Eagle Construction Company: SCDOT bid record
Eagle Construction Company submitted 63 bids on South Carolina DOT contracts in the data, from 08 MAR 2022 to 13 OCT 2026, and was the low bidder on 10 of them (16%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $41,199,908
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 7 | 1 | 14% |
| 2023 | 9 | 2 | 22% |
| 2024 | 14 | 2 | 14% |
| 2025 | 18 | 5 | 28% |
| 2026 | 15 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 16 | 2 | 13% |
| District 3 | 16 | 2 | 13% |
| District 1 | 12 | 2 | 17% |
| District 2 | 11 | 1 | 9% |
| District 7 | 6 | 2 | 33% |
| District 2, District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fine grading | 2081001 | SY | 52 | 43 (83%) | $3.50 | $8.00 |
| 18" smooth wall pipe | 7143618 | LF | 50 | 42 (84%) | $78.25 | $140.00 |
| Rip-rap (class B) | 8041020 | TON | 59 | 41 (69%) | $79.00 | $118.00 |
| Rip-rap (class A) | 8041010 | TON | 36 | 28 (78%) | $75.75 | $106.71 |
| 24" smooth wall pipe | 7143624 | LF | 35 | 26 (74%) | $108.00 | $158.37 |
| Removal & disposal of existing asphalt pavement | 2025000 | SY | 43 | 18 (42%) | $11.00 | $17.00 |
| Aggregate no.5 or 57 for erosion control | 8156410 | TON | 42 | 14 (33%) | $69.50 | $91.62 |
| Maintenance stone | 3069900 | TON | 28 | 13 (46%) | $47.38 | $72.00 |
| Maintenance stone | 3059900 | TON | 28 | 12 (43%) | $52.38 | $92.63 |
| Removal & disposal of existing pavement | 2023000 | SY | 17 | 12 (71%) | $12.00 | $35.00 |
| Geotextile for erosion control under riprap(class 2)type C | 8048210 | SY | 43 | 10 (23%) | $4.50 | $6.00 |
| 30" smooth wall pipe | 7143630 | LF | 15 | 10 (67%) | $132.90 | $200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aos Specialty Contractors, Inc. | 24 | 12 of 24 |
| Reeves Construction Company | 21 | 11 of 21 |
| Dane Construction, LLC | 21 | 15 of 21 |
| Palmetto Corp. of Conway | 11 | 5 of 11 |
| Universal Civil Construction, LLC | 10 | 3 of 10 |
| Palmetto Sitework Services, LLC | 10 | 4 of 10 |
| Coogler Construction, Inc. | 10 | 7 of 10 |
| L-J, Inc. | 9 | 3 of 9 |
| S and S Construction, Inc. of Anderson | 9 | 9 of 9 |
| Thrift Development Corporation | 9 | 9 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 2378290 | District 3 | S-978 Tugaloo Road Bridge Replacement in Greenville | 2 of 8 | $1,318,986 | +2.0% |
| 13 OCT 2026 | 2973031 | District 4 | Intersection Improvement - SC 5 at S-358 (Steel Hill Road) | 2 of 9 | $1,625,018 | +9.0% |
| 13 OCT 2026 | 4673600 | District 4 | Br Replacement S-46-832 over Branch of Catawba River | 2 of 8 | $2,218,372 | +7.0% |
| 09 SEP 2026 | 0965790 | District 7 | Safety Improvement - US 21/ SC 172/ SC 6 (Calhoun Co) | 3 of 8 | $2,737,040 | +6.0% |
| 09 SEP 2026 | 2069920 | District 4 | Three Bridge Replacements in Fairfield County | 8 of 9 | $9,513,265 | +27% |
| 09 SEP 2026 | 2375800 | District 3 | S-507 Brooks Ave Bridge Replacement in Greenville County | 4 of 5 | $5,406,849 | +16% |
| 11 AUG 2026 | 2970980 | District 4 | S-55 (Van Wyck Rd) bridge Replacement over Twelve Mile Creek | 6 of 7 | $11,215,919 | +30% |
| 11 AUG 2026 | 4275670 | District 3 | Bridge Replacement - S-234 over Tributary to Enoree River | 4 of 10 | $2,668,352 | +20% |
| 12 MAY 2026 | 0274010 | District 7 | Emergency Culvert Replacement – Altees Corbett Rd. (S-2-111) in Aiken County | 8 of 9 | $1,335,713 | +70% |
| 12 MAY 2026 | 4059900 | District 1 | Safety Improvement - SC 764 (Richland Co) | 5 of 7 | $445,051 | +51% |
| 14 APR 2026 | 2372300 | District 3 | Intersection Improvement S-540 @ L-1969 | 5 of 8 | $1,928,301 | +34% |
| 14 APR 2026 | 3270840 | District 1 | Improvements to S-48 (Columbia Ave) in Chapin | 3 of 5 | $65,227,657 | +20% |
| 10 MAR 2026 | 8872120 | District 2, District 3 | Intersection Improvement US 178 @ S-73/S-27 | 5 of 6 | $3,443,869 | +50% |
| 13 JAN 2026 | 2971000 | District 4 | S-294(Uriah Rd) Bridge Replacement over Camp Branch Rd | 5 of 6 | $3,422,556 | +120% |
| 13 JAN 2026 | 4070850 | District 1 | S-40-64 Arcadia Lakes Drive over Coopers Pond | 6 of 7 | $4,637,948 | +78% |
| 09 DEC 2025 | 3265530 | District 1 | Roundabout at SC 6 and S-65 | 6 of 8 | $3,313,376 | +25% |
| 12 NOV 2025 | 4674600 | District 4 | S-884 over Fishing Creek Bridge Replacement in York County | 6 of 6 | $3,587,246 | +36% |
| 14 OCT 2025 | 0251970 | District 7 | S-22 over South Edisto River #1 | 1 of 4 | $5,066,812 | Low, 6.0% under the second |
| 14 OCT 2025 | 1272231 | District 4 | SYSTEM UPGRADE: SC 901 (Edgeland Road) | 1 of 7 | $4,369,932 | Low, 3.0% under the second |
| 14 OCT 2025 | 1274610 | District 4 | SC 72 BRO South Fork Creek - Asset ID 330 | 3 of 6 | $12,908,305 | +9.0% |
| 14 OCT 2025 | 4263310 | District 3 | Replace SC 418 Bridge over Arnold Creek with Culvert | 1 of 6 | $1,778,580 | Low, 0.0% under the second |
| 09 SEP 2025 | 2370030 | District 3 | SC 124 over Saluda River Greenville County Bridge Repair | 5 of 6 | $1,733,101 | +128% |
| 09 SEP 2025 | 2970300 | District 4 | S-47 bridge replacement over Baskins Crk | 4 of 5 | $2,231,653 | +12% |
| 09 SEP 2025 | 3265540 | District 1 | Roundabout at S-279 and S-627 | 3 of 7 | $2,764,320 | +11% |
| 09 SEP 2025 | 3766490 | District 3 | S-106 (Clearmont Road) RBO Colonels Fork Creek | 2 of 5 | $3,463,607 | +1.0% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.