Dane Construction, LLC: SCDOT bid record

Dane Construction, LLC submitted 77 bids on South Carolina DOT contracts in the data, from 08 MAR 2022 to 13 OCT 2026, and was the low bidder on 14 of them (18%). When it was not low, its total sat a median +20% above the low bid.

Owner
South Carolina DOT
Low bid volume
$42,734,639
Latest bid
13 OCT 2026
Data through
13 OCT 2026
77Bids
14Low bids
18Win rate, percent
+20%Median gap to the low bid when not low, 60 bids

By year

YearBidsLow bidsWin rate
2022500%
202312542%
20241616%
202529621%
202615213%
Dane Construction, LLC, SCDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 423313%
District 313215%
District 711218%
District 29222%
District 58338%
District 17229%
District 6200%
Dane Construction, LLC, SCDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Permanent yellow pavement markers BI-dir.- 4"X4"6301100EACH5947 (80%)$8.50$6.50
4" white solid lines (PVT. edge lines) thermo.- 90 mil.6271010LF5234 (65%)$1.00$0.54
4" yellow solid lines(PVT.edge lines) thermo- 90 mil.6271074LF5033 (66%)$1.00$0.55
Selective watering8109050GAL5230 (58%)$0.05$0.07
Fertilizer (nitrogen)8104005LB5628 (50%)$2.05$2.50
Fertilizer (phosphoric acid)8104010LB5628 (50%)$2.05$2.50
Fertilizer (potash)8104015LB5628 (50%)$2.05$2.50
Unclassified excavation2031000CY5927 (46%)$26.00$42.80
Mowing8109901ACRE5427 (50%)$450.00$500.00
MT3 leading end treatment TL38051151EACH3627 (75%)$3,400.00$3,500.00
Liquid asphalt binder PG64-224011004TON6826 (38%)$750.00$715.00
Rip-rap (class B)8041020TON6226 (42%)$99.50$118.00
Dane Construction, LLC, SCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Dane Construction, LLC, SCDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
13 OCT 20262378290District 3S-978 Tugaloo Road Bridge Replacement in Greenville4 of 8$1,545,209+19%
13 OCT 20264673600District 4Br Replacement S-46-832 over Branch of Catawba River7 of 8$2,616,984+26%
09 SEP 20262069920District 4Three Bridge Replacements in Fairfield County5 of 9$8,390,344+12%
09 SEP 20262375800District 3S-507 Brooks Ave Bridge Replacement in Greenville County2 of 5$4,936,909+6.0%
11 AUG 20261871410District 6Replacement of a 375 foot bridge on Horseford Road (S-56) ov4 of 4$9,084,213+44%
11 AUG 20262970980District 4S-55 (Van Wyck Rd) bridge Replacement over Twelve Mile Creek4 of 7$9,711,260+13%
11 AUG 20263873080District 7Replacement of a 60 foot bridge on S-921 of 7$2,730,179Low, 4.0% under the second
11 AUG 20264275670District 3Bridge Replacement - S-234 over Tributary to Enoree River2 of 10$2,401,123+8.0%
12 MAY 20260274010District 7Emergency Culvert Replacement – Altees Corbett Rd. (S-2-111) in Aiken County5 of 9$986,399+26%
12 MAY 20262575620District 7Bridge Replacement - Rock Spring Road (S-25-51) over Mill Creek3 of 8$2,084,653+6.0%
14 APR 20262375350District 3Bridge Repair US 29 over Enoree River in Greenville County4 of 4$8,830,108+66%
10 MAR 20261063020District 6S-390 (Toogodoo Rd) Bridge Replacement over Swinton Creek4 of 4$7,079,512+49%
10 MAR 20262473910District 2S-24-102 over Ninety Six Creek Bridge Replacement Asset 25471 of 8$6,059,969Low, 2.0% under the second
13 JAN 20262971000District 4S-294(Uriah Rd) Bridge Replacement over Camp Branch Rd4 of 6$2,474,101+59%
13 JAN 20263562410District 5SC 9 BUS (Cheraw St) Bridge Replacement over Crooked Creek4 of 4$8,792,635+27%
09 DEC 20250962450District 7SC 172 (Bull Swamp Rd) Bridge Replacement over Caw Caw Swamp5 of 6$2,816,541+5.0%
09 DEC 20252974910District 4SC 9 Bridge Replacement Over Wildcat Creek4 of 4$14,034,839+19%
09 DEC 20253470990District 5S-87 (Shannon Rd.) Bridge Replacement over Smith Swamp4 of 4$4,893,440+30%
09 DEC 20253866050District 7Bridge Replacement of Closed FA/Non-NHS Secondary Bridge6 of 8$2,188,687+15%
09 DEC 20254466010District 4S-16 (Sardis Rd.) over Tyger River Bridge Replacement9 of 9$14,419,918+72%
12 NOV 20252074200District 4SC 200 Bridge Replacement over Minton Creek - Asset ID 2786 of 10$6,850,743+18%
12 NOV 20253966480District 3Bridge replacement on S-250 ( Hester Store Road) o7 of 7$4,080,922+36%
12 NOV 20254674600District 4S-884 over Fishing Creek Bridge Replacement in York County5 of 6$3,426,154+29%
14 OCT 20250251970District 7S-22 over South Edisto River #12 of 4$5,388,535+6.0%
14 OCT 20251274610District 4SC 72 BRO South Fork Creek - Asset ID 3306 of 6$14,069,836+18%
Dane Construction, LLC: latest SCDOT bids in the data

How this record was read

SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy