ODOT contract 15647 bid tabulation
Or22: perrydale rd to kings valley highway. Let by Oregon DOT on February 19, 2026, Region 2. 11 bids received.
- Owner
- Oregon DOT
- Letting
- 19 FEB 2026
- Pay items
- 123
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| 11 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Bio-retention pond, D00248 (1011-0200000A) | LS | 1 | $177,000 | $190,000 | $136,000 | $300,000 | $210,000 | $275,000 |
| 2 | Water quality seeding (1030-0118000R) | ACRE | 0.70 | $7,730.00 | $8,500.00 | $7,500.00 | $7,000.00 | $8,000.00 | $7,500.00 |
| 3 | Mainline video inspection (0415-0100000F) | LF | 535 | $28.00 | $7.00 | $10.00 | $8.00 | $7.00 | $5.00 |
| 4 | Pilot cars (0223-0172000T) | HR | 200 | $135.00 | $100.00 | $92.00 | $100.00 | $90.00 | $100.00 |
| 5 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $1.00 | $1.00 | $2,500.00 | $0.01 | $1,000.00 | $1.00 |
| 6 | Temporary barrier (0226-0126100F) | LF | 3,762.50 | $52.00 | $29.00 | $27.00 | $10.00 | $30.00 | $25.65 |
| 7 | Pollution control plan (0290-0100000A) | LS | 1 | $2,500.00 | $800.00 | $500.00 | $3,000.00 | $1,000.00 | $500.00 |
| 8 | Temporary plastic drums (0224-0145000E) | EACH | 137 | $30.00 | $45.00 | $50.00 | $10.00 | $60.00 | $50.00 |
| 9 | Temporary pavement bars (0225-0153200J) | SF | 24 | $37.00 | $4.00 | $3.50 | $5.00 | $4.00 | $3.50 |
| 10 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 758 | $10.55 | $11.87 | $5.80 | $7.92 | $3.96 | $0.07 |
| 11 | Compost erosion blanket (0280-0105100J) | SY | 9,880 | $3.50 | $3.50 | $3.30 | $2.75 | $3.00 | $3.30 |
| 12 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 27 | $40.00 | $44.00 | $26.50 | $27.00 | $45.00 | $35.59 |
| 13 | Aggregate shoulders (0641-0130000M) | TON | 95 | $35.00 | $39.00 | $51.00 | $29.00 | $100.00 | $45.00 |
| 14 | Connection to existing structures (0490-0104000E) | EACH | 2 | $900.00 | $1,900.00 | $1,700.00 | $2,000.00 | $2,500.00 | $1,200.00 |
| 15 | Pavement bar, type B-HS (0867-0145100J) | SF | 915 | $18.00 | $19.00 | $17.15 | $17.15 | $18.00 | $17.50 |
| 16 | Curb marking, thermoplastic (0869-0100000F) | LF | 28 | $21.00 | $22.00 | $20.00 | $25.00 | $20.00 | $20.00 |
| 17 | Sign support footings (0920-0100000A) | CY | 7.87 | $4,193.14 | $3,811.94 | $2,882.47 | $3,176.62 | $762.39 | $3,176.62 |
| 18 | Water quality swale, D00519 (1012-0100000A) | LS | 1 | $8,500.00 | $5,300.00 | $5,000.00 | $8,000.00 | $4,000.00 | $7,500.00 |
| 19 | 4 inch concrete surfacing, colored (0759-0138000J) | SF | 4,000 | $13.70 | $15.00 | $10.50 | $19.00 | $15.00 | $13.50 |
| 20 | Temporary striping (0225-0153000F) | LF | 33,500 | $0.10 | $0.10 | $0.08 | $0.10 | $0.10 | $0.08 |
| 21 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 180 | $51.00 | $55.00 | $44.00 | $50.00 | $45.00 | $50.00 |
| 22 | Flashing beacon installation, perrydale RD (0990-0106000A) | EACH | 1 | $18,500 | $12,000 | $9,500.00 | $13,000 | $12,000 | $12,500 |
| 23 | Permanent seeding (1030-0108000R) | ACRE | 8.25 | $7,730.00 | $8,500.00 | $7,500.00 | $15,000 | $8,000.00 | $7,500.00 |
| 24 | Remove existing signs (0905-0100000A) | LS | 1 | $1,000.00 | $1,800.00 | $2,750.00 | $4,000.00 | $1,500.00 | $9,000.00 |
| 25 | Sloped end sections, 18 inch (0445-0700180E) | EACH | 12 | $500.00 | $800.00 | $1,150.00 | $1,000.00 | $500.00 | $500.00 |
| 26 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 4 | $31.00 | $2,000.00 | $3,750.00 | $1,500.00 | $4,000.00 | $2,000.00 |
| 27 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $7,500.00 | $8,000.00 | $12,300 | $17,000 | $10,000 | $5,000.00 |
| 28 | Delineators, type 1U (0840-0101000E) | EACH | 62 | $77.00 | $80.00 | $70.00 | $75.00 | $24.00 | $80.00 |
| 29 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 3 | $31.00 | $1,000.00 | $1,000.00 | $0.01 | $1,000.00 | $500.00 |
| 30 | Mailbox concrete collars (1070-0102000E) | EACH | 2 | $125.00 | $130.00 | $75.00 | $100.00 | $300.00 | $210.00 |
| 31 | Culvert drainage markers, type 2 (0842-0202000E) | EACH | 7 | $200.00 | $210.00 | $165.00 | $175.00 | $100.00 | $80.00 |
| 32 | Level 4, 1/2 inch ACP (0745-0402000M) | TON | 6,385 | $99.00 | $96.00 | $85.00 | $101.00 | $99.00 | $96.00 |
| 33 | Facility field markers, type S1 green (0842-0101001E) | EACH | 6 | $92.00 | $100.00 | $75.00 | $75.00 | $50.00 | $80.00 |
| 34 | Facility field markers, type S1 red (0842-0102001E) | EACH | 6 | $100.00 | $100.00 | $75.00 | $75.00 | $50.00 | $80.00 |
| 35 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $1,000.00 | $250.00 | $1,800.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 36 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 363 | $44.00 | $48.00 | $33.00 | $33.00 | $40.00 | $40.19 |
| 37 | Matting, type E (0280-0105050J) | SY | 3,200 | $3.25 | $6.00 | $3.00 | $6.50 | $3.00 | $3.00 |
| 38 | Flagger station lighting (0223-0168100E) | EACH | 4 | $2,600.00 | $675.00 | $2,650.00 | $2,500.00 | $3,000.00 | $500.00 |
| 39 | Single mailbox supports (1070-0100000E) | EACH | 2 | $550.00 | $550.00 | $450.00 | $500.00 | $800.00 | $500.00 |
| 40 | Water quality swale, D00853 (1012-0100000A) | LS | 1 | $14,000 | $7,800.00 | $7,000.00 | $12,000 | $5,500.00 | $8,250.00 |
| 41 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 180 | $21.00 | $20.00 | $19.50 | $20.00 | $20.00 | $20.00 |
| 42 | Adjusting boxes (0490-0100000E) | EACH | 1 | $500.00 | $300.00 | $350.00 | $1,500.00 | $300.00 | $900.00 |
| 43 | 24 inch culvert pipe, 5 FT depth (0445-010024AF) | LF | 69 | $360.00 | $179.00 | $170.00 | $210.00 | $200.00 | $185.00 |
| 44 | General excavation (0330-0105000K) | CY | 32,295 | $7.75 | $19.00 | $21.00 | $22.00 | $30.00 | $19.00 |
| 45 | Construction entrance, type 1 (0280-0110010E) | EACH | 5 | $4,500.00 | $3,000.00 | $2,650.00 | $5,000.00 | $2,000.00 | $3,000.00 |
| 46 | Check dam, type 1 (0280-0106010E) | EACH | 12 | $215.00 | $200.00 | $320.00 | $250.00 | $50.00 | $150.00 |
| 47 | Traffic control supervisor (0223-0169000E) | EACH | 150 | $500.00 | $840.00 | $590.00 | $100.00 | $500.00 | $100.00 |
| 48 | Asphalt pavement sawcutting, 11 inches deep (0310-0119100F) | LF | 3,012 | $10.50 | $3.00 | $3.50 | $8.00 | $8.00 | $5.00 |
| 49 | Sediment barrier, type 4 (0280-0115040E) | EACH | 10 | $290.00 | $55.00 | $48.00 | $150.00 | $23.00 | $200.00 |
| 50 | PG 64-22 asphalt in level 3, 1/2 inch ACP (0745-0620000M) | TON | 571 | $1.00 | $1.00 | $1.00 | $0.01 | $1.00 | $1.00 |
| 51 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 10 | $385.00 | $162.00 | $200.00 | $330.00 | $250.00 | $315.00 |
| 52 | Inlet protection, type 4 (0280-0114040E) | EACH | 1 | $400.00 | $85.00 | $105.00 | $200.00 | $100.00 | $250.00 |
| 53 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 20,362 | $2.00 | $3.50 | $4.55 | $4.00 | $4.00 | $3.90 |
| 54 | 10 inch reinforced concrete surfacing (0759-0144000J) | SF | 1,559 | $27.00 | $28.00 | $19.00 | $32.00 | $23.00 | $26.00 |
| 55 | Multi-post breakaway sign supports (0930-0111000A) | LB | 1,191 | $10.08 | $10.08 | $10.92 | $12.59 | $8.40 | $20.99 |
| 56 | Water quality swale, D00517 (1012-0100000A) | LS | 1 | $8,500.00 | $5,300.00 | $5,000.00 | $8,000.00 | $4,000.00 | $7,500.00 |
| 57 | Mono-directional white type iar markers (0855-0101100E) | EACH | 10 | $9.00 | $9.00 | $8.50 | $10.00 | $9.00 | $9.00 |
| 58 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 409 | $30.00 | $33.00 | $26.50 | $27.00 | $30.00 | $40.19 |
| 59 | Topsoil (1040-0101000K) | CY | 2,639 | $50.00 | $46.00 | $48.00 | $10.00 | $50.00 | $48.00 |
| 60 | Level 3, 1/2 inch ACP (0745-0302000M) | TON | 9,517 | $92.00 | $88.00 | $81.00 | $94.00 | $92.00 | $90.00 |
| 61 | Lighting poles and arms (0970-0200000A) | EACH | 16 | $6,875.00 | $6,562.50 | $6,875.00 | $7,500.00 | $6,250.00 | $7,812.50 |
| 62 | Mono-directional white type iar markers, recessed (0855-0106100E) | EACH | 12 | $21.00 | $20.00 | $19.50 | $20.00 | $20.00 | $20.00 |
| 63 | Extra for asphalt approaches (0749-0100000E) | EACH | 11 | $1,550.00 | $650.00 | $1,050.00 | $2,000.00 | $1,800.00 | $1,500.00 |
| 64 | Facility field markers, type S2 (0842-0103001E) | EACH | 12 | $100.00 | $100.00 | $175.00 | $175.00 | $100.00 | $80.00 |
| 65 | Water quality swale, D00518 (1012-0100000A) | LS | 1 | $8,500.00 | $5,300.00 | $5,000.00 | $8,000.00 | $4,000.00 | $7,500.00 |
| 66 | Amg cold plane pavement removal (0621-0100000J) | SY | 2,497 | $9.75 | $8.00 | $17.25 | $14.00 | $15.00 | $15.00 |
| 67 | Health and safety plan (0294-0100000A) | LS | 1 | $2,500.00 | $800.00 | $1,250.00 | $3,000.00 | $1,000.00 | $500.00 |
| 68 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 33,820 | $1.50 | $1.60 | $1.45 | $1.45 | $1.00 | $1.50 |
| 69 | Temporary signs (0222-0102000J) | SF | 1,427.50 | $19.00 | $24.00 | $26.00 | $28.00 | $22.00 | $17.00 |
| 70 | 18 inch subgrade stabilization (0331-0109000J) | SY | 14,202 | $48.00 | $23.00 | $30.00 | $5.00 | $28.00 | $35.00 |
| 71 | Sediment barrier, type 8 (0280-0115080F) | LF | 800 | $8.00 | $9.00 | $8.00 | $12.00 | $8.00 | $8.00 |
| 72 | 18 inch culvert pipe, 5 FT depth (0445-010018AF) | LF | 64 | $320.00 | $138.00 | $172.00 | $200.00 | $110.00 | $175.00 |
| 73 | Bar removal (0225-0156000J) | SF | 24 | $80.00 | $50.00 | $45.00 | $50.00 | $40.00 | $45.00 |
| 74 | Plastic sheeting (0280-0101000J) | SY | 450 | $3.50 | $2.00 | $2.00 | $3.00 | $4.00 | $11.00 |
| 75 | Reflective barrier panels (0226-0141100E) | EACH | 620 | $51.00 | $34.00 | $33.00 | $7.00 | $30.00 | $30.00 |
| 76 | Temporary barricades, type III (0224-0105000E) | EACH | 16 | $59.00 | $140.00 | $225.00 | $300.00 | $100.00 | $150.00 |
| 77 | Automated flagger assistance device (0223-0200000E) | EACH | 4 | $15,000 | $1,200.00 | $7,500.00 | $4,000.00 | $15,000 | $2,000.00 |
| 78 | Sediment barrier, type 3 (0280-0115030F) | LF | 275 | $9.00 | $7.00 | $5.00 | $7.00 | $4.00 | $5.00 |
| 79 | Removal of surfacings (0310-0103000J) | SY | 706 | $12.00 | $6.00 | $7.00 | $21.00 | $15.00 | $6.00 |
| 80 | Core correlation of nuclear gauge readings (0745-0900000E) | EACH | 4 | $2,500.00 | $1,250.00 | $3,800.00 | $1,500.00 | $2,000.00 | $2,000.00 |
| 81 | 6 inch asphalt concrete pavement repair (0748-0103000J) | SY | 1,453 | $13.00 | $48.00 | $26.50 | $50.00 | $60.00 | $8.00 |
| 82 | Continuous rumble strips (0857-0101000L) | MI | 0.76 | $2,800.00 | $2,900.00 | $2,650.00 | $2,650.00 | $4,500.00 | $2,750.00 |
| 83 | Non-traversable median markings, thermoplastic (0869-0300000J) | SF | 7 | $42.00 | $45.00 | $40.00 | $50.00 | $45.00 | $40.00 |
| 84 | Pole foundations (0970-0100000A) | EACH | 16 | $1,718.75 | $2,500.00 | $2,187.50 | $2,500.00 | $1,875.00 | $2,500.00 |
| 85 | 4 inch concrete surfacing (0759-0138000J) | SF | 2,720 | $9.50 | $10.00 | $10.00 | $14.00 | $13.00 | $9.25 |
| 86 | Switching, conduit, and wiring (0970-0105000A) | LF | 2,300 | $58.70 | $47.83 | $39.13 | $43.48 | $61.74 | $45.65 |
| 87 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 11 | $620.00 | $675.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 88 | Water quality swale, D00516 (1012-0100000A) | LS | 1 | $8,500.00 | $5,300.00 | $5,000.00 | $8,000.00 | $4,000.00 | $7,500.00 |
| 89 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 2,745 | $3.64 | $4.37 | $7.65 | $8.74 | $4.37 | $2.19 |
| 90 | Concrete washout facility (0280-0112500E) | EACH | 2 | $500.00 | $1,000.00 | $1,200.00 | $2,000.00 | $2,500.00 | $1,500.00 |
| 91 | Removal of pipes (0310-0100000F) | LF | 205 | $32.00 | $15.00 | $15.00 | $30.00 | $40.00 | $15.00 |
| 92 | Temporary seeding (1030-0103000R) | ACRE | 2 | $8,250.00 | $8,500.00 | $8,000.00 | $10,500 | $8,000.00 | $8,000.00 |
| 93 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 16 | $500.00 | $625.00 | $750.00 | $937.50 | $468.75 | $937.50 |
| 94 | Gap pattern rumble strips (0857-0101500L) | MI | 1.50 | $2,800.00 | $2,900.00 | $2,650.00 | $2,650.00 | $6,000.00 | $2,750.00 |
| 95 | BI-directional yellow type I markers (0855-0102100E) | EACH | 55 | $9.00 | $9.00 | $8.50 | $10.00 | $9.00 | $9.00 |
| 96 | PG 70-22ER asphalt in level 4, 1/2 inch ACP (0745-0640100M) | TON | 383 | $1.00 | $1.00 | $1.00 | $0.01 | $1.00 | $1.00 |
| 97 | Sloped end sections, 24 inch (0445-0700240E) | EACH | 2 | $600.00 | $1,700.00 | $2,400.00 | $1,100.00 | $500.00 | $500.00 |
| 98 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $22,000 | $40,000 | $38,000 | $10,000 | $50,000 | $10,000 |
| 99 | Check dam, type 3 (0280-0106030E) | EACH | 54 | $275.00 | $75.00 | $125.00 | $250.00 | $60.00 | $150.00 |
| 100 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 73 | $76.00 | $40.00 | $91.00 | $40.00 | $48.00 | $80.00 |
| 101 | Concrete curbs, low profile mountable curb (0759-0106000F) | LF | 5,762 | $27.50 | $29.00 | $25.00 | $32.00 | $30.00 | $26.00 |
| 102 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 36 | $170.00 | $180.00 | $165.00 | $165.00 | $170.00 | $175.00 |
| 103 | Wood sign posts (0910-0100000K) | FBM | 872 | $20.00 | $22.00 | $18.00 | $18.00 | $10.00 | $23.00 |
| 104 | Pavement legend, type B-HS: yield line triangle (0867-0169100E) | EACH | 32 | $88.00 | $95.00 | $85.00 | $85.00 | $100.00 | $90.00 |
| 105 | Weed control (1030-0101000R) | ACRE | 8.25 | $2,500.00 | $3,200.00 | $2,400.00 | $3,000.00 | $2,400.00 | $2,400.00 |
| 106 | Subgrade geotextile (0350-0105000J) | SY | 37,746 | $1.40 | $2.00 | $1.20 | $3.00 | $1.00 | $1.00 |
| 107 | Loose riprap, class 50 (0390-0105000K) | CY | 40 | $105.00 | $200.00 | $170.00 | $130.00 | $100.00 | $150.00 |
| 108 | Aggregate base (0641-0102000M) | TON | 20,631 | $23.00 | $32.00 | $35.00 | $29.00 | $33.00 | $36.00 |
| 109 | Concrete inlets, type D (modified) (0470-0312000E) | EACH | 1 | $5,200.00 | $3,300.00 | $3,500.00 | $5,000.00 | $3,500.00 | $5,300.00 |
| 110 | Cold plane pavement removal, 3 - 4 inches deep (0620-0112000J) | SY | 1,043 | $7.00 | $7.50 | $13.10 | $8.50 | $10.00 | $12.00 |
| 111 | 10 inch reinforced colored patterned concrete surfacing (0759-0147000J) | SF | 26,140 | $22.75 | $24.00 | $23.00 | $27.00 | $26.00 | $22.00 |
| 112 | Paved culvert end slopes (0460-0100000J) | SF | 345 | $26.00 | $30.00 | $36.00 | $36.00 | $26.00 | $30.00 |
| 113 | 18 inch ductile iron pipe, 5 FT depth (0445-060018AF) | LF | 254 | $265.00 | $207.00 | $200.00 | $285.00 | $200.00 | $130.00 |
| 114 | Straw bale (0280-0119000E) | EACH | 15 | $75.00 | $75.00 | $110.00 | $50.00 | $30.00 | $100.00 |
| 115 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $9,000.00 | $5,000.00 | $11,500 | $2,000.00 | $3,000.00 | $5,000.00 |
| 116 | Matting, type C (0280-0105030J) | SY | 100 | $5.50 | $6.00 | $5.00 | $6.00 | $5.00 | $5.00 |
| 117 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $24,000 | $2,800.00 | $21,000 | $30,000 | $16,000 | $12,000 |
| 118 | Flaggers (0223-0168000T) | HR | 1,500 | $82.00 | $78.00 | $78.00 | $86.00 | $80.00 | $65.00 |
| 119 | Construct and remove temporary roadbed and surfacing (0230-0200000A) | LS | 1 | $226,000 | $260,000 | $276,000 | $350,000 | $260,000 | $500,000 |
| 120 | Emulsified asphalt for tack coat (0730-0100000M) | TON | 13 | $1.00 | $950.00 | $1.00 | $0.01 | $20.00 | $1.00 |
| 121 | Fertilizing (1030-0139000R) | ACRE | 8.25 | $825.00 | $2,000.00 | $800.00 | $2,000.00 | $1,000.00 | $800.00 |
| 122 | Clearing and grubbing (0320-0100000A) | ACRE | 10 | $900.00 | $6,000.00 | $20,325 | $5,500.00 | $4,000.00 | $6,500.00 |
| 123 | Check dam, type 6 (0280-0106060E) | EACH | 87 | $400.00 | $135.00 | $100.00 | $100.00 | $75.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.