ODOT contract 15669 bid tabulation
I-84: rieth interchange and umatilla river bridges. Let by Oregon DOT on June 4, 2026, Region 5. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 04 JUN 2026
- Pay items
- 126
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Mainline video inspection (0415-0100000F) | LF | 606 | $6.00 | $11.83 | $4.00 | $5.00 | $7.00 | $10.00 |
| 2 | Pollution control plan (0290-0100000A) | LS | 1 | $1,440.00 | $1,207.94 | $500.00 | $0.01 | $1,000.00 | $5,000.00 |
| 3 | Reinforcement, grade 60 (0530-0104000O) | LB | 187 | $2.25 | $8.23 | $2.50 | $6.00 | $25.00 | $50.00 |
| 4 | Hot applied joint seal replacement (0585-0410000A) | LF | 105 | $42.00 | $39.50 | $57.14 | $38.10 | $71.43 | $47.62 |
| 5 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $1,730.00 | $15,000 | $1,500.00 | $0.01 | $12,000 | $50,000 |
| 6 | 15 inch culvert pipe, 5 FT depth (0445-010015AF) | LF | 268 | $88.00 | $178.76 | $160.00 | $100.00 | $65.00 | $125.00 |
| 7 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 168 | $92.00 | $140.11 | $112.00 | $115.00 | $112.00 | $100.00 |
| 8 | Finishing roadbeds (0370-0100000A) | SY | 364 | $15.22 | $96.15 | $32.97 | $13.74 | $137.36 | $27.47 |
| 9 | Asphalt pavement sawcutting, less than 6 inches deep (0310-0119110F) | LF | 5,000 | $2.50 | $2.70 | $6.00 | $3.00 | $2.10 | $2.10 |
| 10 | Concrete deck micro-milling, 1.375 inch depth (0505-0100000J) | SY | 2,507 | $15.00 | $19.37 | $23.00 | $20.00 | $25.00 | $25.00 |
| 11 | Bridge identification markers (0842-0401000E) | EACH | 4 | $280.00 | $150.00 | $150.00 | $150.00 | $250.00 | $200.00 |
| 12 | Construct structural concrete overlay (0559-0302000J) | SY | 2,711 | $70.00 | $54.00 | $60.00 | $70.00 | $35.00 | $70.00 |
| 13 | Construct structural concrete overlay (0559-0302000J) | SY | 2,119 | $44.00 | $47.00 | $60.00 | $70.00 | $40.00 | $70.00 |
| 14 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 22 | $280.00 | $270.19 | $250.00 | $250.00 | $250.00 | $250.00 |
| 15 | Snowplow deflectors (1999-9Z90000E) | EACH | 24 | $1,390.00 | $389.07 | $1,300.00 | $300.00 | $1,500.00 | $1,500.00 |
| 16 | Class 2 preparation (0504-0100000J) | SY | 66 | $470.00 | $250.00 | $275.00 | $0.01 | $350.00 | $800.00 |
| 17 | 16 inch ductile iron pipe, 5 FT depth (0445-060016AF) | LF | 338 | $165.00 | $234.14 | $225.00 | $110.00 | $145.00 | $175.00 |
| 18 | Construct and remove temporary roadbed and surfacing (0230-0200000A) | LS | 1 | $77,080 | $99,000 | $175,000 | $110,000 | $207,000 | $400,000 |
| 19 | Surface texturing (0540-0401000J) | SY | 2,581 | $7.00 | $7.00 | $5.25 | $12.00 | $7.00 | $5.00 |
| 20 | Bridge identification markers (0842-0401000E) | EACH | 4 | $280.00 | $150.00 | $150.00 | $150.00 | $250.00 | $200.00 |
| 21 | Bridge removal work (0501-0100000A) | SF | 94 | $293.51 | $63.83 | $53.19 | $180.85 | $638.30 | $106.38 |
| 22 | Concrete deck micro-milling, 1.375 inch depth (0505-0100000J) | SY | 3,107 | $15.00 | $18.55 | $23.00 | $20.00 | $25.00 | $25.00 |
| 23 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 925 | $32.00 | $30.26 | $25.00 | $28.00 | $28.00 | $30.00 |
| 24 | Check dam, type 2 (0280-0106020E) | EACH | 10 | $210.00 | $162.11 | $400.00 | $300.00 | $500.00 | $300.00 |
| 25 | Bridge identification markers (0842-0401000E) | EACH | 2 | $280.00 | $150.00 | $150.00 | $150.00 | $250.00 | $200.00 |
| 26 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 348 | $90.00 | $127.53 | $85.00 | $120.00 | $119.00 | $100.00 |
| 27 | Elastomeric concrete nosing material (0584-0103000C) | CF | 59 | $540.00 | $175.00 | $500.00 | $200.00 | $202.00 | $500.00 |
| 28 | Concrete slope paving (0599-0100000J) | SF | 42 | $75.00 | $101.41 | $125.00 | $80.00 | $100.00 | $200.00 |
| 29 | Stone embankment (0330-0126000K) | CY | 200 | $72.00 | $59.95 | $50.00 | $75.00 | $55.00 | $80.00 |
| 30 | Elastomeric concrete nosing material (0584-0103000C) | CF | 28 | $540.00 | $175.00 | $200.00 | $200.00 | $201.00 | $500.00 |
| 31 | Concrete inlets, type D (0470-0311000E) | EACH | 1 | $2,890.00 | $1,695.79 | $7,500.00 | $3,000.00 | $5,000.00 | $3,500.00 |
| 32 | Emulsified asphalt in fog coat (0705-0101000M) | TON | 4 | $1,050.00 | $1,590.94 | $950.00 | $1,000.00 | $950.00 | $1,000.00 |
| 33 | Cold plane pavement removal, 5 inches deep (0620-0124000J) | SY | 600 | $9.00 | $12.03 | $7.00 | $10.00 | $10.00 | $15.00 |
| 34 | Construct structural concrete overlay (0559-0302000J) | SY | 3,107 | $260.00 | $40.00 | $60.00 | $70.00 | $35.00 | $70.00 |
| 35 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $25,970 | $36,896 | $50,000 | $30,000 | $10,000 | $15,000 |
| 36 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $10,390 | $300.00 | $1.00 | $0.01 | $1,200.00 | $1.00 |
| 37 | Paved culvert end slopes (0460-0100000J) | SF | 130 | $42.00 | $51.59 | $100.00 | $60.00 | $65.00 | $60.00 |
| 38 | Crack sealing (0746-0100000F) | LF | 1,000 | $7.00 | $8.00 | $4.25 | $5.00 | $4.22 | $30.00 |
| 39 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 14,500 | $3.25 | $3.42 | $4.00 | $4.60 | $5.00 | $4.00 |
| 40 | Permanent seeding (1030-0108000R) | ACRE | 2 | $3,710.00 | $4,268.93 | $4,500.00 | $3,358.00 | $3,950.00 | $3,000.00 |
| 41 | General structural concrete, class 4000 (0540-0312000K) | CY | 1.20 | $17,230 | $9,268.73 | $15,000 | $10,000 | $10,000 | $10,000 |
| 42 | Inlet protection, type 3 (0280-0114030E) | EACH | 22 | $146.00 | $57.20 | $250.00 | $100.00 | $85.00 | $70.00 |
| 43 | Deep cut hydrodemolition, 1 inch depth (0505-0102000J) | SY | 3,107 | $101.00 | $135.00 | $115.00 | $165.00 | $110.00 | $125.00 |
| 44 | Bridge removal work (0501-0100000A) | SF | 97 | $284.43 | $61.86 | $51.55 | $175.26 | $618.56 | $103.09 |
| 45 | Structural concrete overlay material (0559-0300000K) | CY | 174 | $580.00 | $700.00 | $500.00 | $500.00 | $600.00 | $550.00 |
| 46 | Deep cut hydrodemolition, 1 inch depth (0505-0102000J) | SY | 2,119 | $88.00 | $135.00 | $115.00 | $165.00 | $120.00 | $125.00 |
| 47 | Structural concrete overlay material (0559-0300000K) | CY | 188 | $580.00 | $700.00 | $500.00 | $500.00 | $600.00 | $550.00 |
| 48 | Railroad flagger services (0223-0170000E) | EACH | 30 | $1,660.00 | $1,500.00 | $1,250.00 | $2,000.00 | $1,800.00 | $1,500.00 |
| 49 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 94 | $42.23 | $82.06 | $132.98 | $117.02 | $132.98 | $85.11 |
| 50 | Bridge identification markers (0842-0401000E) | EACH | 2 | $280.00 | $150.00 | $150.00 | $150.00 | $250.00 | $200.00 |
| 51 | Continuously reinforced concrete pavement repair (0758-0100000J) | SY | 860 | $380.00 | $397.00 | $390.00 | $400.00 | $385.00 | $350.00 |
| 52 | Cable barrier, test level 3 (0811-0101000F) | LF | 2,400 | $57.00 | $54.04 | $76.00 | $50.00 | $50.00 | $50.00 |
| 53 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $55,740 | $86,646 | $20,000 | $50,000 | $75,000 | $100,000 |
| 54 | Continuously reinforced concrete pavement 12 inches thick (0755-0108000J) | SY | 1,630 | $340.00 | $382.00 | $385.00 | $400.00 | $370.00 | $400.00 |
| 55 | PG 64-28 asphalt in level 3, 1/2 inch lime treated ACP (0745-0622000M) | TON | 300 | $1.00 | $1.10 | $1.00 | $0.01 | $1.00 | $1.00 |
| 56 | Bridge removal work (0501-0100000A) | SF | 2 | $13,795 | $3,000.00 | $2,500.00 | $3,000.00 | $30,000 | $5,000.00 |
| 57 | Flaggers (0223-0168000T) | HR | 240 | $92.00 | $96.87 | $71.00 | $0.01 | $80.00 | $90.00 |
| 58 | Under deck hydrodemolition containment (1999-9Z90000A) | LS | 1 | $45,330 | $15,028 | $15,000 | $8,000.00 | $100,000 | $20,000 |
| 59 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 131 | $96.00 | $108.35 | $115.00 | $115.00 | $114.00 | $100.00 |
| 60 | Terminal expansion joint (0755-0400000F) | LF | 192 | $92.00 | $150.00 | $150.00 | $300.00 | $140.00 | $125.00 |
| 61 | Surface texturing (0540-0401000J) | SY | 2,911 | $7.00 | $7.00 | $5.50 | $12.00 | $7.00 | $5.00 |
| 62 | Elastomeric concrete nosing material (0584-0103000C) | CF | 58 | $540.00 | $175.00 | $500.00 | $200.00 | $201.00 | $500.00 |
| 63 | Surface mounted tubular markers (0224-0142000E) | EACH | 470 | $105.00 | $105.00 | $95.00 | $100.00 | $100.00 | $80.00 |
| 64 | Surface texturing (0540-0401000J) | SY | 2,351 | $7.00 | $7.00 | $5.50 | $12.00 | $7.00 | $5.00 |
| 65 | Hot applied joint seal replacement (0585-0410000A) | LF | 105 | $42.00 | $45.90 | $47.62 | $38.10 | $71.43 | $47.62 |
| 66 | Preparation of shoulders (0334-0100000A) | MI | 0.06 | $276,833 | $51,609 | $166,667 | $16,667 | $833,333 | $166,667 |
| 67 | Concrete sawcutting, less than 6 inches deep (0310-0119210F) | LF | 320 | $10.00 | $8.11 | $8.00 | $10.00 | $8.00 | $8.00 |
| 68 | Temporary barrier (0226-0126100F) | LF | 1,800 | $27.00 | $20.00 | $12.00 | $20.00 | $18.50 | $40.00 |
| 69 | Stripe removal (0225-0154000F) | LF | 184,670 | $0.31 | $0.30 | $0.28 | $0.29 | $0.28 | $0.28 |
| 70 | Radar speed trailer (0222-0167500E) | EACH | 2 | $10,960 | $11,007 | $15,000 | $5,000.00 | $15,000 | $2,000.00 |
| 71 | Portable changeable message signs (0222-0164000E) | EACH | 5 | $6,350.00 | $5,279.18 | $15,000 | $2,000.00 | $15,000 | $10,000 |
| 72 | Concrete deck micro-milling, 1.375 inch depth (0505-0100000J) | SY | 2,711 | $15.00 | $19.05 | $23.00 | $20.00 | $25.00 | $25.00 |
| 73 | Concrete deck micro-milling, 1.375 inch depth (0505-0100000J) | SY | 2,119 | $15.00 | $20.14 | $23.00 | $20.00 | $25.00 | $25.00 |
| 74 | Hot applied joint seal replacement (0585-0410000A) | LF | 112 | $39.38 | $38.34 | $53.57 | $35.71 | $66.96 | $44.64 |
| 75 | Construct structural concrete overlay (0559-0302000J) | SY | 2,507 | $40.00 | $40.00 | $60.00 | $70.00 | $35.00 | $70.00 |
| 76 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 356 | $91.00 | $78.76 | $85.00 | $120.00 | $119.00 | $100.00 |
| 77 | Impact attenuator, type barrels (0830-0115000E) | EACH | 4 | $380.00 | $1,080.74 | $4,000.00 | $1,500.00 | $1,600.00 | $1,500.00 |
| 78 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 8 | $910.00 | $864.59 | $500.00 | $800.00 | $800.00 | $1,500.00 |
| 79 | Level 3, 1/2 inch lime treated ACP (0745-0322000M) | TON | 5,000 | $127.00 | $135.23 | $125.00 | $140.00 | $115.00 | $125.00 |
| 80 | Guardrail terminals, flared (0810-0130000E) | EACH | 4 | $4,200.00 | $3,998.74 | $3,500.00 | $3,700.00 | $3,700.00 | $4,200.00 |
| 81 | Plural component, sprayed, grooved (0866-0114000F) | LF | 50,000 | $1.00 | $1.06 | $1.02 | $0.98 | $0.98 | $1.00 |
| 82 | Terminal expansion joint sleeper slab (0755-0400000F) | LF | 192 | $380.00 | $331.46 | $450.00 | $425.00 | $300.00 | $400.00 |
| 83 | Snowplow deflectors (1999-9Z90000E) | EACH | 24 | $1,390.00 | $389.07 | $1,300.00 | $300.00 | $1,500.00 | $1,500.00 |
| 84 | Deep cut hydrodemolition, 1 inch depth (0505-0102000J) | SY | 2,507 | $103.00 | $135.00 | $115.00 | $165.00 | $120.00 | $125.00 |
| 85 | Structural concrete overlay material (0559-0300000K) | CY | 147 | $580.00 | $700.00 | $500.00 | $500.00 | $600.00 | $550.00 |
| 86 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 1 | $1,150.00 | $1,000.00 | $7,000.00 | $1,000.00 | $1,000.00 | $1,500.00 |
| 87 | 12 inch subgrade stabilization (0331-0106000J) | SY | 200 | $49.00 | $29.16 | $75.00 | $44.00 | $50.00 | $100.00 |
| 88 | Cable barrier terminals (0811-0103000E) | EACH | 7 | $6,800.00 | $6,484.44 | $7,500.00 | $6,000.00 | $6,000.00 | $7,000.00 |
| 89 | Temporary plastic drums (0224-0145000E) | EACH | 680 | $46.00 | $24.18 | $15.00 | $100.00 | $58.00 | $20.00 |
| 90 | General excavation (0330-0105000K) | CY | 5,000 | $17.00 | $30.39 | $35.00 | $20.00 | $25.00 | $60.00 |
| 91 | Spall repair (0758-0300000J) | SY | 4 | $7,270.00 | $657.27 | $750.00 | $700.00 | $600.00 | $1,000.00 |
| 92 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 4 | $4,330.00 | $4,052.78 | $3,250.00 | $4,000.00 | $3,750.00 | $3,500.00 |
| 93 | Surface texturing (0540-0401000J) | SY | 1,988 | $7.00 | $7.00 | $5.50 | $12.00 | $7.00 | $5.00 |
| 94 | Bridge jacking at bent 1 (0255-0100000A) | LS | 1 | $84,200 | $75,000 | $45,000 | $60,000 | $50,000 | $60,000 |
| 95 | Foundation excavation (0330-0102000K) | CY | 200 | $90.00 | $50.18 | $75.00 | $50.00 | $50.00 | $100.00 |
| 96 | Temporary signs (0222-0102000J) | SF | 1,500 | $25.00 | $15.62 | $38.00 | $24.00 | $23.00 | $27.00 |
| 97 | Lead compliance plan (0294-0500000A) | LS | 1 | $1,730.00 | $19,000 | $500.00 | $0.01 | $10,000 | $5,000.00 |
| 98 | Work containment plan (0290-0102000A) | LS | 1 | $2,890.00 | $1,405.77 | $15,000 | $0.01 | $30,000 | $30,000 |
| 99 | Moving temporary impact attenuators, narrow site system (0226-0137000E) | EACH | 2 | $2,080.00 | $1,999.37 | $900.00 | $2,000.00 | $1,850.00 | $1,250.00 |
| 100 | Replace surface mounted tubular markers (0224-0143000E) | EACH | 50 | $83.00 | $105.00 | $175.00 | $100.00 | $125.00 | $70.00 |
| 101 | Sequential arrow signs (0222-0162000E) | EACH | 4 | $3,170.00 | $2,350.00 | $2,500.00 | $1,000.00 | $4,000.00 | $4,000.00 |
| 102 | Temporary delineators (0224-0147000E) | EACH | 160 | $83.00 | $64.84 | $80.00 | $100.00 | $100.00 | $100.00 |
| 103 | Under deck hydrodemolition containment (1999-9Z90000A) | LS | 1 | $38,110 | $16,663 | $15,000 | $10,000 | $100,000 | $20,000 |
| 104 | Temporary striping (0225-0153000F) | LF | 92,168 | $0.20 | $0.19 | $0.18 | $0.19 | $0.18 | $0.20 |
| 105 | Railroad flagger services (0223-0170000E) | EACH | 30 | $1,660.00 | $1,500.00 | $1,200.00 | $2,000.00 | $1,800.00 | $1,500.00 |
| 106 | Bearing devices, 14 inch wide, 14 inch long, 4.625 inch thick (0582-0020000E) | EACH | 7 | $1,100.00 | $6,669.75 | $9,000.00 | $5,000.00 | $7,500.00 | $5,000.00 |
| 107 | Guardrail transition (0810-0126000E) | EACH | 7 | $4,820.00 | $4,593.15 | $3,000.00 | $4,250.00 | $4,250.00 | $500.00 |
| 108 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 3 | $3,910.00 | $3,728.55 | $3,500.00 | $3,450.00 | $3,450.00 | $4,150.00 |
| 109 | Thrie beam to W beam transition (1999-9Z90000E) | EACH | 8 | $570.00 | $540.37 | $2,500.00 | $500.00 | $500.00 | $800.00 |
| 110 | Structural concrete overlay material (0559-0300000K) | CY | 216 | $580.00 | $700.00 | $500.00 | $500.00 | $600.00 | $550.00 |
| 111 | Drainage geotextile, type 1 (0350-0100000J) | SY | 11,000 | $1.75 | $1.85 | $2.00 | $1.75 | $2.00 | $6.00 |
| 112 | Deep cut hydrodemolition, 1 inch depth (0505-0102000J) | SY | 2,711 | $84.00 | $135.00 | $115.00 | $160.00 | $120.00 | $125.00 |
| 113 | Aggregate base (0641-0102000M) | TON | 9,000 | $31.00 | $35.00 | $19.00 | $6.00 | $32.00 | $50.00 |
| 114 | Clearing and grubbing (0320-0100000A) | ACRE | 4.50 | $8,351.11 | $16,667 | $16,667 | $5,555.56 | $5,555.56 | $2,222.22 |
| 115 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 187.50 | $84.00 | $79.97 | $65.00 | $74.00 | $74.00 | $60.00 |
| 116 | Bridge removal work (0501-0100000A) | SF | 30 | $875.33 | $200.00 | $666.67 | $400.00 | $2,000.00 | $2,500.00 |
| 117 | Concrete pavement sawcut texturing (1999-9Z90000I) | SY | 1,630 | $6.00 | $7.03 | $5.50 | $15.00 | $6.00 | $5.00 |
| 118 | Class 2 preparation (0504-0100000J) | SY | 126 | $470.00 | $250.00 | $265.00 | $0.01 | $350.00 | $800.00 |
| 119 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 97 | $40.93 | $48.76 | $128.87 | $113.40 | $128.87 | $82.47 |
| 120 | CLSM fill (1999-9Z90000A) | LS | 1 | $2,120.00 | $2,000.00 | $3,500.00 | $3,000.00 | $15,000 | $10,000 |
| 121 | Elastomeric concrete nosing material (0584-0103000C) | CF | 22 | $540.00 | $175.00 | $200.00 | $200.00 | $201.00 | $500.00 |
| 122 | Hot applied joint seal replacement (0585-0410000A) | LF | 144 | $30.63 | $36.38 | $41.67 | $34.72 | $52.08 | $34.72 |
| 123 | Temporary barricades, type III (0224-0105000E) | EACH | 20 | $75.00 | $150.00 | $220.00 | $250.00 | $200.00 | $200.00 |
| 124 | Sediment barrier, type 3 (0280-0115030F) | LF | 2,500 | $8.00 | $7.02 | $4.00 | $4.00 | $6.50 | $5.00 |
| 125 | Concrete sawcutting, 6 to 14 inches deep (0310-0119220F) | LF | 200 | $21.00 | $16.21 | $12.00 | $15.00 | $14.25 | $8.00 |
| 126 | Gap pattern rumble strips (0857-0101500L) | MI | 3 | $4,030.00 | $3,944.70 | $3,800.00 | $3,650.00 | $3,650.00 | $3,650.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 4, 2026. Compiled by Mirage Metrics.