ODOT contract 15667 bid tabulation
Us97: nw galloway ave - o'neil hwy. Let by Oregon DOT on May 21, 2026, Region 4. 3 bids received.
- Owner
- Oregon DOT
- Letting
- 21 MAY 2026
- Pay items
- 82
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 |
|---|---|---|---|---|---|---|
| 1 | Check dam, type 1 (0280-0106010E) | EACH | 17 | $150.00 | $100.00 | $350.00 |
| 2 | In-street flexible sign support, fixed base with quick release (1999-9Z90000E) | EACH | 4 | $555.00 | $555.00 | $555.00 |
| 3 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 100 | $50.00 | $50.00 | $50.00 |
| 4 | Portable changeable message signs, roller mounted (0222-0167300E) | EACH | 2 | $5,500.00 | $10,000 | $2,000.00 |
| 5 | Contaminated soil disposal (0294-0200010M) | TON | 100 | $90.00 | $100.00 | $123.00 |
| 6 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 12 | $30.00 | $30.00 | $30.00 |
| 7 | Flaggers (0223-0168000T) | HR | 1,000 | $35.00 | $1.00 | $95.00 |
| 8 | Gap pattern rumble strips (0857-0101500L) | MI | 0.27 | $1,450.00 | $1,500.00 | $1,450.00 |
| 9 | Aggregate base (0641-0102000M) | TON | 1,700 | $34.37 | $33.50 | $37.00 |
| 10 | Clearing and grubbing (0320-0100000A) | ACRE | 0.60 | $5,000.00 | $16,667 | $31,667 |
| 11 | Bar removal (0225-0156000J) | SF | 13 | $25.00 | $20.00 | $25.00 |
| 12 | Delineators, type 2 (0840-0102000E) | EACH | 10 | $150.00 | $150.00 | $150.00 |
| 13 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 63 | $160.00 | $250.00 | $250.00 |
| 14 | Radar speed trailer (0222-0167500E) | EACH | 2 | $2,500.00 | $2,400.00 | $1,250.00 |
| 15 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 13,884 | $2.94 | $3.00 | $3.50 |
| 16 | Temporary signs (0222-0102000J) | SF | 965 | $26.00 | $40.00 | $24.00 |
| 17 | Methyl methacrylate, extruded, grooved, non-profiled (0865-0116530F) | LF | 22,000 | $3.25 | $3.25 | $3.25 |
| 18 | Level 4, 1/2 inch lime treated ACP (0745-0422000M) | TON | 1,740 | $114.00 | $111.00 | $118.00 |
| 19 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,598.80 | $0.75 | $0.75 | $0.75 |
| 20 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $3,300.00 | $2,700.00 | $8,800.00 |
| 21 | Temporary barricades, type III (0224-0105000E) | EACH | 5 | $200.00 | $180.00 | $200.00 |
| 22 | General excavation (0330-0105000K) | CY | 1,700 | $30.42 | $15.00 | $44.50 |
| 23 | Concrete islands (0759-0122000J) | SF | 4,914.40 | $11.54 | $10.00 | $23.00 |
| 24 | Concrete barrier, tall (0820-0127000F) | LF | 3,812.50 | $130.00 | $125.00 | $125.00 |
| 25 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 303.70 | $7.41 | $7.41 | $7.41 |
| 26 | Traffic control supervisor (0223-0169000E) | EACH | 30 | $250.00 | $900.00 | $600.00 |
| 27 | Flashing beacon installation, US97 at O'neil hwy (0990-0106000A) | EACH | 1 | $7,780.00 | $5,280.00 | $5,280.00 |
| 28 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $1,000.00 | $1,000.00 | $1.00 |
| 29 | Removal of inlets (0310-0104000E) | EACH | 4 | $1,000.00 | $500.00 | $1,500.00 |
| 30 | Level 3, 1/2 inch lime treated ACP (0745-0322000M) | TON | 800 | $111.00 | $108.00 | $118.00 |
| 31 | Delineators, type 5 (0840-0105000E) | EACH | 30 | $15.00 | $15.00 | $15.00 |
| 32 | Continuous rumble strips (0857-0101000L) | MI | 1.53 | $1,450.00 | $1,500.00 | $1,450.00 |
| 33 | Extra for asphalt approaches (0749-0100000E) | EACH | 2 | $1,000.00 | $350.00 | $1,500.00 |
| 34 | Remove existing signs (0905-0100000A) | LS | 1 | $1,400.00 | $1,400.00 | $1,400.00 |
| 35 | 18 inch subgrade stabilization (0331-0109000J) | SY | 376 | $28.50 | $55.00 | $58.00 |
| 36 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 302.40 | $40.00 | $40.00 | $40.00 |
| 37 | 24 inch culvert pipe, 5 FT depth (0445-010024AF) | LF | 20 | $145.00 | $150.00 | $225.00 |
| 38 | Concrete manholes, storm sewer pollution control with inlet (0470-0104000E) | EACH | 1 | $3,100.00 | $4,500.00 | $13,000 |
| 39 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 350 | $18.50 | $18.50 | $18.50 |
| 40 | Flagger station lighting (0223-0168100E) | EACH | 4 | $2,000.00 | $1,000.00 | $500.00 |
| 41 | Trench resurfacing (0495-0100000J) | SY | 5 | $215.00 | $50.00 | $165.00 |
| 42 | Major adjustment of manholes (0490-0121000E) | EACH | 1 | $2,000.00 | $2,500.00 | $1,800.00 |
| 43 | Inlet protection, type 3 (0280-0114030E) | EACH | 6 | $100.00 | $50.00 | $25.00 |
| 44 | Legend removal (0225-0155100J) | SF | 306 | $8.50 | $20.00 | $8.50 |
| 45 | Temporary pavement bars (0225-0153200J) | SF | 12 | $25.00 | $20.00 | $25.00 |
| 46 | Stripe removal (0225-0154000F) | LF | 13,128 | $0.62 | $1.00 | $1.00 |
| 47 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $1,500.00 | $2,500.00 | $7,200.00 |
| 48 | Wood sign posts (0910-0100000K) | FBM | 208 | $25.00 | $25.00 | $25.00 |
| 49 | Permanent seeding (1030-0108000R) | ACRE | 0.20 | $4,500.00 | $10,000 | $35,000 |
| 50 | Concrete inlets, type M-E (0470-0321000E) | EACH | 2 | $2,800.00 | $3,000.00 | $6,000.00 |
| 51 | Pavement bar, type B-HS (0867-0145100J) | SF | 380 | $18.50 | $18.50 | $18.50 |
| 52 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 102 | $100.00 | $100.00 | $102.00 |
| 53 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $4,000.00 | $20,000 | $4,600.00 |
| 54 | Mainline video with laser profile inspection (0415-0401000F) | LF | 406 | $10.00 | $8.00 | $15.00 |
| 55 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 4 | $3,100.00 | $3,000.00 | $5,900.00 |
| 56 | Connection to existing structures (0490-0104000E) | EACH | 1 | $500.00 | $1,000.00 | $1,500.00 |
| 57 | Triangular base breakaway sign supports (0930-0112000A) | LB | 702.70 | $14.66 | $11.10 | $11.10 |
| 58 | 18 inch culvert pipe, 5 FT depth (0445-010018AF) | LF | 6 | $245.00 | $160.00 | $255.00 |
| 59 | Loose riprap, class 50 (0390-0105000K) | CY | 14 | $150.00 | $75.00 | $150.00 |
| 60 | Concrete washout facility (0280-0112500E) | EACH | 1 | $1,000.00 | $1,000.00 | $2,000.00 |
| 61 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $6,000.00 | $4,500.00 | $9,200.00 |
| 62 | Single mailbox supports (1070-0100000E) | EACH | 1 | $450.00 | $450.00 | $450.00 |
| 63 | Temporary plastic drums (0224-0145000E) | EACH | 61 | $20.00 | $40.00 | $20.00 |
| 64 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 15 | $625.00 | $625.00 | $625.00 |
| 65 | Sequential arrow signs (0222-0162000E) | EACH | 1 | $800.00 | $1,100.00 | $2,550.00 |
| 66 | Lead compliance plan (0294-0500000A) | LS | 1 | $2,500.00 | $1,000.00 | $1,000.00 |
| 67 | PG 64-28 asphalt in level 3, 1/2 inch ACP (0745-0622000M) | TON | 50 | $1.00 | $1.00 | $1.00 |
| 68 | Culvert drainage markers, type 1 (0842-0201000E) | EACH | 1 | $100.00 | $50.00 | $50.00 |
| 69 | Sign support footings (0920-0100000A) | CY | 3.70 | $3,405.41 | $3,405.41 | $3,405.41 |
| 70 | Cleaning existing drywell (1999-9Z90000A) | LS | 1 | $4,000.00 | $1,500.00 | $1,400.00 |
| 71 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 1,737 | $6.00 | $3.00 | $5.50 |
| 72 | Pilot cars (0223-0172000T) | HR | 250 | $55.00 | $1.00 | $105.00 |
| 73 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $500.00 | $1,000.00 |
| 74 | Concrete curbs, mountable curb and gutter (0759-0114000F) | LF | 669.60 | $32.00 | $35.00 | $68.00 |
| 75 | PG 70-28ER asphalt in level 4, 1/2 inch ACP (0745-0642100M) | TON | 120 | $1.00 | $1.00 | $1.00 |
| 76 | Impact attenuator, type J (0830-0123000E) | EACH | 2 | $44,000 | $38,000 | $45,500 |
| 77 | Subgrade geotextile (0350-0105000J) | SY | 2,130 | $1.50 | $2.00 | $4.00 |
| 78 | Mailbox concrete collars (1070-0102000E) | EACH | 1 | $130.00 | $130.00 | $130.00 |
| 79 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $300.00 | $300.00 | $300.00 |
| 80 | Temporary transverse rumble strips, portable (0225-0153810F) | LF | 264 | $100.00 | $90.00 | $150.00 |
| 81 | Temporary striping (0225-0153000F) | LF | 400 | $0.50 | $5.00 | $0.55 |
| 82 | Removal of pipes (0310-0100000F) | LF | 8 | $25.00 | $25.00 | $92.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.