SCDOT contract 0454510 bid tabulation
Intersection Improvement SC 28 at SC 185. Let by South Carolina DOT on June 10, 2025, Anderson, District 2. 4 bids received; low bid $1,275,544 by S and S Construction, Inc. of Anderson.
- Owner
- South Carolina DOT
- Letting
- 10 JUN 2025
- Pay items
- 69
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S and S Construction, Inc. of Anderson | $1,275,544 | Low |
| 2 | Thrift Development Corporation | $1,410,267 | +11% |
| 3 | Eagle Construction Company | $1,529,422 | +20% |
| 4 | Reeves Construction Company | $2,179,436 | +71% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S and S Construction, Inc. of Anderson | 2. Thrift Development Corporation | 3. Eagle Construction Company | 4. Reeves Construction Company |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $39,000 | $76,115 | $55,000 | $160,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $19,000 | $11,763 | $9,800.00 | $25,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $13,000 | $15,000 | $28,000 | $47,850 |
| 0040 | Law enforcement officer (DPS) (1071504) | HR | 80 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0050 | Clearing & grubbing within right of way (2011000) | LS | 1 | $49,388 | $22,000 | $53,000 | $29,100 |
| 0060 | Removal & disposal of existing asphalt pavement (2025000) | SY | 3,160 | $6.25 | $5.50 | $7.50 | $16.00 |
| 0070 | Unclassified excavation (2031000) | CY | 4,468 | $11.44 | $8.60 | $17.20 | $51.00 |
| 0080 | Borrow excavation (2033000) | CY | 1,635 | $8.90 | $28.25 | $42.00 | $53.00 |
| 0090 | Fine grading (2081001) | SY | 4,313 | $10.00 | $2.50 | $1.00 | $5.00 |
| 0100 | Maintenance stone (3059900) | TON | 200 | $39.00 | $23.63 | $37.50 | $128.00 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 206 | $735.00 | $720.00 | $750.00 | $800.00 |
| 0120 | Full depth asph. pav. patching 10"unif (4012100) | SY | 500 | $160.00 | $176.00 | $175.00 | $135.00 |
| 0130 | Milling existing asphalt pavement (variable) (4013990) | SY | 2,293 | $11.50 | $11.83 | $12.00 | $15.00 |
| 0140 | Asphalt base course - type A (4020310) | TON | 1,392 | $135.63 | $137.50 | $133.00 | $175.00 |
| 0150 | Asphalt intermediate course type B (4030320) | TON | 515 | $130.00 | $181.50 | $175.00 | $218.00 |
| 0160 | Asphalt intermediate course type C (4030330) | TON | 926 | $130.00 | $148.50 | $147.00 | $180.00 |
| 0170 | Asphalt surface course type B (4040320) | TON | 1,086 | $133.00 | $132.00 | $129.00 | $163.00 |
| 0180 | Asphalt surface course type E (4040360) | TON | 107 | $150.00 | $231.00 | $235.00 | $340.00 |
| 0190 | Traffic control (6011000) | LS | 1 | $26,900 | $51,089 | $73,500 | $105,000 |
| 0200 | Permanent construction signs (ground mounted) (6051120) | SF | 276 | $10.00 | $8.15 | $10.00 | $9.00 |
| 0210 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 3 | $4,000.00 | $9,000.00 | $6,000.00 | $7,300.00 |
| 0220 | Pavement markings(temp- paint) 4" white broken lines (609105A) | LF | 330 | $0.26 | $0.11 | $0.12 | $0.14 |
| 0230 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 31,020 | $0.19 | $0.11 | $0.12 | $0.14 |
| 0240 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 49,500 | $0.19 | $0.11 | $0.12 | $0.14 |
| 0250 | Pavement markings(temporary-paint)- 24"white solid lines (609135A) | LF | 330 | $1.53 | $1.10 | $1.25 | $1.35 |
| 0260 | Pavement markings(temporary-paint)- white single arrow (609160A) | EACH | 6 | $35.70 | $16.50 | $20.00 | $20.00 |
| 0270 | Pavement markings(temporary-paint)- white word 'only (609180A) | EACH | 6 | $45.90 | $16.50 | $20.00 | $20.00 |
| 0280 | Temporary clear pavement markers mono-dir.- 4"X4" (6092100) | EACH | 50 | $7.65 | $8.25 | $9.00 | $10.00 |
| 0290 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 100 | $7.65 | $8.25 | $9.00 | $10.00 |
| 0300 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 100 | $1.28 | $0.83 | $0.90 | $1.00 |
| 0310 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 4,700 | $0.77 | $0.83 | $0.90 | $1.00 |
| 0320 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 50 | $10.20 | $16.50 | $20.00 | $20.00 |
| 0330 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 7,500 | $0.77 | $0.83 | $0.90 | $1.00 |
| 0340 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 10 | $7.65 | $8.25 | $9.00 | $10.00 |
| 0350 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 90 | $7.65 | $8.25 | $9.00 | $10.00 |
| 0360 | 18" smooth wall pipe (7143618) | LF | 96 | $118.00 | $103.55 | $59.00 | $164.00 |
| 0365 | 18" RC pipe cul.-class V (7141133) | LF | 96 | $128.00 | $135.00 | $75.00 | $158.00 |
| 0370 | Cleaning existing pipe (7149999) | LF | 344 | $3.50 | $25.00 | $60.00 | $14.00 |
| 0380 | 36" X 36" junction box (7192240) | EACH | 1 | $1,000.00 | $2,528.75 | $8,000.00 | $10,000 |
| 0390 | Beveling of pipe end (7199100) | EACH | 5 | $100.00 | $250.00 | $600.00 | $307.00 |
| 0400 | Rip-rap (class A) (8041010) | TON | 89 | $75.00 | $69.85 | $68.00 | $310.00 |
| 0410 | Rip-rap (class B) (8041020) | TON | 224 | $75.00 | $69.85 | $69.50 | $183.00 |
| 0420 | Geotextile for erosion control under riprap(class 2)type B (8048205) | SY | 488 | $2.88 | $3.00 | $3.50 | $17.00 |
| 0430 | Reset fence (8071000) | LF | 206 | $5.00 | $31.90 | $20.00 | $17.00 |
| 0440 | Moving item no. 12' aluminum cattle gate (8081000) | LS | 1 | $100.00 | $1,980.00 | $700.00 | $2,700.00 |
| 0450 | Moving item no. 6' wooden sign (8081000) | LS | 1 | $100.00 | $100.00 | $350.00 | $2,400.00 |
| 0460 | Moving item no. woven wire fence W/one strand barbed wire (8081000) | LS | 1 | $1,400.00 | $6,539.50 | $6,900.00 | $3,400.00 |
| 0470 | Moving item no. woven wire fence W/one strand barbed wire T- posts (8081000) | LS | 1 | $3,500.00 | $16,907 | $16,000 | $10,000 |
| 0480 | Right of way marker(rebar and cap) (8091010) | EACH | 47 | $148.50 | $104.50 | $140.00 | $135.00 |
| 0490 | Right of way plat (8091050) | LS | 1 | $3,300.00 | $3,850.00 | $2,000.00 | $6,800.00 |
| 0500 | Permanent cover (8100100) | ACRE | 3.49 | $1,900.00 | $1,661.00 | $1,750.00 | $2,000.00 |
| 0510 | Temporary cover (8100200) | ACRE | 1.75 | $800.00 | $2,090.00 | $2,200.00 | $2,500.00 |
| 0520 | Fertilizer (nitrogen) (8104005) | LB | 350 | $2.00 | $5.50 | $5.75 | $6.75 |
| 0530 | Fertilizer (phosphoric acid) (8104010) | LB | 350 | $2.00 | $5.50 | $5.75 | $6.75 |
| 0540 | Fertilizer (potash) (8104015) | LB | 350 | $2.00 | $5.50 | $5.75 | $6.75 |
| 0550 | Agricultural granular lime (8105005) | LB | 6,984 | $0.56 | $0.50 | $0.55 | $0.60 |
| 0560 | Selective watering (8109050) | GAL | 54,300 | $0.01 | $0.05 | $0.10 | $0.12 |
| 0570 | Mowing (8109901) | ACRE | 11 | $10.00 | $400.00 | $560.00 | $675.00 |
| 0580 | Temporary erosion control blanket (ecb) (8151110) | MSY | 1.94 | $1,500.00 | $1,870.00 | $1,950.00 | $2,300.00 |
| 0590 | Hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 0.40 | $1,500.00 | $1,595.00 | $1,700.00 | $1,950.00 |
| 0600 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 10.48 | $2,975.00 | $3,146.00 | $3,300.00 | $3,900.00 |
| 0610 | Sediment tubes for ditch checks (8152007) | LF | 500 | $8.50 | $5.50 | $16.00 | $19.00 |
| 0620 | Silt fence (8153000) | LF | 2,000 | $2.65 | $3.00 | $3.75 | $3.00 |
| 0630 | Replace/repair silt fence (8153090) | LF | 500 | $3.50 | $3.00 | $6.00 | $7.00 |
| 0640 | Cleaning silt basins (8154010) | CY | 205 | $4.00 | $30.00 | $15.00 | $80.00 |
| 0650 | Removal of silt retained by silt fence (8154050) | LF | 200 | $0.25 | $6.50 | $5.00 | $33.00 |
| 0660 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 138 | $45.50 | $55.00 | $53.50 | $125.00 |
| 0670 | Stabilized construction entrance (8156490) | SY | 1,100 | $13.20 | $15.30 | $23.00 | $30.00 |
| 0680 | Temporary flexible pipe slope drain - 12" (8157012) | LF | 80 | $6.00 | $30.70 | $41.50 | $90.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of June 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.