| 0010 | Mobilization (1031000) | LS | 1 | $485,500 | $248,000 | $420,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $34,000 | $150,000 | $35,000 |
| 0030 | Removal & disposal of existing pavement (2023000) | SY | 743.88 | $36.50 | $67.10 | $41.00 |
| 0040 | Removal & disposal of existing curb (2024100) | LF | 595 | $16.70 | $12.70 | $18.00 |
| 0050 | Removal & disposal of existing asphalt pavement (2025000) | SY | 400 | $31.10 | $31.25 | $44.00 |
| 0060 | Removal of exist. guardrail (2027801) | LF | 2,205 | $1.05 | $1.00 | $2.00 |
| 0070 | Unclassified excavation (2031000) | CY | 1,899 | $43.80 | $33.70 | $27.00 |
| 0080 | Borrow excavation (2033000) | CY | 1,120 | $34.00 | $52.75 | $50.00 |
| 0090 | Station grading (2035000) | STA | 90.81 | $2,245.00 | $1,650.00 | $1,200.00 |
| 0100 | Excavation for shoulder paving (2036000) | STA | 152.06 | $50.85 | $38.20 | $175.00 |
| 0110 | Hauling of excavated shoulder material (2072000) | STA | 152.06 | $65.30 | $88.90 | $100.00 |
| 0120 | Maintenance stone (3059900) | TON | 166.25 | $65.15 | $105.00 | $60.00 |
| 0130 | Cement modified recycled base (8" unif)-curing method B (3063222) | SY | 42,533 | $7.50 | $6.45 | $6.70 |
| 0140 | Cement modified recycled base (10" unif)-curing method B (3063232) | SY | 26,840 | $8.20 | $6.55 | $7.40 |
| 0150 | Portland cement for cement modified recycled base course (3064000) | TON | 1,841 | $255.00 | $240.00 | $254.25 |
| 0160 | HMA shoulder widening course (3104000) | TON | 1,098.60 | $66.05 | $68.15 | $93.50 |
| 0170 | Liquid asphalt binder PG64-22 (4011004) | TON | 1,635.90 | $660.00 | $630.00 | $647.00 |
| 0180 | Full depth asph. pav. patching 8" unif (4012080) | SY | 3,140 | $69.50 | $74.00 | $67.00 |
| 0190 | Full depth asph. pav. patching 12"unif (4012120) | SY | 9,750 | $102.70 | $96.25 | $102.00 |
| 0200 | Milling existing asphalt pavement 1.75" (4013117) | SY | 93,350 | $2.00 | $2.50 | $3.50 |
| 0210 | Milling existing asphalt pavement (variable) (4013990) | SY | 33,700 | $5.40 | $2.65 | $5.00 |
| 0211 | Asphalt base course - type B (4020320) | TON | 2,120 | $58.70 | $86.55 | $86.75 |
| 0212 | Asphalt intermediate course type B (4030320) | TON | 4,643 | $64.20 | $78.20 | $80.25 |
| 0220 | Asphalt surface course type B (4040320) | TON | 13,489.41 | $60.30 | $80.50 | $78.80 |
| 0230 | Asphalt surface course type C (4040340) | TON | 6,627.94 | $67.85 | $91.65 | $80.50 |
| 0240 | Driveway paving-surface type C (4047220) | TON | 1,196.38 | $185.00 | $195.00 | $185.00 |
| 0250 | Asphalt surface treat (single treatment) (4060010) | SY | 69,373 | $2.55 | $2.40 | $3.05 |
| 0260 | Traffic control (6011000) | LS | 1 | $740,000 | $580,320 | $345,000 |
| 0270 | Permanent construction signs (ground mounted) (6051120) | SF | 2,396 | $6.05 | $6.00 | $7.00 |
| 0271 | Pavement markings (temporary paint) 24"X36" white triangle yield bar (609138A) | LF | 270 | $0.13 | $1.00 | $1.00 |
| 0280 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 13,378 | $0.12 | $0.12 | $0.12 |
| 0290 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 230,681 | $0.12 | $0.12 | $0.12 |
| 0300 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 5,286 | $0.12 | $0.12 | $0.12 |
| 0310 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 3,406 | $1.00 | $1.00 | $1.00 |
| 0320 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 70 | $15.15 | $15.00 | $15.00 |
| 0330 | White word message "only"- fast dry paint (6240035) | EACH | 38 | $15.15 | $15.00 | $15.00 |
| 0340 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 6 | $15.15 | $15.00 | $15.00 |
| 0350 | White lane drop arrow (left or right)-fast dry paint (6240043) | EACH | 2 | $15.15 | $15.00 | $15.00 |
| 0360 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 8,630 | $0.12 | $0.12 | $0.12 |
| 0370 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 279,188 | $0.12 | $0.12 | $0.12 |
| 0380 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 1,380 | $1.00 | $1.00 | $1.00 |
| 0390 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 5,360 | $0.50 | $0.50 | $0.50 |
| 0400 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 6,958 | $0.85 | $0.85 | $0.85 |
| 0410 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 83,396 | $0.50 | $0.48 | $0.48 |
| 0420 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 2,538 | $2.50 | $2.50 | $2.50 |
| 0430 | 24IN X 36IN white triang. yield bar (gaps exc)thermo-125MIL (6271024) | LF | 135 | $18.20 | $18.00 | $18.00 |
| 0440 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 1,565 | $10.10 | $10.00 | $10.00 |
| 0450 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 35 | $75.75 | $75.00 | $75.00 |
| 0460 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 19 | $75.75 | $75.00 | $75.00 |
| 0470 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 3 | $150.00 | $150.00 | $150.00 |
| 0480 | White lane drop arrow(LT.or RT.)thermo-125MIL (6271043) | EACH | 2 | $150.00 | $150.00 | $150.00 |
| 0490 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 5,400 | $0.50 | $0.48 | $0.48 |
| 0500 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 100,294 | $0.50 | $0.48 | $0.48 |
| 0510 | 24" yellow solid lines - thermoplastic - 125 mil. (6271080) | LF | 5,120 | $7.10 | $7.00 | $7.00 |
| 0520 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 307 | $6.05 | $6.00 | $6.00 |
| 0530 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 340 | $6.05 | $6.00 | $6.00 |
| 0540 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,005 | $6.05 | $6.00 | $6.00 |
| 0550 | Milled-in rumble strip (6321000) | MI | 9.96 | $505.00 | $500.00 | $900.00 |
| 0560 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 100 | $25.00 | $24.75 | $24.75 |
| 0570 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 5,200 | $0.60 | $0.56 | $0.56 |
| 0580 | Sawcut for loop detector (6780495) | LF | 1,990 | $9.60 | $9.50 | $9.50 |
| 0590 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 3 | $400.00 | $364.00 | $364.00 |
| 0600 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 4 | $5,050.00 | $5,000.00 | $5,000.00 |
| 0610 | 18" smooth wall pipe (7143618) | LF | 48 | $245.00 | $334.00 | $190.00 |
| 0620 | 24" smooth wall pipe (7143624) | LF | 24 | $335.00 | $358.00 | $210.00 |
| 0630 | Catch basin -type 16 (7191605) | EACH | 1 | $9,430.00 | $9,730.00 | $8,000.00 |
| 0640 | Catch basin T-17 (convert C.B. type 6) (7198292) | EACH | 21 | $3,535.00 | $6,275.00 | $7,900.00 |
| 0650 | Catch basin T-18 (convert C.B. type 7) (7198293) | EACH | 7 | $4,200.00 | $6,940.00 | $8,690.00 |
| 0660 | Concrete curb (9" X 15") (7201000) | LF | 520 | $28.30 | $38.15 | $36.00 |
| 0670 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 75 | $28.30 | $63.90 | $45.00 |
| 0680 | Concrete sidewalk(4" uniform) (7204100) | SY | 81 | $70.70 | $128.50 | $85.00 |
| 0690 | Detectable warning material (7204900) | SF | 362.50 | $55.55 | $40.00 | $40.00 |
| 0700 | Pedestrian ramp construction (7209000) | SY | 725 | $106.00 | $124.95 | $130.00 |
| 0710 | Surface applied detectable warning (7209100) | SF | 25 | $55.55 | $55.00 | $60.00 |
| 0720 | MT3 leading end treatment TL3 (8051151) | EACH | 24 | $3,435.00 | $3,400.00 | $3,200.00 |
| 0730 | Premash thrie with base PL 3.125 spacing (8051208) | LF | 150 | $155.00 | $155.00 | $98.00 |
| 0740 | Premash W-beam bridge conn TL2 WBBC2 (8051210) | EACH | 8 | $960.00 | $950.00 | $1,325.00 |
| 0750 | MGS3LS16 guardrail long span 16FT clear (8052125) | LF | 100 | $30.30 | $30.00 | $40.00 |
| 0760 | MGS3CS GR compressed shoulder (8052150) | LF | 2,075 | $29.30 | $29.00 | $28.00 |
| 0770 | Premash W-beam compressed SHLDR 9' post (8053001) | LF | 600 | $25.25 | $25.00 | $28.00 |
| 0780 | Premash thrie strong post guardrail (8053050) | LF | 1,050 | $32.35 | $32.00 | $38.00 |
| 0790 | Premash type T TL3 leading 50' (8057100) | EACH | 10 | $2,980.00 | $2,950.00 | $3,200.00 |
| 0800 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 5.91 | $3,395.00 | $2,750.00 | $4,250.00 |