SCDOT contract 2371610 bid tabulation
Bridge Repair-SC 418 over Huff Creek in Greenville County. Let by South Carolina DOT on April 8, 2025, Greenville, District 3. 5 bids received; low bid $746,327 by United Infrastructure Group, Inc..
- Owner
- South Carolina DOT
- Letting
- 08 APR 2025
- Pay items
- 29
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | United Infrastructure Group, Inc. | $746,327 | Low |
| 2 | Cekra, Inc. | $863,452 | +16% |
| 3 | Ipc Paving LLC | $876,673 | +17% |
| 4 | Dane Construction, LLC | $1,496,735 | +101% |
| 5 | Southern Road & Bridge, LLC | $2,490,038 | +234% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. United Infrastructure Group, Inc. | 2. Cekra, Inc. | 3. Ipc Paving LLC | 4. Dane Construction, LLC | 5. Southern Road & Bridge, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $37,316 | $40,000 | $55,000 | $74,835 | $242,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $22,390 | $20,000 | $15,000 | $29,930 | $45,000 |
| 0030 | Removal of structures & obstructions (2021000) | LS | 1 | $20,000 | $20,000 | $8,000.00 | $85,000 | $35,000 |
| 0040 | No. 57 stone for backfill (2052000) | TON | 32 | $600.00 | $250.00 | $120.00 | $200.00 | $450.00 |
| 0050 | Flowable fill (2103000) | CY | 2 | $3,500.00 | $2,500.00 | $1,800.00 | $3,500.00 | $3,950.00 |
| 0060 | Liquid asphalt binder PG64-22 (4011004) | TON | 22 | $732.25 | $750.00 | $725.00 | $750.00 | $1,250.00 |
| 0070 | Milling existing asphalt pavement 2.0" (4013120) | SY | 1,244.40 | $19.19 | $29.90 | $19.00 | $29.90 | $65.00 |
| 0080 | Asphalt surface course type B (4040320) | TON | 330 | $191.90 | $272.60 | $190.00 | $272.60 | $450.00 |
| 0090 | Traffic control (6011000) | LS | 1 | $71,004 | $85,000 | $45,000 | $100,540 | $150,000 |
| 0100 | Permanent construction signs (ground mounted) (6051120) | SF | 280 | $6.55 | $14.00 | $6.25 | $6.55 | $11.00 |
| 0110 | Pavement marking(temporary- thermoplastic)-4"white solid line (609115C) | LF | 1,220 | $0.01 | $1.50 | $1.50 | $1.50 | $8.00 |
| 0120 | Pavement marking(temp.- thermoplastic)4" yellow solid lines (609115D) | LF | 1,200 | $0.01 | $1.50 | $1.50 | $1.50 | $8.00 |
| 0130 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 1,220 | $1.50 | $1.50 | $1.50 | $1.50 | $8.00 |
| 0140 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 1,220 | $1.50 | $1.50 | $1.50 | $1.50 | $8.00 |
| 0150 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 16 | $7.50 | $7.50 | $7.50 | $7.50 | $44.00 |
| 0160 | Milled-in rumble strip (6321000) | MI | 0.15 | $59,211 | $60,000 | $55,000 | $60,000 | $100,000 |
| 0170 | Epoxy crack injection (7013446) | LF | 150 | $85.00 | $125.00 | $182.00 | $125.00 | $185.00 |
| 0180 | Structural steel (7091120) | LB | 1,584 | $50.00 | $18.00 | $25.00 | $32.11 | $115.00 |
| 0190 | Cleaning and painting existing structural steel (7101000) | LS | 1 | $1.00 | $5,000.00 | $245,000 | $75,000 | $385,000 |
| 0200 | Removal of epoxy, asphalt & foreign overlay (7260100) | SY | 653.30 | $19.19 | $82.00 | $33.00 | $81.95 | $285.00 |
| 0210 | Rip-rap (class B) (8041020) | TON | 341 | $65.00 | $350.00 | $110.00 | $200.00 | $395.00 |
| 0220 | Geotextile for erosion control under riprap(class 2)type A (8048200) | SY | 182 | $5.00 | $12.00 | $20.00 | $30.00 | $6.00 |
| 0230 | BR006 - reinforced concrete tee-beam repair type A (8990011) | CF | 5 | $700.00 | $4,000.00 | $2,750.00 | $4,500.00 | $2,850.00 |
| 0240 | Bridge pile wrap (8990017) | LF | 160 | $625.00 | $950.00 | $675.00 | $2,250.00 | $1,650.00 |
| 0250 | BR004 - reinforced concrete repair type 1 (8990018) | CF | 5 | $700.00 | $3,000.00 | $2,200.00 | $5,000.00 | $2,500.00 |
| 0260 | BR005 - reinforced concrete repair type 2 (8990019) | CF | 5 | $700.00 | $3,000.00 | $2,900.00 | $5,000.00 | $2,500.00 |
| 0270 | BR010 – deck joint repair type 1 (8990020) | LF | 168 | $50.00 | $165.00 | $170.00 | $350.00 | $325.00 |
| 0280 | BR040 – corrosion inhibiting bonding agent (8990023) | SF | 250 | $20.00 | $65.00 | $16.00 | $245.00 | $25.00 |
| 0290 | Cleaning & painting existing steel piling (8990026) | EACH | 16 | $12,500 | $3,000.00 | $4,500.00 | $12,915 | $25,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of April 8, 2025. Compiled by Mirage Metrics.