ODOT contract 15660 bid tabulation
Or99w at bethel rd (polk county). Let by Oregon DOT on April 23, 2026, Region 2. 8 bids received.
- Owner
- Oregon DOT
- Letting
- 23 APR 2026
- Pay items
- 76
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 237.50 | $51.00 | $35.00 | $55.00 | $70.00 | $54.00 | $53.00 |
| 2 | Temporary striping (0225-0153000F) | LF | 13,000 | $0.20 | $0.20 | $0.40 | $0.20 | $0.20 | $0.20 |
| 3 | 12 inch culvert pipe, 5 FT depth (0445-010012AF) | LF | 62 | $90.00 | $80.00 | $93.00 | $133.00 | $77.00 | $100.00 |
| 4 | Automated flagger assistance device (0223-0200000E) | EACH | 4 | $3,500.00 | $1,100.00 | $4,800.00 | $3,000.00 | $1,500.00 | $2,400.00 |
| 5 | Temporary signs (0222-0102000J) | SF | 870 | $26.00 | $17.00 | $17.00 | $19.00 | $10.00 | $12.00 |
| 6 | Flagger station lighting (0223-0168100E) | EACH | 4 | $1,200.00 | $600.00 | $2,600.00 | $1,400.00 | $700.00 | $1,000.00 |
| 7 | Temporary pavement legends (0225-0153100E) | EACH | 4 | $130.00 | $140.00 | $135.00 | $150.00 | $135.00 | $150.00 |
| 8 | Radar speed trailer (0222-0167500E) | EACH | 2 | $1,600.00 | $1,100.00 | $4,800.00 | $2,800.00 | $2,000.00 | $2,500.00 |
| 9 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 2 | $4,200.00 | $3,700.00 | $4,500.00 | $4,000.00 | $4,450.00 | $4,000.00 |
| 10 | Remove existing signs (0905-0100000A) | LS | 1 | $191.00 | $1,150.00 | $1,000.00 | $1,100.00 | $1,075.00 | $1,000.00 |
| 11 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $2,600.00 | $750.00 | $1,000.00 | $700.00 | $700.00 | $2,000.00 |
| 12 | Facility field markers, type S1 green (0842-0101001E) | EACH | 4 | $150.00 | $70.00 | $100.00 | $70.00 | $96.00 | $100.00 |
| 13 | Compost erosion blanket (0280-0105100J) | SY | 6,664 | $3.50 | $3.30 | $5.70 | $3.75 | $3.50 | $4.00 |
| 14 | Construction entrance, type 1 (0280-0110010E) | EACH | 2 | $3,000.00 | $3,000.00 | $1,500.00 | $3,000.00 | $3,000.00 | $1,200.00 |
| 15 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 253.60 | $6.70 | $5.32 | $5.91 | $6.11 | $5.13 | $7.89 |
| 16 | Water quality swale, D01810 (1012-0100000A) | LS | 1 | $8,150.00 | $9,500.00 | $12,000 | $8,186.52 | $9,500.00 | $10,000 |
| 17 | Plastic sheeting (0280-0101000J) | SY | 200 | $3.00 | $3.00 | $0.50 | $5.00 | $1.00 | $3.00 |
| 18 | Clearing and grubbing (0320-0100000A) | ACRE | 2 | $2,500.00 | $20,000 | $7,500.00 | $12,250 | $2,950.00 | $10,000 |
| 19 | Sediment barrier, type 3 (0280-0115030F) | LF | 20 | $10.00 | $16.00 | $2.00 | $6.00 | $59.00 | $30.00 |
| 20 | 18 inch culvert pipe, 5 FT depth (0445-010018AF) | LF | 103 | $80.00 | $160.00 | $230.00 | $222.00 | $241.00 | $170.00 |
| 21 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 290.30 | $8.27 | $6.89 | $6.89 | $8.61 | $6.65 | $5.51 |
| 22 | HI-build paint, sprayed, surface (0866-0117000F) | LF | 13,400 | $0.40 | $0.45 | $0.40 | $0.50 | $0.42 | $0.40 |
| 23 | Check dam, type 1 (0280-0106010E) | EACH | 26 | $150.00 | $200.00 | $710.00 | $900.00 | $141.00 | $50.00 |
| 24 | Matting, type E (0280-0105050J) | SY | 3,729 | $3.00 | $2.80 | $8.15 | $3.50 | $3.25 | $3.00 |
| 25 | Arborist (1999-9Z90000A) | LS | 1 | $3,000.00 | $1,800.00 | $6,500.00 | $4,750.00 | $2,700.00 | $3,000.00 |
| 26 | Flaggers (0223-0168000T) | HR | 500 | $85.00 | $80.00 | $82.00 | $94.55 | $86.00 | $80.00 |
| 27 | Temporary pavement bars (0225-0153200J) | SF | 80 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 28 | Water quality swale, D01813 (1012-0100000A) | LS | 1 | $7,500.00 | $8,000.00 | $12,000 | $8,350.37 | $7,250.00 | $9,000.00 |
| 29 | Wood sign posts (0910-0100000K) | FBM | 85.30 | $30.00 | $15.00 | $15.00 | $18.00 | $14.00 | $20.00 |
| 30 | Water quality filter strip, D01812 (1014-0100000A) | LS | 1 | $14,000 | $13,000 | $22,000 | $15,540 | $15,750 | $25,000 |
| 31 | Extra for asphalt approaches (0749-0100000E) | EACH | 3 | $1,800.00 | $1,200.00 | $2,100.00 | $1,100.00 | $2,000.00 | $2,000.00 |
| 32 | Triangular base breakaway sign supports (0930-0112000A) | LB | 34.30 | $174.93 | $212.83 | $174.93 | $247.81 | $203.21 | $174.93 |
| 33 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 42.70 | $37.00 | $30.00 | $30.00 | $26.00 | $26.00 | $30.00 |
| 34 | Single mailbox supports (1070-0100000E) | EACH | 1 | $750.00 | $450.00 | $500.00 | $500.00 | $500.00 | $800.00 |
| 35 | PG 64-22 asphalt in level 3, 1/2 inch ACP (0745-0620000M) | TON | 248 | $1.00 | $1.00 | $1.00 | $1.00 | $0.10 | $1.00 |
| 36 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 2 | $1,200.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,775.00 | $1,000.00 |
| 37 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 4 | $401.00 | $450.00 | $400.00 | $550.00 | $430.00 | $400.00 |
| 38 | Flashing beacon modification, bethel road (0990-0106000A) | EACH | 1 | $2,800.00 | $1,800.00 | $2,500.00 | $2,800.00 | $1,000.00 | $2,000.00 |
| 39 | Mailbox concrete collars (1070-0102000E) | EACH | 1 | $200.00 | $100.00 | $150.00 | $250.00 | $100.00 | $400.00 |
| 40 | Temporary seeding (1030-0103000R) | ACRE | 0.50 | $10,500 | $4,500.00 | $10,000 | $11,250 | $10,750 | $10,000 |
| 41 | Pavement bar, type B-HS (0867-0145100J) | SF | 400 | $19.00 | $21.00 | $20.00 | $20.00 | $19.75 | $20.00 |
| 42 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $4,400.00 | $3,000.00 | $4,800.00 | $14,000 | $14,650 | $12,000 |
| 43 | Facility field markers, type S1 red (0842-0102001E) | EACH | 4 | $150.00 | $70.00 | $100.00 | $70.00 | $96.00 | $100.00 |
| 44 | Delineators, type 4 alternate 1 (0840-0104100E) | EACH | 4 | $150.00 | $70.00 | $55.00 | $50.00 | $128.00 | $250.00 |
| 45 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 6,939 | $5.00 | $5.00 | $3.30 | $3.25 | $6.00 | $5.00 |
| 46 | Removal of pipes (0310-0100000F) | LF | 142.60 | $8.00 | $15.00 | $40.00 | $23.00 | $16.00 | $30.00 |
| 47 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $10,000 | $6,500.00 | $5,500.00 | $9,750.00 | $2,500.00 | $1,500.00 |
| 48 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 1,952 | $5.00 | $4.00 | $4.00 | $4.50 | $4.00 | $5.00 |
| 49 | Reflective barrier panels (0226-0141100E) | EACH | 168 | $34.00 | $30.00 | $30.45 | $30.00 | $30.00 | $25.00 |
| 50 | Straw bale (0280-0119000E) | EACH | 10 | $75.00 | $60.00 | $20.00 | $75.00 | $62.00 | $40.00 |
| 51 | Temporary barricades, type II (0224-0104000E) | EACH | 4 | $100.00 | $70.00 | $110.00 | $70.00 | $100.00 | $25.00 |
| 52 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $4,500.00 | $4,000.00 | $4,000.00 | $4,200.00 | $4,000.00 | $4,000.00 |
| 53 | Temporary barrier (0226-0126100F) | LF | 1,050 | $26.00 | $25.00 | $23.50 | $24.00 | $23.00 | $26.00 |
| 54 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $2,500.00 | $2,400.00 | $5,600.00 | $4,500.00 | $2,500.00 | $10,000 |
| 55 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $7,500.00 | $1.00 | $1,000.00 | $500.00 | $1,000.00 | $1,000.00 |
| 56 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $1,500.00 | $500.00 | $2,500.00 | $625.00 | $1,000.00 |
| 57 | Water quality seeding (1030-0118000R) | ACRE | 0.20 | $10,500 | $19,000 | $16,800 | $11,250 | $10,750 | $20,000 |
| 58 | Temporary plastic drums (0224-0145000E) | EACH | 100 | $70.00 | $50.00 | $50.00 | $60.00 | $23.00 | $40.00 |
| 59 | Check dam, type 6 (0280-0106060E) | EACH | 66 | $50.00 | $150.00 | $168.00 | $175.00 | $166.00 | $100.00 |
| 60 | Subgrade geotextile (0350-0105000J) | SY | 6,693 | $1.50 | $1.50 | $1.00 | $3.25 | $1.50 | $0.50 |
| 61 | Temporary barricades, type III (0224-0105000E) | EACH | 10 | $150.00 | $195.00 | $220.00 | $200.00 | $225.00 | $100.00 |
| 62 | Sediment barrier, type 8 (0280-0115080F) | LF | 419 | $10.00 | $10.00 | $8.00 | $14.00 | $8.50 | $10.00 |
| 63 | Aggregate base (0641-0102000M) | TON | 5,226 | $33.00 | $27.00 | $28.00 | $26.00 | $39.00 | $36.00 |
| 64 | Permanent seeding (1030-0108000R) | ACRE | 1.40 | $10,500 | $9,500.00 | $16,800 | $11,250 | $10,750 | $10,000 |
| 65 | Temporary transverse rumble strips, portable (0225-0153810F) | LF | 264 | $80.00 | $75.00 | $100.00 | $80.00 | $86.00 | $75.00 |
| 66 | Temporary flexible pavement markers (0225-0149000E) | EACH | 400 | $3.00 | $2.00 | $3.50 | $5.00 | $3.00 | $2.00 |
| 67 | Level 3, 1/2 inch ACP (0745-0302000M) | TON | 4,131 | $100.00 | $95.00 | $93.20 | $94.00 | $97.00 | $100.00 |
| 68 | 18 inch subgrade stabilization (0331-0109000J) | SY | 6,693 | $23.00 | $27.00 | $24.00 | $35.00 | $28.50 | $28.00 |
| 69 | Facility field markers, type S2 (0842-0103001E) | EACH | 4 | $150.00 | $170.00 | $200.00 | $200.00 | $160.00 | $100.00 |
| 70 | Water quality swale, D01811 (1012-0100000A) | LS | 1 | $8,250.00 | $9,000.00 | $12,000 | $9,255.64 | $8,900.00 | $11,000 |
| 71 | Sign support footings (0920-0100000A) | CY | 1.38 | $5,942.03 | $3,623.19 | $3,623.19 | $5,434.78 | $3,496.38 | $3,623.19 |
| 72 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $4,000.00 | $16,000 | $7,000.00 | $12,500 | $2,250.00 | $30,000 |
| 73 | Sediment barrier, type 9 (0280-0115090F) | LF | 1,368 | $7.00 | $5.50 | $6.00 | $6.50 | $6.50 | $5.00 |
| 74 | Paved culvert end slopes (0460-0100000J) | SF | 122 | $16.00 | $40.00 | $70.00 | $30.00 | $52.50 | $20.00 |
| 75 | General excavation (0330-0105000K) | CY | 6,133 | $19.00 | $24.00 | $21.00 | $21.00 | $25.00 | $35.00 |
| 76 | Delineators, type 1U (0840-0101000E) | EACH | 18 | $150.00 | $55.00 | $80.00 | $80.00 | $107.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.