 | $105.00 | $125.00 |
| 32 | Temporary barricades, type III (0224-0105000E) | EACH | 10 | $165.00 | $165.00 | $300.00 | $250.00 | $165.00 | $499.00 |
| 33 | Temporary signs (0222-0102000J) | SF | 1,155 | $22.00 | $22.00 | $24.00 | $35.00 | $22.00 | $63.70 |
| 34 | Temporary plastic drums (0224-0145000E) | EACH | 170 | $45.00 | $45.00 | $100.00 | $75.00 | $55.00 | $156.00 |
| 35 | Temporary removable tape (0225-0150000F) | LF | 59,800 | $4.50 | $5.35 | $2.00 | $5.35 | $5.35 | $5.35 |
| 36 | Work containment plan (0290-0102000A) | LS | 1 | $2,000.00 | $5,400.00 | $5,000.00 | $5,000.00 | $10,000 | $17,900 |
| 37 | Surface texturing (0540-0401000J) | SY | 4,856 | $6.00 | $5.15 | $2.00 | $6.00 | $5.50 | $8.45 |
| 38 | Poured joint seal (0585-0206100A) | LF | 123 | $81.30 | $51.22 | $48.78 | $38.50 | $48.78 | $53.50 |
| 39 | Delineators, type 5 (0840-0105000E) | EACH | 162 | $16.00 | $41.00 | $20.00 | $16.00 | $25.00 | $16.00 |
| 40 | Temporary non-reflective tape (0225-0152000F) | LF | 7,500 | $4.50 | $5.90 | $2.00 | $5.90 | $5.90 | $5.90 |
| 41 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $6,000.00 | $3,600.00 | $20,000 | $2,200.00 | $6,000.00 | $20,000 |
| 42 | 2 foot type CL protective fence (0587-0140000F) | LF | 1,644 | $45.00 | $77.10 | $50.00 | $58.00 | $40.00 | $58.00 |
| 43 | Construct hesc overlay (0558-0100000J) | SY | 5,561 | $30.00 | $39.60 | $65.00 | $50.00 | $65.00 | $46.80 |
| 44 | Radar speed trailer (0222-0167500E) | EACH | 1 | $5,000.00 | $3,000.00 | $15,000 | $5,000.00 | $4,000.00 | $22,000 |
| 45 | Elastomeric concrete nosing material (0584-0103000C) | CF | 69 | $230.00 | $123.00 | $100.00 | $93.00 | $112.00 | $186.00 |
| 46 | Selective hydrodemolition (0505-0101000J) | SY | 5,399 | $60.00 | $53.40 | $85.00 | $100.00 | $85.00 | $95.00 |
| 47 | Furnish high early strength concrete (0558-0100000K) | CY | 354 | $1,300.00 | $1,740.00 | $1,200.00 | $1,275.00 | $1,400.00 | $1,850.00 |
| 48 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $20,772 | $10,000 | $100,000 | $8,000.00 | $30,000 | $55,000 |
| 49 | PG 64-22 asphalt in level 2, 1/2 inch ACP (0745-0620000M) | TON | 13 | $1.00 | $1.00 | $0.01 | $1.00 | $1.00 | $1.00 |
| 50 | Moving temporary impact attenuators, narrow site system (0226-0137000E) | EACH | 9 | $950.00 | $1,850.00 | $200.00 | $950.00 | $1,000.00 | $950.00 |
| 51 | Traffic control supervisor (0223-0169000E) | EACH | 200 | $620.00 | $200.00 | $50.00 | $188.00 | $150.00 | $1,900.00 |
| 52 | Surface mounted tubular markers (0224-0142000E) | EACH | 204 | $70.00 | $185.00 | $30.00 | $185.00 | $125.00 | $185.00 |
| 53 | Sequential arrow signs (0222-0162000E) | EACH | 1 | $2,000.00 | $1,200.00 | $10,000 | $3,500.00 | $6,000.00 | $8,500.00 |
| 54 | Furnish high early strength concrete (0558-0100000K) | CY | 422 | $1,300.00 | $1,730.00 | $1,200.00 | $1,275.00 | $1,400.00 | $1,850.00 |
| 55 | Concrete deck micro-milling, 2 inch depth (0505-0100000J) | SY | 3,064 | $11.00 | $37.90 | $35.00 | $50.00 | $11.50 | $39.90 |
| 56 | Mono-directional white type iar markers (0855-0101100E) | EACH | 81 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 57 | Temporary reflective pavement markers (0225-0148000E) | EACH | 5,980 | $2.00 | $8.50 | $8.00 | $8.50 | $8.50 | $8.50 |
| 58 | Pavement marking tape, grooved, patterned, wet weather (0865-0127100F) | LF | 5,060 | $8.15 | $8.15 | $8.00 | $8.15 | $8.25 | $8.15 |
| 59 | Poured joint seal (0585-0206100A) | LF | 89 | $112.36 | $58.99 | $56.18 | $44.94 | $56.18 | $66.07 |
| 60 | Bridge identification markers (0842-0401000E) | EACH | 3 | $249.00 | $250.00 | $150.00 | $200.00 | $300.00 | $200.00 |
| 61 | Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J) | SY | 5,561 | $10.00 | $30.90 | $30.00 | $59.00 | $10.00 | $22.60 |
| 62 | Level 2, 1/2 inch ACP in temporary (0745-0241000M) | TON | 210 | $210.00 | $205.00 | $150.00 | $205.00 | $205.00 | $205.00 |
| 63 | 2 foot type CL protective fence (0587-0140000F) | LF | 1,625 | $45.00 | $77.10 | $50.00 | $58.00 | $40.00 | $58.00 |
| 64 | Selective hydrodemolition (0505-0101000J) | SY | 5,561 | $60.00 | $53.40 | $85.00 | $100.00 | $85.00 | $95.00 |
| 65 | Bridge removal work (0501-0100000A) | SF | 308 | $64.94 | $411.73 | $81.17 | $16.56 | $413.96 | $252.27 |
| 66 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 8 | $10,000 | $4,150.00 | $0.01 | $7,500.00 | $7,500.00 | $7,500.00 |
| 67 | Adjusting inlets (0490-0105000E) | EACH | 1 | $2,500.00 | $1,340.00 | $3,000.00 | $744.00 | $2,000.00 | $7,920.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.