SCDOT contract 2372300 bid tabulation
Intersection Improvement S-540 @ L-1969. Let by South Carolina DOT on April 14, 2026, Greenville, District 3. 8 bids received; low bid $1,439,000 by Reeves Construction Company.
- Owner
- South Carolina DOT
- Letting
- 14 APR 2026
- Pay items
- 84
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Reeves Construction Company | $1,439,000 | Low |
| 2 | Southern Concrete & Construction, Inc. | $1,543,121 | +7.0% |
| 3 | Aos Specialty Contractors, Inc. | $1,674,862 | +16% |
| 4 | S and S Construction, Inc. of Anderson | $1,896,533 | +32% |
| 5 | Eagle Construction Company | $1,928,301 | +34% |
| 6 | Civil Pros Inc | $2,031,140 | +41% |
| 7 | McMurria Grading LLC | $2,134,069 | +48% |
| 8 | King Asphalt, Inc. | $2,174,510 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Reeves Construction Company | 2. Southern Concrete & Construction, Inc. | 3. Aos Specialty Contractors, Inc. | 4. S and S Construction, Inc. of Anderson | 5. Eagle Construction Company | 6. Civil Pros Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $140,000 | $164,850 | $100,000 | $98,800 | $130,000 | $95,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $17,150 | $11,500 | $35,000 | $35,600 | $17,000 | $55,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $26,000 | $9,200.00 | $25,000 | $21,500 | $59,000 | $10,000 |
| 0040 | CPM progress schedule (1080300) | LS | 1 | $7,700.00 | $8,500.00 | $10,000 | $12,900 | $5,000.00 | $10,010 |
| 0050 | Clearing & grubbing within right of way (2011000) | LS | 1 | $48,000 | $50,000 | $115,500 | $137,500 | $58,500 | $15,000 |
| 0060 | Removal & disposal of existing asphalt pavement (2025000) | SY | 240 | $17.00 | $45.00 | $55.00 | $25.00 | $25.00 | $15.00 |
| 0070 | Unclassified excavation (2031000) | CY | 185 | $61.00 | $65.00 | $89.00 | $100.00 | $200.00 | $100.00 |
| 0080 | Borrow excavation (2033000) | CY | 1,225 | $46.00 | $45.00 | $45.00 | $59.50 | $80.00 | $30.00 |
| 0090 | Fine grading (2081001) | SY | 1,300 | $8.25 | $4.00 | $7.00 | $11.00 | $6.00 | $10.00 |
| 0100 | Maintenance stone (3059900) | TON | 60 | $120.00 | $65.00 | $60.00 | $50.00 | $54.00 | $60.00 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 119 | $750.00 | $797.50 | $1,000.00 | $900.00 | $900.00 | $775.00 |
| 0120 | Full depth asph. pav. patching 8" unif (4012080) | SY | 150 | $190.00 | $214.50 | $250.00 | $300.00 | $250.00 | $253.77 |
| 0130 | Milling existing asphalt pavement 2.0" (4013120) | SY | 3,875 | $4.25 | $12.10 | $5.50 | $16.00 | $9.00 | $10.56 |
| 0140 | Asphalt base course - type A (4020310) | TON | 341 | $188.00 | $269.50 | $300.00 | $190.00 | $225.00 | $122.26 |
| 0160 | Asphalt intermediate course type B (4030320) | TON | 113 | $340.00 | $310.20 | $450.00 | $200.00 | $300.00 | $231.25 |
| 0165 | Asphalt surface course type B (4040320) | TON | 1,710 | $93.00 | $144.10 | $130.00 | $165.00 | $175.00 | $230.24 |
| 0170 | Asphalt surface course type E (4040360) | TON | 108 | $200.00 | $357.50 | $270.00 | $260.00 | $300.00 | $242.85 |
| 0180 | Traffic control (6011000) | LS | 1 | $105,000 | $112,500 | $160,000 | $169,750 | $163,500 | $535,000 |
| 0190 | Permanent construction signs (ground mounted) (6051120) | SF | 368 | $7.00 | $12.10 | $10.50 | $12.60 | $15.00 | $10.99 |
| 0200 | Temporary clear pavement markers mono-dir.- 4"X4" (6092100) | EACH | 10 | $8.00 | $8.25 | $8.25 | $12.00 | $9.50 | $8.25 |
| 0210 | Temporary yellow pavement markers mono-dir.- 4"X4" (6092150) | EACH | 20 | $8.00 | $8.25 | $8.25 | $12.00 | $9.50 | $8.25 |
| 0220 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 60 | $8.00 | $8.25 | $8.25 | $12.00 | $9.50 | $8.25 |
| 0230 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 690 | $0.16 | $0.17 | $0.20 | $0.60 | $0.25 | $0.17 |
| 0240 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 390 | $0.16 | $0.17 | $0.20 | $0.60 | $0.25 | $0.17 |
| 0250 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 1,380 | $0.27 | $0.28 | $0.30 | $2.50 | $0.40 | $0.28 |
| 0260 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 2,535 | $1.60 | $1.65 | $1.65 | $1.95 | $2.00 | $1.65 |
| 0270 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 8,700 | $0.16 | $0.17 | $0.20 | $0.60 | $0.20 | $0.17 |
| 0280 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 230 | $1.35 | $1.38 | $1.40 | $1.95 | $1.75 | $1.38 |
| 0290 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 130 | $1.35 | $1.38 | $1.40 | $1.95 | $1.75 | $1.38 |
| 0300 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 460 | $3.25 | $3.30 | $3.30 | $4.80 | $3.75 | $3.30 |
| 0310 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 845 | $9.50 | $9.90 | $10.00 | $12.00 | $11.50 | $9.90 |
| 0320 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 2,900 | $1.35 | $1.38 | $1.40 | $1.58 | $1.75 | $1.38 |
| 0330 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 10 | $8.00 | $8.25 | $8.25 | $12.00 | $9.50 | $8.25 |
| 0340 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 20 | $8.00 | $8.25 | $8.25 | $12.00 | $9.50 | $8.25 |
| 0350 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 60 | $8.00 | $8.25 | $8.25 | $12.00 | $9.50 | $8.25 |
| 0360 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 10 | $30.00 | $27.50 | $38.50 | $25.00 | $80.00 | $27.45 |
| 0370 | U-section post for sign supports - 3P (6531210) | LF | 24 | $9.00 | $22.00 | $35.00 | $18.50 | $35.00 | $16.49 |
| 0380 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 320 | $15.00 | $19.92 | $20.00 | $15.92 | $24.50 | $19.92 |
| 0390 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 700 | $19.00 | $20.71 | $20.80 | $20.55 | $25.50 | $20.71 |
| 0400 | Furnish & install 6.0" schedule 80 PVC conduit (675027O) | LF | 70 | $43.00 | $44.00 | $82.00 | $80.00 | $150.00 | $50.00 |
| 0410 | Furnish & install no. 14 copper wire, 4 conductor - black (6770388) | LF | 1,350 | $4.35 | $5.82 | $5.85 | $3.50 | $6.25 | $5.82 |
| 0420 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 2,360 | $4.35 | $5.93 | $5.85 | $5.50 | $6.25 | $5.93 |
| 0430 | Furnish & install no. 14 copper wire, 8 conductor (black) (6770393) | LF | 500 | $5.45 | $6.15 | $6.20 | $6.00 | $6.75 | $6.15 |
| 0440 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 1,630 | $3.25 | $1.27 | $1.25 | $1.98 | $2.00 | $1.27 |
| 0450 | Sawcut for loop detector (6780495) | LF | 630 | $9.50 | $10.95 | $11.00 | $8.90 | $10.00 | $10.95 |
| 0460 | Furnish & install electrical service for traffic signal (6800499) | EACH | 1 | $2,700.00 | $1,745.67 | $1,750.00 | $2,450.00 | $2,700.00 | $1,745.67 |
| 0470 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 7 | $925.00 | $914.29 | $920.00 | $765.00 | $900.00 | $914.29 |
| 0480 | F&I-17"X30"X24"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (680052C) | EACH | 1 | $1,100.00 | $1,156.10 | $1,160.00 | $1,100.00 | $1,250.00 | $1,156.10 |
| 0490 | Furnish & install 3/8" galvanized steel cable (6825092) | LF | 350 | $9.50 | $10.40 | $10.50 | $8.50 | $10.00 | $10.40 |
| 0500 | Furnish & install 10' break- away alum pedestal pole and base (6825484) | EACH | 4 | $2,700.00 | $2,072.95 | $2,080.00 | $2,300.00 | $2,700.00 | $2,072.95 |
| 0510 | F&I - contr 332/336 cabinet assembly - base mounted 123 (6845511) | EACH | 1 | $26,000 | $26,180 | $26,275 | $28,000 | $32,000 | $26,180 |
| 0520 | Furnish & install - 12" 3 (6865723) | EACH | 8 | $925.00 | $880.00 | $885.00 | $1,200.00 | $1,400.00 | $880.00 |
| 0530 | F&I - 1-way-1SECT.hand/man countdown pedestrian signal head (6865782) | EACH | 8 | $925.00 | $896.10 | $990.00 | $1,188.00 | $1,350.00 | $985.71 |
| 0540 | F&I-ped push but.solid state W/ tone assem 9"X15"&sign (R- 10-3E or R10-4A) (6865797) | EACH | 8 | $490.00 | $622.20 | $690.00 | $1,200.00 | $675.00 | $684.42 |
| 0550 | Backplate W/ retrorefl.borders for traff. sig. (6865834) | EACH | 8 | $325.00 | $330.60 | $365.00 | $360.00 | $400.00 | $363.66 |
| 0560 | Furnish & install concrete cabinet foundation (6887951) | EACH | 1 | $2,700.00 | $1,479.00 | $1,630.00 | $2,900.00 | $3,375.00 | $1,626.90 |
| 0570 | 18" R. C. pipe cul. beveled end sectn-CL 3 (7142513) | EACH | 2 | $1,600.00 | $800.00 | $3,300.00 | $1,000.00 | $900.00 | $1,500.00 |
| 0580 | 18" smooth wall pipe (7143618) | LF | 488 | $210.00 | $150.00 | $135.00 | $240.00 | $86.00 | $147.82 |
| 0590 | Catch basin -type 9 (7191205) | EACH | 1 | $3,700.00 | $5,400.00 | $6,700.00 | $3,950.00 | $4,600.00 | $5,000.00 |
| 0600 | Catch basin -type 16 (7191605) | EACH | 7 | $6,900.00 | $6,800.00 | $8,000.00 | $7,400.00 | $7,700.00 | $6,500.00 |
| 0610 | Manhole (7192105) | EACH | 1 | $3,600.00 | $5,800.00 | $5,800.00 | $3,900.00 | $4,500.00 | $5,000.00 |
| 0620 | 36" X 60" junction box (top only) (719619L) | EACH | 2 | $3,100.00 | $2,500.00 | $2,375.00 | $2,600.00 | $3,000.00 | $900.00 |
| 0630 | 60" X 60" junction box (top only) (71961AA) | EACH | 1 | $4,400.00 | $3,500.00 | $1,405.00 | $3,100.00 | $3,500.00 | $1,100.00 |
| 0640 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 32 | $215.00 | $200.00 | $250.00 | $1,250.00 | $3,000.00 | $180.00 |
| 0650 | Concrete curb (9" X 15") (7201000) | LF | 12 | $70.00 | $65.00 | $54.50 | $85.00 | $100.00 | $100.00 |
| 0660 | Concrete curb (transition) (7201100) | LF | 12 | $38.00 | $35.00 | $54.50 | $85.00 | $100.00 | $100.00 |
| 0670 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 2,060 | $44.50 | $35.00 | $42.40 | $43.50 | $42.00 | $65.00 |
| 0680 | Concrete sidewalk(4" uniform) (7204100) | SY | 580 | $115.00 | $95.00 | $75.00 | $95.00 | $97.00 | $89.00 |
| 0690 | Detectable warning material (7204900) | SF | 105 | $49.00 | $45.00 | $50.00 | $170.00 | $180.00 | $41.00 |
| 0700 | Concrete driveway(6" uniform) (7205000) | SY | 150 | $155.00 | $145.00 | $150.00 | $135.00 | $128.00 | $110.00 |
| 0710 | Pedestrian ramp construction (7209000) | SY | 170 | $135.00 | $125.00 | $150.00 | $330.00 | $375.00 | $115.00 |
| 0720 | Rip-rap (class B) (8041020) | TON | 30 | $185.00 | $85.00 | $125.00 | $125.00 | $88.00 | $75.00 |
| 0730 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 36 | $20.50 | $15.00 | $12.00 | $6.00 | $20.00 | $3.00 |
| 0740 | Right of way marker(rebar and cap) (8091010) | EACH | 19 | $135.00 | $200.00 | $350.00 | $200.00 | $275.00 | $110.00 |
| 0750 | Right of way plat (8091050) | LS | 1 | $1,900.00 | $5,500.00 | $3,865.00 | $4,500.00 | $6,000.00 | $11,660 |
| 0760 | Permanent grassing for small projects (8100101) | ACRE | 0.60 | $6,500.00 | $4,000.00 | $3,865.00 | $6,000.00 | $4,600.00 | $2,200.00 |
| 0770 | Hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 0.83 | $1,550.00 | $4,500.00 | $2,760.00 | $3,000.00 | $1,900.00 | $3,000.00 |
| 0780 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 0.83 | $3,500.00 | $4,500.00 | $4,140.00 | $6,000.00 | $3,800.00 | $3,500.00 |
| 0790 | Inlet structure filter - type F (weighted) (8152004) | LF | 56 | $16.00 | $12.00 | $18.00 | $16.80 | $25.00 | $12.00 |
| 0800 | Inlet structure filter- type F (non-weighted) (8152006) | LF | 56 | $16.00 | $12.00 | $14.50 | $16.80 | $20.00 | $12.00 |
| 0810 | Sediment tubes for ditch checks (8152007) | LF | 80 | $16.00 | $8.00 | $12.00 | $16.80 | $20.00 | $10.00 |
| 0820 | Silt fence (8153000) | LF | 1,700 | $3.25 | $4.50 | $5.50 | $3.85 | $4.00 | $5.00 |
| 0830 | Cleaning silt basins (8154010) | CY | 196 | $13.50 | $3.00 | $45.00 | $6.00 | $80.00 | $65.00 |
| 0840 | Stabilized construction entrance (8156490) | SY | 550 | $33.00 | $1.00 | $8.00 | $25.83 | $31.00 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of April 14, 2026. Compiled by Mirage Metrics.