Aos Specialty Contractors, Inc.: SCDOT bid record
Aos Specialty Contractors, Inc. submitted 61 bids on South Carolina DOT contracts in the data, from 08 MAR 2022 to 13 OCT 2026, and was the low bidder on 18 of them (30%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $45,490,620
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 5 | 63% |
| 2023 | 5 | 3 | 60% |
| 2024 | 5 | 4 | 80% |
| 2025 | 23 | 2 | 9% |
| 2026 | 20 | 4 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 19 | 9 | 47% |
| District 4 | 14 | 3 | 21% |
| District 7 | 13 | 2 | 15% |
| District 2 | 7 | 2 | 29% |
| District 5 | 3 | 1 | 33% |
| District 3 | 3 | 0 | 0% |
| District 6 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Stabilized construction entrance | 8156490 | SY | 56 | 35 (63%) | $10.25 | $23.00 |
| Agricultural granular lime | 8105005 | LB | 44 | 18 (41%) | $0.50 | $0.60 |
| Fertilizer (nitrogen) | 8104005 | LB | 44 | 14 (32%) | $2.58 | $2.50 |
| Fertilizer (phosphoric acid) | 8104010 | LB | 44 | 14 (32%) | $2.58 | $2.50 |
| Fertilizer (potash) | 8104015 | LB | 44 | 14 (32%) | $2.58 | $2.50 |
| Construction stakes, lines & grades | 1050800 | EACH | 58 | 13 (22%) | $28,258 | $30,000 |
| Pedestrian ramp construction | 7209000 | SY | 29 | 13 (45%) | $125.00 | $150.00 |
| Concrete sidewalk(4" uniform) | 7204100 | SY | 28 | 12 (43%) | $70.00 | $78.00 |
| Silt fence | 8153000 | LF | 56 | 11 (20%) | $4.47 | $4.00 |
| Detectable warning material | 7204900 | SF | 28 | 11 (39%) | $46.50 | $50.00 |
| Temporary barrier fence (orange) | 8068301 | LF | 27 | 10 (37%) | $3.49 | $4.00 |
| Unclassified excavation | 2031000 | CY | 50 | 8 (16%) | $51.20 | $42.80 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eagle Construction Company | 24 | 12 of 24 |
| Palmetto Corp. of Conway | 22 | 4 of 22 |
| Dane Construction, LLC | 19 | 12 of 19 |
| Site-Prep, Inc. of NC | 15 | 13 of 15 |
| Coogler Construction, Inc. | 15 | 11 of 15 |
| L-J, Inc. | 14 | 1 of 14 |
| Palmetto Sitework Services, LLC | 14 | 7 of 14 |
| Reeves Construction Company | 12 | 6 of 12 |
| Cherokee, Inc. | 12 | 6 of 12 |
| United Infrastructure Group, Inc. | 9 | 5 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 2973031 | District 4 | Intersection Improvement - SC 5 at S-358 (Steel Hill Road) | 9 of 9 | $2,697,170 | +82% |
| 13 OCT 2026 | 4673600 | District 4 | Br Replacement S-46-832 over Branch of Catawba River | 8 of 8 | $2,995,464 | +44% |
| 09 SEP 2026 | 0965790 | District 7 | Safety Improvement - US 21/ SC 172/ SC 6 (Calhoun Co) | 7 of 8 | $3,347,239 | +30% |
| 09 SEP 2026 | 2069920 | District 4 | Three Bridge Replacements in Fairfield County | 6 of 9 | $9,342,556 | +25% |
| 09 SEP 2026 | 4672780 | District 4 | New Gray Rock Road Multipurpose Trail | 1 of 3 | $3,597,959 | Low, 30% under the second |
| 11 AUG 2026 | 2970980 | District 4 | S-55 (Van Wyck Rd) bridge Replacement over Twelve Mile Creek | 7 of 7 | $11,562,953 | +34% |
| 11 AUG 2026 | 3276951 | District 1 | Replace the existing culvert along S-59 (Devils Backbone Rd | 5 of 11 | $1,629,262 | +26% |
| 11 AUG 2026 | 3873080 | District 7 | Replacement of a 60 foot bridge on S-92 | 7 of 7 | $4,119,530 | +51% |
| 09 JUN 2026 | 2163100 | District 5 | SC 403 (N Bethel Rd) at SC 341 (Olanta Hwy) Intersection Imp | 2 of 5 | $2,799,443 | +2.0% |
| 09 JUN 2026 | 2176510 | District 5 | Johnsonville (Stuckey Rd., East Marion St., South Jackson Av | 2 of 4 | $415,874 | +10% |
| 12 MAY 2026 | 0274010 | District 7 | Emergency Culvert Replacement – Altees Corbett Rd. (S-2-111) in Aiken County | 3 of 9 | $894,545 | +14% |
| 12 MAY 2026 | 0876380 | District 6 | Sidewalk Improvements in Moncks Corner | 3 of 5 | $1,352,967 | +4.0% |
| 12 MAY 2026 | 4059900 | District 1 | Safety Improvement - SC 764 (Richland Co) | 2 of 7 | $368,627 | +25% |
| 12 MAY 2026 | 4373182 | District 1 | Intersection Improvement-US 378 and S-490 in Sumter County | 1 of 3 | $1,396,219 | Low, 18% under the second |
| 14 APR 2026 | 2372300 | District 3 | Intersection Improvement S-540 @ L-1969 | 3 of 8 | $1,674,862 | +16% |
| 14 APR 2026 | 3872110 | District 7 | Orangeburg SC 389 @ SC 394 Int. Improvement | 1 of 6 | $2,038,982 | Low, 1.0% under the second |
| 10 MAR 2026 | 2473910 | District 2 | S-24-102 over Ninety Six Creek Bridge Replacement Asset 2547 | 6 of 8 | $7,185,205 | +19% |
| 10 MAR 2026 | 4466030 | District 4 | SC 49 Sidewalk in Union | 1 of 1 | $270,467 | Low |
| 13 JAN 2026 | 0657500 | District 7 | Bike/Ped Enhancements along SC 3 (Marlboro Ave.) | 4 of 4 | $6,303,156 | +15% |
| 13 JAN 2026 | 4070850 | District 1 | S-40-64 Arcadia Lakes Drive over Coopers Pond | 3 of 7 | $2,673,165 | +3.0% |
| 09 DEC 2025 | 0962450 | District 7 | SC 172 (Bull Swamp Rd) Bridge Replacement over Caw Caw Swamp | 3 of 6 | $2,770,567 | +3.0% |
| 09 DEC 2025 | 3265530 | District 1 | Roundabout at SC 6 and S-65 | 7 of 8 | $3,446,627 | +30% |
| 09 DEC 2025 | 3866050 | District 7 | Bridge Replacement of Closed FA/Non-NHS Secondary Bridge | 8 of 8 | $2,269,512 | +19% |
| 09 DEC 2025 | 4466010 | District 4 | S-16 (Sardis Rd.) over Tyger River Bridge Replacement | 5 of 9 | $10,487,764 | +25% |
| 12 NOV 2025 | 2074200 | District 4 | SC 200 Bridge Replacement over Minton Creek - Asset ID 278 | 2 of 10 | $5,914,752 | +2.0% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.