Low bidders on SCDOT contracts carried a median of $4.60 per SY for this item, over the 24 months to 13 OCT 2026, across 61 low bids. Half of all 306 bids fell between $4.00 and $9.00.

Owner
South Carolina DOT
Item
8048210
Unit
SY
Data through
13 OCT 2026

SCDOT prints this item as “GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C”.

$4.60Low bidder's median, per SY
$6.00Median of all bids, per SY
61Contracts in the window

By year of letting

Geotextile for erosion control under riprap(class 2)type C, SCDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20221919$4.5065$5.06
20231717$5.0056$6.00
20241919$6.0067$6.00
20253333$4.60153$5.90
20262222$5.00132$6.00

Bid prices as published, not adjusted for inflation.

By district

DistrictLow bidsLow-bid medianAll bidsMedian, all bids
District 416$5.0095$6.00
District 310$4.3755$5.50
District 79$5.0054$7.75
District 27$3.5033$5.00
District 16$4.8632$5.00
District 56$4.8014$5.00
District 65$7.0013$7.00
Geotextile for erosion control under riprap(class 2)type C, SCDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Quantity (SY)Low bidsLow-bid median
20 to 10015$5.00
113 to 40015$5.00
416 to 93315$4.75
1,032 to 3,39216$3.50
Geotextile for erosion control under riprap(class 2)type C, SCDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

Geotextile for erosion control under riprap(class 2)type C, SCDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
13 OCT 20262378290District 3500$7.00$8.008Reeves Construction CompanySCDOT
13 OCT 20264673600District 42,083$2.50$7.508Kemp Sigmon Construction Co., Inc.SCDOT
09 SEP 20260277850District 7170$5.00$34.382Satterfield Construction Company, Inc.SCDOT
09 SEP 20260772100District 660$67.00$11.003Apac-Atlantic Inc.SCDOT
09 SEP 20260965790District 7444$2.40$5.008Palmetto Sitework Services, LLCSCDOT
09 SEP 20262069920District 4851$2.50$8.009Kemp Sigmon Construction Co., Inc.SCDOT
09 SEP 20262375800District 3669$4.75$6.005Wright Brothers Construction Company,SCDOT
09 SEP 20264672780District 4535$7.65$7.653Aos Specialty Contractors, Inc.SCDOT
11 AUG 20261871410District 650$5.00$5.004United Infrastructure Group, Inc.SCDOT
11 AUG 20262970980District 43,098$5.00$4.007United Infrastructure Group, Inc.SCDOT
11 AUG 20263276951District 1254$3.30$6.7511Site-Prep, Inc. of NCSCDOT
11 AUG 20263873080District 750$3.50$5.007Dane Construction, LLCSCDOT
11 AUG 20264275670District 3397$2.30$4.9210United Infrastructure Group, Inc.SCDOT
12 MAY 20262575620District 750$8.80$9.008Southeastern Site Development, Inc.SCDOT
14 APR 20262372300District 336$20.50$13.508Reeves Construction CompanySCDOT
Latest SCDOT contracts carrying Geotextile for erosion control under riprap(class 2)type C

Filter this item by your own quantity, district and period, or check your price against it, in the SCDOT explorer.

How these prices were read

SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are SCDOT's own: this item is compared with SCDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the SCDOT letting of 13 OCT 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy