SCDOT contract 4466010 bid tabulation
S-16 (Sardis Rd.) over Tyger River Bridge Replacement. Let by South Carolina DOT on December 9, 2025, Union, District 4. 9 bids received; low bid $8,397,484 by United Infrastructure Group, Inc..
- Owner
- South Carolina DOT
- Letting
- 09 DEC 2025
- Pay items
- 88
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | United Infrastructure Group, Inc. | $8,397,484 | Low |
| 2 | Zachry Construction Corporation | $9,628,069 | +15% |
| 3 | Coogler Construction, Inc. | $9,973,326 | +19% |
| 4 | Crowder Construction Company | $10,409,972 | +24% |
| 5 | Aos Specialty Contractors, Inc. | $10,487,764 | +25% |
| 6 | Reeves Construction Company | $11,709,133 | +39% |
| 7 | Mastec Civil, LLC | $11,979,625 | +43% |
| 8 | Lee Construction Company of the | $14,391,657 | +71% |
| 9 | Dane Construction, LLC | $14,419,918 | +72% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. United Infrastructure Group, Inc. | 2. Zachry Construction Corporation | 3. Coogler Construction, Inc. | 4. Crowder Construction Company | 5. Aos Specialty Contractors, Inc. | 6. Reeves Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $419,875 | $960,000 | $741,900 | $520,499 | $446,841 | $585,450 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $251,925 | $289,000 | $111,559 | $208,199 | $80,939 | $351,230 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $40,000 | $100,000 | $36,250 | $35,000 | $92,593 | $42,050 |
| 0040 | CPM progress schedule (1080300) | LS | 1 | $5,000.00 | $15,000 | $20,000 | $20,000 | $47,991 | $10,000 |
| 0050 | Clearing & grubbing within right of way (2011000) | LS | 1 | $215,000 | $500,000 | $113,000 | $40,000 | $285,470 | $1,857,000 |
| 0060 | Removal of structures & obstructions (2021000) | LS | 1 | $1.00 | $19,068 | $15,500 | $7,500.00 | $5,000.00 | $5,000.00 |
| 0070 | Removal & disposal of existing asphalt pavement (2025000) | SY | 2,193 | $17.00 | $15.93 | $10.00 | $25.33 | $11.00 | $18.00 |
| 0080 | Removal of exist. guardrail (2027801) | LF | 1,733 | $1.02 | $1.00 | $5.00 | $1.00 | $2.00 | $1.00 |
| 0090 | Removal & disposal of existing bridge (2028100) | LS | 1 | $1,000,000 | $1,000,000 | $261,000 | $664,302 | $822,851 | $700,000 |
| 0100 | Unclassified excavation (2031000) | CY | 2,453 | $20.00 | $5.00 | $10.00 | $25.29 | $68.00 | $49.00 |
| 0110 | Borrow excavation (2033000) | CY | 26,267 | $33.00 | $26.01 | $29.00 | $28.45 | $36.00 | $34.00 |
| 0120 | Borrow pit set-UP (2033100) | LS | 1 | $1.00 | $1.00 | $10,000 | $26,341 | $22,672 | $20,000 |
| 0130 | Geotextile, stabilization (2036030) | SY | 600 | $5.00 | $2.81 | $4.50 | $8.43 | $3.50 | $7.00 |
| 0140 | Geogrid reinforcement (uniaxial) (2037000) | SY | 6,940 | $8.00 | $7.70 | $8.50 | $26.34 | $13.00 | $10.00 |
| 0150 | Structure excavation for retaining wall (2041005) | CY | 930 | $26.00 | $16.99 | $10.00 | $36.88 | $76.00 | $85.00 |
| 0160 | No. 57 stone for backfill (2052000) | TON | 1,575 | $90.00 | $58.99 | $75.00 | $116.43 | $70.00 | $84.00 |
| 0170 | Stone bridge lift material (2052010) | TON | 1,491 | $60.00 | $62.88 | $55.00 | $100.10 | $78.00 | $84.00 |
| 0180 | Fine grading (2081001) | SY | 4,050 | $12.00 | $6.63 | $7.50 | $10.54 | $15.00 | $11.50 |
| 0190 | Flowable fill (2103000) | CY | 50 | $200.00 | $280.33 | $400.00 | $224.84 | $285.00 | $315.00 |
| 0200 | Liquid asphalt binder PG64-22 (4011004) | TON | 98 | $732.25 | $719.03 | $740.00 | $737.37 | $790.00 | $733.00 |
| 0201 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 519 | $95.95 | $77.04 | $22.00 | $107.93 | $85.00 | $115.00 |
| 0210 | Milling existing asphalt pavement 2.0" (4013120) | SY | 519 | $27.27 | $28.47 | $22.50 | $18.03 | $28.00 | $27.00 |
| 0220 | Asphalt base course - type B (4020320) | TON | 997 | $136.35 | $145.86 | $135.00 | $143.48 | $160.00 | $161.00 |
| 0230 | Asphalt intermediate course type C (4030330) | TON | 319 | $141.40 | $148.94 | $143.00 | $191.41 | $164.00 | $189.00 |
| 0240 | Asphalt surface course type C (4040340) | TON | 581 | $146.45 | $140.72 | $140.00 | $186.06 | $155.00 | $174.00 |
| 0250 | Traffic control (6011000) | LS | 1 | $80,000 | $30,915 | $10,000 | $9,741.87 | $23,148 | $15,000 |
| 0251 | Barricade - type III (6041200) | LF | 84 | $50.00 | $22.26 | $10.00 | $29.62 | $13.00 | $35.00 |
| 0252 | Permanent construction signs (ground mounted) (6051120) | SF | 128 | $6.85 | $10.88 | $42.20 | $8.23 | $8.50 | $6.85 |
| 0253 | Permanent construction signs (barricade mounted) (6051125) | SF | 70 | $6.85 | $10.88 | $14.00 | $8.78 | $8.50 | $6.85 |
| 0254 | Type B - flashing light (608100B) | EACH | 16 | $125.00 | $129.03 | $124.00 | $137.14 | $141.00 | $155.00 |
| 0260 | 4" white solid lines (PVT. edge lines) perm.PVMT.marking (6251010) | LF | 2,546 | $1.50 | $1.55 | $3.00 | $4.12 | $1.70 | $1.50 |
| 0270 | 4" yellow solid lines(PVT.edge lines) perm.PVMT.marking (6251074) | LF | 2,546 | $1.50 | $1.55 | $3.00 | $4.12 | $1.70 | $1.50 |
| 0271 | 4" white solid lines (PVT. edge lines) epoxy paint fast cure (6262010) | LF | 934 | $1.50 | $1.55 | $1.26 | $4.00 | $1.70 | $1.50 |
| 0272 | 4"yellow solid lines- PVT.edge&no passing zone - epoxy paint fast cure (6262110) | LF | 934 | $1.50 | $1.55 | $1.26 | $4.00 | $1.70 | $1.50 |
| 0290 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 14.33 | $28.00 | $27.87 | $106.50 | $15.82 | $30.00 | $28.00 |
| 0300 | Flat sheet, type III, size determined by MSG (6510106) | SF | 3 | $30.00 | $46.45 | $106.50 | $15.82 | $51.00 | $30.00 |
| 0310 | U-section post for sign supports - 2P (6531205) | LF | 40 | $9.25 | $15.23 | $9.90 | $9.61 | $17.00 | $9.25 |
| 0320 | U-section post for sign supports - 3P (6531210) | LF | 12 | $10.15 | $11.35 | $9.90 | $9.61 | $12.00 | $10.15 |
| 0330 | Reflective sign post panels (6531500) | LF | 20.80 | $8.85 | $19.61 | $20.00 | $9.04 | $22.00 | $8.85 |
| 0340 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 2,032 | $7.62 | $26.40 | $15.75 | $20.00 | $14.00 | $16.55 |
| 0350 | Conc. for structures - class 4000 (7011400) | CY | 875.50 | $1,200.00 | $1,163.34 | $2,609.25 | $1,975.00 | $1,725.00 | $1,900.00 |
| 0360 | Grooved surface finish (7023200) | SY | 1,766 | $5.50 | $3.54 | $15.23 | $10.00 | $4.00 | $9.00 |
| 0370 | Reinf. steel for structures (bridge) (7031200) | LB | 259,616 | $1.20 | $1.25 | $1.42 | $1.52 | $2.30 | $1.65 |
| 0380 | Hoop reinforcing steel for structures (bridge) (7031220) | LB | 13,520 | $2.50 | $2.28 | $3.78 | $3.10 | $1.45 | $4.00 |
| 0390 | Prestressed conc. beam (type III) (7043000) | LF | 1,344 | $250.00 | $234.99 | $435.75 | $472.87 | $447.00 | $550.00 |
| 0400 | Prestressed concrete bulb tee beam(74"mod.) (7044574) | LF | 505 | $350.00 | $318.71 | $735.00 | $680.67 | $1,368.00 | $550.00 |
| 0410 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 1,014 | $90.00 | $87.54 | $152.25 | $90.95 | $158.00 | $95.00 |
| 0420 | Pile driving set-UP (7110010) | EACH | 10 | $10,000 | $1,960.98 | $11,550 | $2,000.00 | $9,150.00 | $3,000.00 |
| 0430 | Reinf. pile tips (HP14 X 73) (7111560) | EACH | 10 | $350.00 | $175.69 | $197.40 | $195.00 | $218.00 | $300.00 |
| 0440 | Steel H bearing piling (HP14 X 73) (7112220) | LF | 538 | $50.00 | $94.81 | $84.00 | $60.00 | $72.00 | $85.00 |
| 0450 | Drilled shaft set-UP (7120006) | EACH | 8 | $15,000 | $4,966.28 | $55,388 | $50,000 | $3,952.00 | $45,000 |
| 0460 | Crosshole sonic logging setup (7120010) | EACH | 8 | $2,000.00 | $279.92 | $1,165.50 | $4,500.00 | $2,823.00 | $3,500.00 |
| 0469 | Drilled shaft with wet & dry excavation - 48" diameter (7120161) | LF | 2 | $1,427.06 | $1,237.77 | $2,100.00 | $672.48 | $3,878.00 | $3,434.00 |
| 0470 | Drilled shaft with rock excavation - 48" diameter (7120162) | LF | 67 | $1,028.18 | $1,103.50 | $1,165.50 | $3,497.16 | $4,085.00 | $3,434.00 |
| 0480 | Drilled shaft with wet & dry excavation - 54" diameter (7120171) | LF | 207 | $1,807.27 | $1,923.93 | $2,100.00 | $722.18 | $1,661.00 | $1,450.00 |
| 0490 | Construction casing - 54" diameter (7120175) | LF | 207 | $391.07 | $407.18 | $483.00 | $459.13 | $678.00 | $600.00 |
| 0500 | Prefabricated concrete modular wall (7132000) | SF | 9,460 | $130.00 | $225.00 | $148.00 | $204.78 | $148.00 | $115.00 |
| 0520 | Concrete ditch paving (7206200) | SY | 216 | $125.00 | $123.87 | $110.00 | $164.80 | $31.00 | $370.00 |
| 0530 | Elastomeric bearing (7243100) | EACH | 40 | $1,400.00 | $1,122.04 | $1,575.00 | $3,500.00 | $985.00 | $750.00 |
| 0540 | Waterproofing (7282000) | SY | 26.90 | $110.00 | $126.87 | $173.25 | $250.00 | $111.00 | $180.00 |
| 0550 | Aggregate underdrain(agg#789)with 4"perf.pipe for struc (8011210) | TON | 112.80 | $75.00 | $98.44 | $105.00 | $225.00 | $158.00 | $145.00 |
| 0560 | Rip-rap (class A) (8041010) | TON | 270 | $100.00 | $71.53 | $115.00 | $136.97 | $92.00 | $115.00 |
| 0570 | Rip-rap (class B) (8041020) | TON | 2,087 | $100.00 | $73.60 | $95.00 | $105.36 | $96.00 | $85.00 |
| 0580 | Geotextile for erosion control under riprap(class 2)type A (8048200) | SY | 400 | $9.00 | $3.32 | $4.50 | $15.80 | $3.50 | $7.00 |
| 0590 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 2,509 | $9.00 | $3.32 | $4.50 | $12.64 | $3.50 | $7.00 |
| 0600 | MT3 leading end treatment TL3 (8051151) | EACH | 4 | $3,146.50 | $3,184.27 | $4,193.58 | $3,100.00 | $3,388.00 | $3,100.00 |
| 0610 | MGS3 GR standard shoulder (8052100) | LF | 800 | $23.34 | $23.63 | $33.10 | $23.00 | $26.00 | $23.00 |
| 0620 | MTBBC3 MASH thrie-beam barrier connector TL3 (8053253) | EACH | 4 | $2,842.00 | $2,876.11 | $4,583.78 | $2,800.00 | $3,387.00 | $2,800.00 |
| 0630 | Non-mow strip under guardrail (8055250) | SY | 658 | $115.00 | $51.36 | $80.00 | $73.33 | $97.00 | $95.00 |
| 0631 | Temporary barrier fence (orange) (8068301) | LF | 305 | $4.07 | $3.80 | $4.75 | $6.00 | $3.50 | $2.95 |
| 0640 | Permanent cover (8100100) | ACRE | 2.21 | $1,882.56 | $1,422.65 | $3,500.00 | $1,815.56 | $2,149.00 | $1,853.35 |
| 0650 | Temporary cover (8100200) | ACRE | 1.10 | $1,475.52 | $775.52 | $3,500.00 | $1,534.28 | $1,914.00 | $1,446.06 |
| 0660 | Straw or hay mulch with tackifier (8101110) | ACRE | 1.76 | $1,475.52 | $2,182.77 | $5,500.00 | $2,870.16 | $1,862.00 | $1,449.18 |
| 0670 | Fertilizer (nitrogen) (8104005) | LB | 220.59 | $2.04 | $1.87 | $24.00 | $1.79 | $3.39 | $2.00 |
| 0680 | Fertilizer (phosphoric acid) (8104010) | LB | 220.59 | $2.04 | $1.87 | $24.00 | $1.79 | $3.39 | $2.00 |
| 0690 | Fertilizer (potash) (8104015) | LB | 220.59 | $2.04 | $1.87 | $24.00 | $1.79 | $3.39 | $2.00 |
| 0700 | Agricultural granular lime (8105005) | LB | 4,411.70 | $0.51 | $0.26 | $1.50 | $0.54 | $0.73 | $0.50 |
| 0710 | Selective watering (8109050) | GAL | 54,300 | $0.01 | $0.10 | $0.25 | $0.33 | $0.23 | $0.01 |
| 0720 | Mowing (8109901) | ACRE | 6.62 | $483.36 | $490.32 | $1,500.00 | $179.27 | $565.00 | $475.00 |
| 0750 | Temporary erosion control blanket (ecb) (8151110) | MSY | 5.28 | $1,679.04 | $1,443.19 | $2,460.00 | $2,228.23 | $1,752.00 | $1,651.25 |
| 0760 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 4.86 | $3,307.20 | $5,505.71 | $5,000.00 | $2,970.68 | $4,294.00 | $3,253.00 |
| 0780 | Silt fence (8153000) | LF | 5,451 | $4.07 | $3.53 | $4.75 | $4.26 | $3.95 | $4.00 |
| 0790 | Replace/repair silt fence (8153090) | LF | 545.10 | $2.23 | $3.85 | $4.75 | $1.69 | $7.35 | $2.50 |
| 0800 | Cleaning silt basins (8154010) | CY | 34 | $24.00 | $20.40 | $30.00 | $35.90 | $135.00 | $70.00 |
| 0810 | Removal of silt retained by silt fence (8154050) | LF | 1,362.75 | $9.00 | $4.26 | $4.00 | $1.69 | $9.00 | $2.50 |
| 0820 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 3.25 | $120.00 | $1,146.79 | $75.00 | $153.85 | $118.00 | $295.00 |
| 0830 | Stabilized construction entrance (8156490) | SY | 550 | $25.00 | $26.79 | $20.00 | $30.77 | $22.00 | $25.00 |
| 0840 | Subsurface exploration (8990054) | LS | 1 | $22,000 | $17,548 | $10,500 | $15,000 | $100,545 | $37,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of December 9, 2025. Compiled by Mirage Metrics.