S and S Construction, Inc. of Anderson: SCDOT bid record
S and S Construction, Inc. of Anderson submitted 16 bids on South Carolina DOT contracts in the data, from 12 APR 2022 to 14 APR 2026, and was the low bidder on 8 of them (50%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $14,695,419
- Latest bid
- 14 APR 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 2 | 67% |
| 2023 | 5 | 3 | 60% |
| 2024 | 3 | 1 | 33% |
| 2025 | 3 | 2 | 67% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 9 | 4 | 44% |
| District 2 | 6 | 4 | 67% |
| District 2, District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Drop inlet (24" X 36") | 7192020 | EACH | 10 | 10 (100%) | $3,730.00 | $5,450.00 |
| Silt fence | 8153000 | LF | 16 | 9 (56%) | $3.73 | $4.00 |
| Temporary cover | 8100200 | ACRE | 12 | 9 (75%) | $950.00 | $1,450.00 |
| Borrow excavation | 2033000 | CY | 11 | 9 (82%) | $16.00 | $49.70 |
| Maintenance stone | 3069900 | TON | 10 | 9 (90%) | $40.00 | $72.00 |
| Stabilized construction entrance | 8156490 | SY | 15 | 8 (53%) | $17.21 | $23.00 |
| Removal & disposal of existing asphalt pavement | 2025000 | SY | 13 | 8 (62%) | $10.04 | $17.00 |
| Fertilizer (nitrogen) | 8104005 | LB | 12 | 7 (58%) | $1.18 | $2.50 |
| Fertilizer (potash) | 8104015 | LB | 12 | 7 (58%) | $1.18 | $2.50 |
| Construction stakes, lines & grades | 1050800 | EACH | 16 | 6 (38%) | $16,900 | $30,000 |
| Fertilizer (phosphoric acid) | 8104010 | LB | 12 | 6 (50%) | $1.62 | $2.50 |
| Cleaning existing pipe | 7149999 | LF | 6 | 6 (100%) | $8.12 | $40.48 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Reeves Construction Company | 10 | 3 of 10 |
| Eagle Construction Company | 9 | 0 of 9 |
| Thrift Development Corporation | 6 | 2 of 6 |
| Universal Civil Construction, LLC | 5 | 2 of 5 |
| Palmetto Corp. of Conway | 3 | 2 of 3 |
| Aos Specialty Contractors, Inc. | 3 | 2 of 3 |
| Palmetto Group Contracting, Inc. | 2 | 0 of 2 |
| Southern Concrete & Construction, Inc. | 2 | 2 of 2 |
| Civil Pros Inc | 2 | 0 of 2 |
| McMurria Grading LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 APR 2026 | 2372300 | District 3 | Intersection Improvement S-540 @ L-1969 | 4 of 8 | $1,896,533 | +32% |
| 10 MAR 2026 | 8872120 | District 2, District 3 | Intersection Improvement US 178 @ S-73/S-27 | 3 of 6 | $2,506,516 | +9.0% |
| 14 OCT 2025 | 4257070 | District 3 | Intersection Safety Improvement | 1 of 4 | $2,296,925 | Low, 7.0% under the second |
| 10 JUN 2025 | 0454510 | District 2 | Intersection Improvement SC 28 at SC 185 | 1 of 4 | $1,275,544 | Low, 11% under the second |
| 10 JUN 2025 | 2372150 | District 3 | Intersection Safety Improvement US 25 / US 25 Conn | 4 of 4 | $1,507,360 | +24% |
| 13 NOV 2024 | 0450000 | District 2 | Intersection Improvements- US 29 @ S-146 (Bowlan Rd)/S-331 (Old Williamston Rd) | 1 of 5 | $4,203,955 | Low, 9.0% under the second |
| 12 MAR 2024 | 0447750 | District 2 | Enhancement - Anderson Co | 2 of 2 | $501,233 | +7.0% |
| 09 JAN 2024 | 8862400 | District 3 | S-42-804 (East Croft Circle) Culvert Repair | 2 of 6 | $784,463 | 0.0% |
| 14 NOV 2023 | 0150490 | District 2 | Downtown Abbeville Sidewalk (FPA-27-18) | 2 of 2 | $493,132 | +29% |
| 14 NOV 2023 | 3750120 | District 3 | Intersection Improvements at SC 59 and SC 182/SC 243 | 1 of 2 | $1,358,668 | Low, 6.0% under the second |
| 12 SEP 2023 | 0457090 | District 2 | Safety Improvement at US 29 / S-96 (Welcome Rd) | 1 of 4 | $2,896,242 | Low, 7.0% under the second |
| 13 JUN 2023 | 4250110 | District 3 | Lyman Livability Connections -- Rail Trail Project | 1 of 5 | $520,477 | Low, 0.0% under the second |
| 10 JAN 2023 | 3957150 | District 3 | Safety improvements - SC 135 / S-95 (Pickens Co) | 2 of 4 | $2,613,452 | +6.0% |
| 08 NOV 2022 | 0486510 | District 2 | Intersection Improvement -S-34 (Anderson Co) | 1 of 2 | $1,596,079 | Low, 16% under the second |
| 14 JUN 2022 | 4251520 | District 3 | Intersection Improvements - US 176/SC 357 | 1 of 3 | $547,531 | Low, 9.0% under the second |
| 12 APR 2022 | 2357220 | District 3 | Safety improvements - SC 81 (Greenville Co) | 3 of 3 | $348,385 | +15% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.